TMC TECHNOLOGIES OF WEST VIRGINIA CORP - SUPPORT OF IV&V OFFICE, SOFTWARE ASSURANCE TOOLS (SWAT) GROUP. NASA IV&V SOFTWARE ASSURANCE TOOLS (SWAT) GROUP SUPPORT THE INDEPENDENT VERIFICATION&VALIDATION (IV&V) PROGRAM IS RESPONSIBLE FOR PERFORMING INDEPENDENT VERIFICATION AND VALIDATION ON NASA MISSION-CRITICAL SOFTWARE. THE IV&V OFFICE (IVVO), WITHIN THE IV&V PROGRAM, CONSISTS OF FOUR FUNCTIONAL GROUPS: IV&V PROJECTS (IVVP), TECHNICAL QUALITY&EXCELLENCE (TQ&E), RESEARCH AND DEVELOPMENT (R&D) AND THE SOFTWARE ASSURANCE TOOLS (SWAT) GROUP. THE NASA IV&V SWAT GROUP SUPPORTS THE IV&V PROGRAM BY SERVING AS THE CENTRAL HUB FOR THE MANAGEMENT OF COMPUTER AIDED SOFTWARE ENGINEERING (CASE) TOOLS, AND OTHER TOOL-BASED ENGINEERING SERVICES. THE SWAT GROUP HAS BEEN CREATED TO PROMOTE THE SHARED USE OF ALL DEVELOPED AND COMMERCIAL CASE TOOLS HAVING APPLICABILITY TO IV&V ACTIVITIES. THE SWAT GROUP REQUIRES CONTRACTOR SUPPORT TO EVOLVE, EVALUATE, INTEGRATE, IMPROVE, AND MAINTAIN CASE TOOL SOLUTIONS BASED UPON THE NEEDS OF IV&V PROGRAM ACTIVITIES. CONTRACTOR SUPPORT IS ALSO REQUIRED TO MAINTAIN RESIDENT EXPERT KNOWLEDGE AND PROVIDE TRAINING ON ALL DEVELOPED OR PURCHASED CASE TOOLS UTILIZED BY THE IV&V PROGRAM ACTIVITIES. THE OBJECTIVE OF THIS REQUIREMENT IS TO SUPPORT THE NASA IV&V SWAT GROUP BY PROVIDING MANAGEMENT, CONTINUOUS IMPROVEMENT, TRAINING, AND ENGINEERING SERVICES OF THE IV&V COMPUTER AIDED SOFTWARE ENGINEERING (CASE) TOOLS THAT ARE UTILIZED BY THE IV&V PROGRAM. THE RESPONSIBILITIES OF THE CONTRACTOR ARE FURTHER DESCRIBED IN SECTION 2.0 OF THIS DOCUMENT. TO SUMMARIZE, THE CONTRACTOR SHALL SUPPORT THE SWAT GROUP IN THE FOLLOWING AREAS: - INTEGRATING RESEARCH AND DEVELOPMENT (R&D) SOLUTIONS INTO THE IVVO OPERATIONAL ENVIRONMENT - PROVIDING CONTINUOUS IMPROVEMENT OF THE SERVICES OFFERED AND THE CASE TOOLS PROVIDED AS AN OPERATIONAL CAPABILITY - SERVING AS THE PRIMARY INTERFACE FOR CASE TOOL AND HARDWARE REQUESTS FROM IVVO GROUPS - WORKING WITH THE IV&V PROGRAM SUPPORT OFFICE (PSO), INFORMATION TECHNOLOGY (IT) GROUP TO PERFORM ACCEPTANCE TESTING ON ALL CASE TOOLS BEING INTEGRATED INTO THE NASA NETWORK PRIOR TO PROMOTING CASE TOOLS AS AN OPERATIONAL CAPABILITY - SERVING AS LIAISON TO THE IV&V PROGRAM'S ENTERPRISE ARCHITECTURE BOARD (EAB) - MAINTAINING AN OPERATIONAL ENVIRONMENT PROVIDING CASE TOOLS IN SUPPORT OF THE IV&V PROGRAM AND MAINTAIN A TEST AND EVALUATION ENVIRONMENT FOR THE DEVELOPMENT AND EVALUATION OF POTENTIAL SOFTWARE ENGINEERING SOLUTIONS THAT HAVE NOT BEEN PROMOTED TO OPERATIONAL READINESS - PROVIDING MANAGEMENT SUPPORT OF SWAT INITIATIVES, TO INCLUDE, BUT NOT LIMITED TO, TRACKING AND REPORTING OF SWAT COST, SCHEDULE, AND STATUS OF IMPLEMENTED AND POTENTIAL SWAT INITIATIVES AND METHODS - PROVIDING RESIDENT EXPERTS AND TRAINING IN THE DEVELOPED OR PURCHASED CASE TOOLS OFFERED AS AN OPERATIONAL CAPABILITY TO THE GROUPS WITHIN THE IVVO (IV&V PROJECTS, RESEARCH AND DEVELOPMENT, TECHNICAL QUALITY AND EXCELLENCE) AS WELL AS TO GROUPS OUTSIDE THE IVVO (I.E., NASA IV&V SOFTWARE MISSION ASSURANCE OFFICE).
