This contract expires in 414 days (Oct 31, 2027).
CENTRAL SOUTHERN CONSTRUCTION CORP. - NC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TO
Key Details
Description
NC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TO
Context & Analysis
On Dec 23, 2024, Department of Transportation obligated $2,279,350 to CENTRAL SOUTHERN CONSTRUCTION CORP. for nc erfo np blri 2024-1(2): the project consists of stabilizing damage to the blue ridge parkway caused by hurricane helene. the work includes stabilizing an embankment with nc dot shot rock, installin…. The award is classified under NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Performance is located in LINVILLE, NC. The contract is scheduled through Oct 31, 2027 — approximately 14 months remaining. This award is one of several similar procurements from Department of Transportation under NAICS 237310 — related awards are listed below.
Contractor Information
Similar Awards
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.9M
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.0M
NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL
FORT MYER CONSTRUCTION CORP
$173.1M
NP-COLO 1A21, B42, C18, D51 - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 10.3 MILES OF THE COLONIAL PARKWAY (PARKWAY) FROM MILEPOST (MP) 0.17 TO MP 1.61 AND MP 6.02 TO MP 14.88 WITHIN COLONIAL NATIONAL HISTORICAL PARK. THE WORK INCL
WAGMAN HEAVY CIVIL INC
$130.1M
NP-COLO 1A21, B42, C18, D51 - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 10.3 MILES OF THE COLONIAL PARKWAY (PARKWAY) FROM MILEPOST (MP) 0.17 TO MP 1.61 AND MP 6.02 TO MP 14.88 WITHIN COLONIAL NATIONAL HISTORICAL PARK. THE WORK INCL
WAGMAN HEAVY CIVIL INC
$130.1M