This contract expires in 20 days (Jun 30, 2026).

Browse related active opportunities

FIRM FIXED PRICENO SET ASIDE USED.

BUTLER PARACHUTE SYSTEMS, INC - CUSTOM PARACHUTE (X2) AND DROP TESTS WITH FULL REPORT

PIID: 80NSSC26P0001Solicitation ID: 80NSSC25918115Q
Signed Date: Feb 5, 2026Effective Date: Oct 16, 2025End Date: Closes in 20 days
Award $
$55K
Vendor
BUTLER PARACHUTE SYSTEMS, INC
NAICS
541330
Signed Date
Feb 5, 2026

Key Details

Dollars Obligated
$55,000
Base & All Options
Awarding Sub-Agency
National Aeronautics and Space Administration
Product Service Code
AA11 - AGRICULTURE R&D SERVICES; AGRICULTURAL RESEARCH AND SERVICES; BASIC RESEARCH
Extent Competed
NOT COMPETED UNDER SAP
Number of Offers
1
Place of Performance
ROANOKE, VA, 240175514, CD-VA-06

Description

CUSTOM PARACHUTE (X2) AND DROP TESTS WITH FULL REPORT

Context & Analysis

On Feb 5, 2026, National Aeronautics and Space Administration obligated $55,000 to BUTLER PARACHUTE SYSTEMS, INC for custom parachute (x2) and drop tests with full report. The award is classified under NAICS 541330 — ENGINEERING SERVICES and issued as a firm fixed price contract. Competition extent: not competed under sap with 1 offer received. The procurement used a NO SET ASIDE USED. set-aside. Performance is located in ROANOKE, VA. The contract is scheduled through Jun 30, 2026 — approximately 1 month remaining. This award is one of several similar procurements from National Aeronautics and Space Administration under NAICS 541330 — related awards are listed below.

Contractor Information

UEI: E1URFZC1QLL7
CAGE Code: 0D4Z0
Location: ROANOKE, VA

Similar Awards

TAS::80 0122::TAS DEVELOPMENT, MANUFACTURING AND SUPPORT TO WEATHER OBSERVING INSTRUMENT

L3HARRIS TECHNOLOGIES, INC.

$1.0B

GROUND SYSTEMS AND MISSION OPERATIONS (GSMO-3)

KBR WYLE SERVICES, LLC

$547.8M

IGF::OT::IGF GROUND SYSTEMS AND MISSION OPERATIONS 2 (GSMO-2). THE PURPOSE OF THIS PROCUREMENT IS TO ACQUIRE ENGINEERING SERVICES FOR GROUND SYSTEMS AND MISSION OPERATIONS SUPPORT TO MORE THAN 20 MISSIONS IN PHASES OF THE LIFECYCLE FROM PRE-PHASE A TO PHASE E. THE SCOPE ENCOMPASSES CONCEPT STUDIES, DEVELOPMENT (DEFINITION AND IMPLEMENTATION), INTEGRATION, TEST, VERIFICATION, OPERATIONS, SUSTAINMENT OF MISSION OPERATIONS SYSTEMS, SUBSYSTEMS, AND OPERATIONS PROCESSES AND PROCEDURES. SERVICES INVOLVE SYSTEMS ENGINEERING, FACILITY ENGINEERING, LAUNCH AND EARLY ORBIT SUPPORT, FLIGHT OPERATIONS, FLIGHT DYNAMICS SUPPORT, AND SUSTAINING ENGINEERING.

KBR WYLE SERVICES, LLC

$506.6M

TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS

LOCKHEED MARTIN CORPORATION

$486.1M

IGF::OT::IGF EXPENDABLE LAUNCH VEHICLE INTEGRATED SUPPORT 3 (ELVIS 3)

AI SOLUTIONS INC

$372.2M

Stay Updated

Get notified about new opportunities matching your interests.

Related