Key Details
Description
SUPPORT OF IV&V OFFICE, SOFTWARE ASSURANCE TOOLS (SWAT) GROUP. NASA IV&V SOFTWARE ASSURANCE TOOLS (SWAT) GROUP SUPPORT THE INDEPENDENT VERIFICATION&VALIDATION (IV&V) PROGRAM IS RESPONSIBLE FOR PERFORMING INDEPENDENT VERIFICATION AND VALIDATION ON NASA MISSION-CRITICAL SOFTWARE. THE IV&V OFFICE (IVVO), WITHIN THE IV&V PROGRAM, CONSISTS OF FOUR FUNCTIONAL GROUPS: IV&V PROJECTS (IVVP), TECHNICAL QUALITY&EXCELLENCE (TQ&E), RESEARCH AND DEVELOPMENT (R&D) AND THE SOFTWARE ASSURANCE TOOLS (SWAT) GROUP. THE NASA IV&V SWAT GROUP SUPPORTS THE IV&V PROGRAM BY SERVING AS THE CENTRAL HUB FOR THE MANAGEMENT OF COMPUTER AIDED SOFTWARE ENGINEERING (CASE) TOOLS, AND OTHER TOOL-BASED ENGINEERING SERVICES. THE SWAT GROUP HAS BEEN CREATED TO PROMOTE THE SHARED USE OF ALL DEVELOPED AND COMMERCIAL CASE TOOLS HAVING APPLICABILITY TO IV&V ACTIVITIES. THE SWAT GROUP REQUIRES CONTRACTOR SUPPORT TO EVOLVE, EVALUATE, INTEGRATE, IMPROVE, AND MAINTAIN CASE TOOL SOLUTIONS BASED UPON THE NEEDS OF IV&V PROGRAM ACTIVITIES. CONTRACTOR SUPPORT IS ALSO REQUIRED TO MAINTAIN RESIDENT EXPERT KNOWLEDGE AND PROVIDE TRAINING ON ALL DEVELOPED OR PURCHASED CASE TOOLS UTILIZED BY THE IV&V PROGRAM ACTIVITIES. THE OBJECTIVE OF THIS REQUIREMENT IS TO SUPPORT THE NASA IV&V SWAT GROUP BY PROVIDING MANAGEMENT, CONTINUOUS IMPROVEMENT, TRAINING, AND ENGINEERING SERVICES OF THE IV&V COMPUTER AIDED SOFTWARE ENGINEERING (CASE) TOOLS THAT ARE UTILIZED BY THE IV&V PROGRAM. THE RESPONSIBILITIES OF THE CONTRACTOR ARE FURTHER DESCRIBED IN SECTION 2.0 OF THIS DOCUMENT. TO SUMMARIZE, THE CONTRACTOR SHALL SUPPORT THE SWAT GROUP IN THE FOLLOWING AREAS: - INTEGRATING RESEARCH AND DEVELOPMENT (R&D) SOLUTIONS INTO THE IVVO OPERATIONAL ENVIRONMENT - PROVIDING CONTINUOUS IMPROVEMENT OF THE SERVICES OFFERED AND THE CASE TOOLS PROVIDED AS AN OPERATIONAL CAPABILITY - SERVING AS THE PRIMARY INTERFACE FOR CASE TOOL AND HARDWARE REQUESTS FROM IVVO GROUPS - WORKING WITH THE IV&V PROGRAM SUPPORT OFFICE (PSO), INFORMATION TECHNOLOGY (IT) GROUP TO PERFORM ACCEPTANCE TESTING ON ALL CASE TOOLS BEING INTEGRATED INTO THE NASA NETWORK PRIOR TO PROMOTING CASE TOOLS AS AN OPERATIONAL CAPABILITY - SERVING AS LIAISON TO THE IV&V PROGRAM'S ENTERPRISE ARCHITECTURE BOARD (EAB) - MAINTAINING AN OPERATIONAL ENVIRONMENT PROVIDING CASE TOOLS IN SUPPORT OF THE IV&V PROGRAM AND MAINTAIN A TEST