This contract expires in 204 days (Dec 31, 2026).
CENTRAL TEXAS EXPRESS METALWORK, LLC - INSTALL NEW ROOFING, GUTTER AND DOWNSPOUT SYSTEMS TO BUILDINGS WHICH HAVE INCURRED DEFERRED MAINTENANCE AT THE PSGRU STILLWATER, OK SITE.
Key Details
Description
INSTALL NEW ROOFING, GUTTER AND DOWNSPOUT SYSTEMS TO BUILDINGS WHICH HAVE INCURRED DEFERRED MAINTENANCE AT THE PSGRU STILLWATER, OK SITE.
Context & Analysis
On Jan 12, 2026, Department of Agriculture obligated $658,171.81 to CENTRAL TEXAS EXPRESS METALWORK, LLC for install new roofing, gutter and downspout systems to buildings which have incurred deferred maintenance at the psgru stillwater, ok site.. The award is classified under NAICS 238160 — ROOFING CONTRACTORS and issued as a firm fixed price contract. Competition extent: full and open competition after exclusion of sources. Performance is located in STILLWATER, OK. The contract is scheduled through Dec 31, 2026 — approximately 7 months remaining. This award is one of several similar procurements from Department of Agriculture under NAICS 238160 — related awards are listed below.
Contractor Information
Similar Awards
ROOF REPLACEMENT FOR B303, B1043, B209, AND B010A
MIDNIGHT SUN AUS LLC
$3.4M
JOB CORPS: GRO MULTI-BLDG ROOF REPLACEMENT
JAXON CONSTRUCTION INC
$543,608.48
MORATORIUM EXCEPTION: EMERGENCY - IMMINENT THREAT TO PROPERTY - ANGELL JOB CORPS CENTER SITKA DORM ROOFING REPLACEMENT. PROJECT TO REPLACE THE ACTIVELY LEAKING ROOF ON THE LARGE DORM AT THE JOB CORPS CENTER. REMOVE SHINGLE ROOFING, REPAIR/REPLACE DEC
TACTICAL ROOFING AND CONSTRUCTION LLC
$489,341.58
REMOVE AND REPLACE EXISTING FLAT ROOF SYSTEM OF APPROXIMATELY 81,000 SF, PROVIDE WALKING PATH AROUND CHILLER, AIR HANDLERS, AND ROOFTOP EQUIPMENT.
CENTRAL TEXAS EXPRESS METALWORK, LLC
$444,756.97
BLY RANGER STATION ROOF REPLACEMENTS
GRANITE GROUP, LLC
$421,590