This contract expires in 105 days (Jul 31, 2026).
BURTON CONSTRUCTION, INC. - THE WORK COVERED UNDER THIS SPECIFICATION INCLUDES THE INSTALLATION OF A NEW INSTRUMENT LANDING SYSTEM (ILS) AND FIBER OPTIC TRANSMISSION SYSTEM (FOTS) AND THE REPLACEMENT OF AN EXISTING ILS AND RUNWAY VISUAL RANGE (RVR) AT THE CRATER LAKE, KLAMATH R
Key Details
Description
THE WORK COVERED UNDER THIS SPECIFICATION INCLUDES THE INSTALLATION OF A NEW INSTRUMENT LANDING SYSTEM (ILS) AND FIBER OPTIC TRANSMISSION SYSTEM (FOTS) AND THE REPLACEMENT OF AN EXISTING ILS AND RUNWAY VISUAL RANGE (RVR) AT THE CRATER LAKE, KLAMATH R
Contractor Information
Similar Awards
THE OBJECTIVE OF THIS EFFORT IS TO REPLACE THE EXISTING MAIN SUBSTATION WITH A 69KV RING BUS FEATURING AUTOMATED SWITCHING OPERATIONS. THE NEW RING BUS WILL BE CAPABLE OF FAULT DETECTION AND AUTOMATED SELF-RESTORATION. THE PROJECT WILL BE INTEGRATED
SCALFO ELECTRIC INC.
$24.2M
THE OBJECTIVE OF THIS EFFORT IS TO REPLACE THE EXISTING MAIN SUBSTATION WITH A 69KV RING BUS FEATURING AUTOMATED SWITCHING OPERATIONS. THE NEW RING BUS WILL BE CAPABLE OF FAULT DETECTION AND AUTOMATED SELF-RESTORATION. THE PROJECT WILL BE INTEGRATED
SCALFO ELECTRIC INC.
$24.2M
THE CONTRACTOR SHALL PROVIDE ALL PROGRAM SUPPORT
CROWN INNOVATIONS, INC.
$17.7M
TO PROVIDE ACL PROGRAM SUPPORT
CROWN INNOVATIONS, INC.
$3.9M
JACKSONVILLE, FL (JAX) RCAG SITE REPLACEMENT AND TAMPA BAY, FL (TPAA) RTR SITE REPLACEMENT IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
INTERNATIONAL TOWERS LLC
$2.8M
Stay Updated
Get notified about new opportunities matching your interests.