AND EVALUATION ENVIRONMENT FOR THE DEVELOPMENT AND EVALUATION OF POTENTIAL SOFTWARE ENGINEERING SOLUTIONS THAT HAVE NOT BEEN PROMOTED TO OPERATIONAL READINESS - PROVIDING MANAGEMENT SUPPORT OF SWAT INITIATIVES, TO INCLUDE, BUT NOT LIMITED TO, TRACKING AND REPORTING OF SWAT COST, SCHEDULE, AND STATUS OF IMPLEMENTED AND POTENTIAL SWAT INITIATIVES AND METHODS - PROVIDING RESIDENT EXPERTS AND TRAINING IN THE DEVELOPED OR PURCHASED CASE TOOLS OFFERED AS AN OPERATIONAL CAPABILITY TO THE GROUPS WITHIN THE IVVO (IV&V PROJECTS, RESEARCH AND DEVELOPMENT, TECHNICAL QUALITY AND EXCELLENCE) AS WELL AS TO GROUPS OUTSIDE THE IVVO (I.E., NASA IV&V SOFTWARE MISSION ASSURANCE OFFICE).
Contractor Information
Similar Awards
INTERNATIONAL SPACE STATION
THE BOEING COMPANY
$22.3B
TAS::80 0124::TAS DESIGN, DEVELOPMENT, TEST&EVALUATION OF PROJECT ORION
LOCKHEED MARTIN CORP
$15.5B
PROVIDE DEVELOPMENTAL HARDWARE AND TEST ARTICLES, AND MANUFACTURE AND ASSEMBLE ARES I UPPER STAGES. THE UPPER STAGE (US) ELEMENT IS AN INTEGRAL PART OF THE ARES I LAUNCH VEHICLE AND PROVIDES THE SECOND STAGE OF FLIGHT. THE US ELEMENT IS RESPONSIBLE FOR THE ROLL CONTROL DURING THE FIRST STAGE BURN AND SEPARATION; AND WILL PROVIDE THE GUIDANCE AND NAVIGATION, COMMAND AND DATA HANDLING, AND OTHER AVIONICS FUNCTIONS FOR THE ARES I DURING ALL PHASES OF THE ASCENT FLIGHT. THE US ELEMENT IS A NEW DESIGN THAT EMPHASIZES SAFETY, OPERABILITY, AND MINIMUM LIFE CYCLE COST. THE OVERALL DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E), PRODUCTION, AND SUSTAINING ENGINEERING EFFORTS INCLUDE ACTIVITIES PERFORMED BY THREE ORGANIZATIONS; THE NASA DESIGN TEAM (NDT), THE UPPER STAGE PRODUCTION CONTRACTOR (USPC) AND THE INSTRUMENT UNIT PRODUCTION CONTRACTOR (IUPC). FOR CLARITY, THE USPC WILL BE REFERRED TO AS THE CONTRACTOR THROUGHOUT THIS DOCUMENT. NASA IS RESPONSIBLE FOR THE INTEGRATION OF THE PRIMARY ELEMENTS OF THE ARES I LAUNCH VEHICLE INCLUDING: THE FIRST STAGE, US INCLUDING INSTRUMENT UNIT (IU), AND US ENGINE; AND WILL ALSO INTEGRATE THE ARES I LAUNCH VEHICLE AT THE LAUNCH SITE. NASA IS RESPONSIBLE FOR THE DDT&E, INCLUDING TECHNICAL AND PROGRAMMATIC INTEGRATION OF THE US SUBSYSTEMS AND GOVERNMENT-FURNISHED PROPERTY. NASA WILL LEAD THE EFFORT TO DEVELOP THE REQUIREMENTS AND SPECIFICATIONS OF THE US ELEMENT, THE DEVELOPMENT PLAN AND TESTING REQUIREMENTS, AND ALL DESIGN