BLUEGRASS CONTRACTING CORP - PROJECT DC NP ROCR 2(2): THE PROJECT CONSISTS OF REPAIR OF THE L STREET BRIDGE OVER ROCK CREEK. THE WORK INCLUDES SCOUR REPAIR ON THE SOUTH ABUTMENT, STRUCTURAL STEEL PAINING, MINOR REPAIR ON THE ADJACENT PEDESTRIAN BRIDGE, AND OTHER MISCELLANEOUS W
Key Details
Description
PROJECT DC NP ROCR 2(2): THE PROJECT CONSISTS OF REPAIR OF THE L STREET BRIDGE OVER ROCK CREEK. THE WORK INCLUDES SCOUR REPAIR ON THE SOUTH ABUTMENT, STRUCTURAL STEEL PAINING, MINOR REPAIR ON THE ADJACENT PEDESTRIAN BRIDGE, AND OTHER MISCELLANEOUS W
Context & Analysis
On Dec 31, 2024, Department of Transportation obligated $1,441,245 to BLUEGRASS CONTRACTING CORP for project dc np rocr 2(2): the project consists of repair of the l street bridge over rock creek. the work includes scour repair on the south abutment, structural steel paining, minor repair on the adja…. The award is classified under NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Performance is located in WASHINGTON, DC. The contract is scheduled through Aug 31, 2028. This award is one of several similar procurements from Department of Transportation under NAICS 237310 — related awards are listed below.
Contractor Information
Similar Awards
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.9M
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.0M
NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL
FORT MYER CONSTRUCTION CORP
$173.1M
NP-COLO 1A21, B42, C18, D51 - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 10.3 MILES OF THE COLONIAL PARKWAY (PARKWAY) FROM MILEPOST (MP) 0.17 TO MP 1.61 AND MP 6.02 TO MP 14.88 WITHIN COLONIAL NATIONAL HISTORICAL PARK. THE WORK INCL
WAGMAN HEAVY CIVIL INC
$130.1M
NP-COLO 1A21, B42, C18, D51 - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 10.3 MILES OF THE COLONIAL PARKWAY (PARKWAY) FROM MILEPOST (MP) 0.17 TO MP 1.61 AND MP 6.02 TO MP 14.88 WITHIN COLONIAL NATIONAL HISTORICAL PARK. THE WORK INCL
WAGMAN HEAVY CIVIL INC
$130.1M
Stay Updated
Get notified about new opportunities matching your interests.