CENTRAL SOUTHERN CONSTRUCTION CORP. - PROJECT NP SLBE 5109(1): THE PROJECT CONSISTS OF CONSTRUCTING LEFT AND RIGHT TURNING LANES ON SOUTH DUNE HIGHWAY (M-109) AT DUNE CLIMB PARKING AREA (ROUTE 920). THE WORK INCLUDES GRADING; AGGREGATE BASE; ASPHALT PAVEMENT MILLING; CONCRETE PAVING; MS
Key Details
Description
PROJECT NP SLBE 5109(1): THE PROJECT CONSISTS OF CONSTRUCTING LEFT AND RIGHT TURNING LANES ON SOUTH DUNE HIGHWAY (M-109) AT DUNE CLIMB PARKING AREA (ROUTE 920). THE WORK INCLUDES GRADING; AGGREGATE BASE; ASPHALT PAVEMENT MILLING; CONCRETE PAVING; MS
Context & Analysis
On Dec 2, 2025, Department of Transportation obligated $2,592,162.81 to CENTRAL SOUTHERN CONSTRUCTION CORP. for project np slbe 5109(1): the project consists of constructing left and right turning lanes on south dune highway (m-109) at dune climb parking area (route 920). the work includes grading; aggregate ba…. The award is classified under NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION and issued as a firm fixed price contract. Competition extent: full and open competition. Performance is located in EMPIRE, MI. This award is one of several similar procurements from Department of Transportation under NAICS 237310 — related awards are listed below.
Contractor Information
Similar Awards
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.9M
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.0M
NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL
FORT MYER CONSTRUCTION CORP
$173.1M
NP-COLO 1A21, B42, C18, D51 - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 10.3 MILES OF THE COLONIAL PARKWAY (PARKWAY) FROM MILEPOST (MP) 0.17 TO MP 1.61 AND MP 6.02 TO MP 14.88 WITHIN COLONIAL NATIONAL HISTORICAL PARK. THE WORK INCL
WAGMAN HEAVY CIVIL INC
$130.1M
NP-COLO 1A21, B42, C18, D51 - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 10.3 MILES OF THE COLONIAL PARKWAY (PARKWAY) FROM MILEPOST (MP) 0.17 TO MP 1.61 AND MP 6.02 TO MP 14.88 WITHIN COLONIAL NATIONAL HISTORICAL PARK. THE WORK INCL
WAGMAN HEAVY CIVIL INC
$130.1M