DOCUMENTATION, INITIAL MANUFACTURING AND ASSEMBLY PROCESS PLANNING, LOGISTICS PLANNING, AND OPERATIONS SUPPORT PLANNING. DEVELOPMENT, QUALIFICATION, AND ACCEPTANCE TESTING WILL BE CONDUCTED BY NASA AND THE CONTRACTOR TO SATISFY REQUIREMENTS AND FOR RISK MITIGATION. NASA IS RESPONSIBLE FOR THE OVERALL UPPER STAGE VERIFICATION AND VALIDATION PROCESS AND WILL REQUIRE SUPPORT FROM THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR THE MANUFACTURE AND ASSEMBLY OF THE UPPER STAGE TEST FLIGHT AND OPERATIONAL UPPER STAGE UNITS INCLUDING THE INSTALLATION OF UPPER STAGE INSTRUMENT UNIT, THE GOVERNMENT-FURNISHED US ENGINE, BOOSTER SEPARATION MOTORS, AND OTHER GOVERNMENT-FURNISHED PROPERTY. A DESCRIPTION OF THE NASA MANAGED AND PERFORMED EFFORTS IS CONTAINED IN THE US WORK PACKAGES AND WILL BE MADE AVAILABLE TO THE CONTRACTOR TO ENSURE THEIR UNDERSTANDING OF THE ROLES AND RESPONSIBILITIES OF THE NDT, IUPC, AND CONTRACTOR DURING THE DESIGN, DEVELOPMENT, AND OPERATION OF THE US ELEMENT. THE US CONCEPTUAL DESIGN DESCRIBED IN THE USO-CLV-SE-25704 US DESIGN DEFINITION DOCUMENT (DDD) IS THE BASELINE DESIGN FOR THIS CONTRACT. THE CONTRACTORS EARLY ROLE WILL BE TO PROVIDE PRODUCIBILITY ENGINEERING SUPPORT TO NASA VIA THE ESTABLISHED US OFFICE STRUCTURE AND TO PROVIDE INPUTS INTO THE FINAL DESIGN CONFIGURATION, SPECIFICATIONS, AND STANDARDS. NASA WILL TRANSITION THE MANUFACTURING AND ASSEMBLY, LOGISTICS SUPPORT INFRASTRUCTURE, CONFIGURATION MANAGEMENT, AND THE SUSTAINING ENGINEERING FUNCTIONS TO THE CONTRACTOR AT THE KEY POINTS DURING THE DEVELOPMENT AND IMPLEMENTATION OF THE PROGRAM CURRENTLY PLANNED TO OCCUR NO LATER THAN 90 DAYS AFTER THE COMPLETION OF THE FOLLOWING MAJOR MILESTONES: MANUFACTURING AND ASSEMBLY US PRELIMINARY DESIGN REVIEW (PDR) LOGISTICS SUPPORT INFRASTRUCTURE US PDR CONFIGURATION MANAGEMENT US CRITICAL DESIGN REVIEW CDR) SUSTAINING ENGINEERING US DESIGN CERTIFICATION REVIEW (DCR) AFTER THE COMPLETION OF AN ORDERLY TRANSITION OF ROLES AND RESPONSIBILITIES TO THE CONTRACTOR, NASA WILL ASSUME AN INSIGHT ROLE INTO THE CONTRACTORS PRODUCTION, SUSTAINING ENGINEERING, AND OPERATIONS SUPPORT OF THE ARES I US TEST PROGRAM AND FLIGHT HARDWARE. AFTER DCR, THE CONTRACTOR WILL BE RESPONSIBLE FOR SUSTAINING ENGINEERING PER SOW SECTION 4.7, AS NECESSARY TO MAINTAIN AND SUPPORT THE US CONFIGURATION AND FOR PRODUCTION AND OPERATIONS SUPPORT.
THE BOEING COMPANY
$10.4B
PROVIDE DEVELOPMENTAL HARDWARE AND TEST ARTICLES, AND MANUFACTURE AND ASSEMBLE ARES I UPPER STAGES. THE UPPER STAGE (US) ELEMENT IS AN INTEGRAL PART OF THE ARES I LAUNCH VEHICLE AND PROVIDES THE SECOND STAGE OF FLIGHT. THE US ELEMENT IS RESPONSIBLE FOR THE ROLL CONTROL DURING THE FIRST STAGE BURN AND SEPARATION; AND WILL PROVIDE THE GUIDANCE AND NAVIGATION, COMMAND AND DATA HANDLING, AND OTHER AVIONICS FUNCTIONS FOR THE ARES I DURING ALL PHASES OF THE ASCENT FLIGHT. THE US ELEMENT IS A NEW DESIGN THAT EMPHASIZES SAFETY, OPERABILITY, AND MINIMUM LIFE CYCLE COST. THE OVERALL DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E), PRODUCTION, AND SUSTAINING ENGINEERING EFFORTS INCLUDE ACTIVITIES PERFORMED BY THREE ORGANIZATIONS; THE NASA DESIGN TEAM (NDT), THE UPPER STAGE PRODUCTION CONTRACTOR (USPC) AND THE INSTRUMENT UNIT PRODUCTION CONTRACTOR (IUPC). FOR CLARITY, THE USPC WILL BE REFERRED TO AS THE CONTRACTOR THROUGHOUT THIS DOCUMENT. NASA IS RESPONSIBLE FOR THE INTEGRATION OF THE PRIMARY ELEMENTS OF THE ARES I LAUNCH VEHICLE INCLUDING: THE FIRST STAGE, US INCLUDING INSTRUMENT UNIT (IU), AND US ENGINE; AND WILL ALSO INTEGRATE THE ARES I LAUNCH VEHICLE AT THE LAUNCH SITE. NASA IS RESPONSIBLE FOR THE DDT&E, INCLUDING TECHNICAL AND PROGRAMMATIC INTEGRATION OF THE US SUBSYSTEMS AND GOVERNMENT-FURNISHED PROPERTY. NASA WILL LEAD THE EFFORT TO DEVELOP THE REQUIREMENTS AND SPECIFICATIONS OF THE US ELEMENT, THE DEVELOPMENT PLAN AND TESTING REQUIREMENTS, AND ALL DESIGN DOCUMENTATION, INITIAL MANUFACTURING AND ASSEMBLY PROCESS PLANNING, LOGISTICS PLANNING, AND OPERATIONS SUPPORT PLANNING. DEVELOPMENT, QUALIFICATION, AND ACCEPTANCE TESTING WILL BE CONDUCTED BY NASA AND THE CONTRACTOR TO SATISFY REQUIREMENTS AND FOR RISK MITIGATION. NASA IS RESPONSIBLE FOR THE OVERALL UPPER STAGE VERIFICATION AND VALIDATION PROCESS AND WILL REQUIRE SUPPORT FROM THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR THE MANUFACTURE AND ASSEMBLY OF THE UPPER STAGE TEST FLIGHT AND OPERATIONAL UPPER STAGE UNITS INCLUDING THE INSTALLATION OF UPPER STAGE INSTRUMENT UNIT, THE GOVERNMENT-FURNISHED US ENGINE, BOOSTER SEPARATION MOTORS, AND OTHER GOVERNMENT-FURNISHED PROPERTY. A DESCRIPTION OF THE NASA MANAGED AND PERFORMED EFFORTS IS CONTAINED IN THE US WORK PACKAGES AND WILL BE MADE AVAILABLE TO THE CONTRACTOR TO ENSURE THEIR UNDERSTANDING OF THE ROLES AND RESPONSIBILITIES OF THE NDT, IUPC, AND CONTRACTOR DURING THE DESIGN, DEVELOPMENT, AND OPERATION OF THE US ELEMENT. THE US CONCEPTUAL DESIGN DESCRIBED IN THE USO-CLV-SE-25704 US DESIGN DEFINITION DOCUMENT (DDD) IS THE BASELINE DESIGN FOR THIS CONTRACT. THE CONTRACTORS EARLY ROLE WILL BE TO PROVIDE PRODUCIBILITY ENGINEERING SUPPORT TO NASA VIA THE ESTABLISHED US OFFICE STRUCTURE AND TO PROVIDE INPUTS INTO THE FINAL DESIGN CONFIGURATION, SPECIFICATIONS, AND STANDARDS. NASA WILL TRANSITION THE MANUFACTURING AND ASSEMBLY, LOGISTICS SUPPORT INFRASTRUCTURE, CONFIGURATION MANAGEMENT, AND THE SUSTAINING ENGINEERING FUNCTIONS TO THE CONTRACTOR AT THE KEY POINTS DURING THE DEVELOPMENT AND IMPLEMENTATION OF THE PROGRAM CURRENTLY PLANNED TO OCCUR NO LATER THAN 90 DAYS AFTER THE COMPLETION OF THE FOLLOWING MAJOR MILESTONES: MANUFACTURING AND ASSEMBLY US PRELIMINARY DESIGN REVIEW (PDR) LOGISTICS SUPPORT INFRASTRUCTURE US PDR CONFIGURATION MANAGEMENT US CRITICAL DESIGN REVIEW CDR) SUSTAINING ENGINEERING US DESIGN CERTIFICATION REVIEW (DCR) AFTER THE COMPLETION OF AN ORDERLY TRANSITION OF ROLES AND RESPONSIBILITIES TO THE CONTRACTOR, NASA WILL ASSUME AN INSIGHT ROLE INTO THE CONTRACTORS PRODUCTION, SUSTAINING ENGINEERING, AND OPERATIONS SUPPORT OF THE ARES I US TEST PROGRAM AND FLIGHT HARDWARE. AFTER DCR, THE CONTRACTOR WILL BE RESPONSIBLE FOR SUSTAINING ENGINEERING PER SOW SECTION 4.7, AS NECESSARY TO MAINTAIN AND SUPPORT THE US CONFIGURATION AND FOR PRODUCTION AND OPERATIONS SUPPORT.
THE BOEING COMPANY
$10.4B
PROVIDE DEVELOPMENTAL HARDWARE AND TEST ARTICLES, AND MANUFACTURE AND ASSEMBLE ARES I UPPER STAGES. THE UPPER STAGE (US) ELEMENT IS AN INTEGRAL PART OF THE ARES I LAUNCH VEHICLE AND PROVIDES THE SECOND STAGE OF FLIGHT. THE US ELEMENT IS RESPONSIBLE FOR THE ROLL CONTROL DURING THE FIRST STAGE BURN AND SEPARATION; AND WILL PROVIDE THE GUIDANCE AND NAVIGATION, COMMAND AND DATA HANDLING, AND OTHER AVIONICS FUNCTIONS FOR THE ARES I DURING ALL PHASES OF THE ASCENT FLIGHT. THE US ELEMENT IS A NEW DESIGN THAT EMPHASIZES SAFETY, OPERABILITY, AND MINIMUM LIFE CYCLE COST. THE OVERALL DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E), PRODUCTION, AND SUSTAINING ENGINEERING EFFORTS INCLUDE ACTIVITIES PERFORMED BY THREE ORGANIZATIONS; THE NASA DESIGN TEAM (NDT), THE UPPER STAGE PRODUCTION CONTRACTOR (USPC) AND THE INSTRUMENT UNIT PRODUCTION CONTRACTOR (IUPC). FOR CLARITY, THE USPC WILL BE REFERRED TO AS THE CONTRACTOR THROUGHOUT THIS DOCUMENT. NASA IS RESPONSIBLE FOR THE INTEGRATION OF THE PRIMARY ELEMENTS OF THE ARES I LAUNCH VEHICLE INCLUDING: THE FIRST STAGE, US INCLUDING INSTRUMENT UNIT (IU), AND US ENGINE; AND WILL ALSO INTEGRATE THE ARES I LAUNCH VEHICLE AT THE LAUNCH SITE. NASA IS RESPONSIBLE FOR THE DDT&E, INCLUDING TECHNICAL AND PROGRAMMATIC INTEGRATION OF THE US SUBSYSTEMS AND GOVERNMENT-FURNISHED PROPERTY. NASA WILL LEAD THE EFFORT TO DEVELOP THE REQUIREMENTS AND SPECIFICATIONS OF THE US ELEMENT, THE DEVELOPMENT PLAN AND TESTING REQUIREMENTS, AND ALL DESIGN DOCUMENTATION, INITIAL MANUFACTURING AND ASSEMBLY PROCESS PLANNING, LOGISTICS PLANNING, AND OPERATIONS SUPPORT PLANNING. DEVELOPMENT, QUALIFICATION, AND ACCEPTANCE TESTING WILL BE CONDUCTED BY NASA AND THE CONTRACTOR TO SATISFY REQUIREMENTS AND FOR RISK MITIGATION. NASA IS RESPONSIBLE FOR THE OVERALL UPPER STAGE VERIFICATION AND VALIDATION PROCESS AND WILL REQUIRE SUPPORT FROM THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR THE MANUFACTURE AND ASSEMBLY OF THE UPPER STAGE TEST FLIGHT AND OPERATIONAL UPPER STAGE UNITS INCLUDING THE INSTALLATION OF UPPER STAGE INSTRUMENT UNIT, THE GOVERNMENT-FURNISHED US ENGINE, BOOSTER SEPARATION MOTORS, AND OTHER GOVERNMENT-FURNISHED PROPERTY. A DESCRIPTION OF THE NASA MANAGED AND PERFORMED EFFORTS IS CONTAINED IN THE US WORK PACKAGES AND WILL BE MADE AVAILABLE TO THE CONTRACTOR TO ENSURE THEIR UNDERSTANDING OF THE ROLES AND RESPONSIBILITIES OF THE NDT, IUPC, AND CONTRACTOR DURING THE DESIGN, DEVELOPMENT, AND OPERATION OF THE US ELEMENT. THE US CONCEPTUAL DESIGN DESCRIBED IN THE USO-CLV-SE-25704 US DESIGN DEFINITION DOCUMENT (DDD) IS THE BASELINE DESIGN FOR THIS CONTRACT. THE CONTRACTORS EARLY ROLE WILL BE TO PROVIDE PRODUCIBILITY ENGINEERING SUPPORT TO NASA VIA THE ESTABLISHED US OFFICE STRUCTURE AND TO PROVIDE INPUTS INTO THE FINAL DESIGN CONFIGURATION, SPECIFICATIONS, AND STANDARDS. NASA WILL TRANSITION THE MANUFACTURING AND ASSEMBLY, LOGISTICS SUPPORT INFRASTRUCTURE, CONFIGURATION MANAGEMENT, AND THE SUSTAINING ENGINEERING FUNCTIONS TO THE CONTRACTOR AT THE KEY POINTS DURING THE DEVELOPMENT AND IMPLEMENTATION OF THE PROGRAM CURRENTLY PLANNED TO OCCUR NO LATER THAN 90 DAYS AFTER THE COMPLETION OF THE FOLLOWING MAJOR MILESTONES: MANUFACTURING AND ASSEMBLY US PRELIMINARY DESIGN REVIEW (PDR) LOGISTICS SUPPORT INFRASTRUCTURE US PDR CONFIGURATION MANAGEMENT US CRITICAL DESIGN REVIEW CDR) SUSTAINING ENGINEERING US DESIGN CERTIFICATION REVIEW (DCR) AFTER THE COMPLETION OF AN ORDERLY TRANSITION OF ROLES AND RESPONSIBILITIES TO THE CONTRACTOR, NASA WILL ASSUME AN INSIGHT ROLE INTO THE CONTRACTORS PRODUCTION, SUSTAINING ENGINEERING, AND OPERATIONS SUPPORT OF THE ARES I US TEST PROGRAM AND FLIGHT HARDWARE. AFTER DCR, THE CONTRACTOR WILL BE RESPONSIBLE FOR SUSTAINING ENGINEERING PER SOW SECTION 4.7, AS NECESSARY TO MAINTAIN AND SUPPORT THE US CONFIGURATION AND FOR PRODUCTION AND OPERATIONS SUPPORT.
THE BOEING COMPANY
$10.3B
Stay Updated
Get notified about new opportunities matching your interests.