This contract expires in 18 days (Sep 30, 2026).
CIRCLE V HARVESTING CO. - ROAD MAINTENANCE ACTIVITIES IN SUPPORT OF ROCK CREEK IRTC
Key Details
Description
ROAD MAINTENANCE ACTIVITIES IN SUPPORT OF ROCK CREEK IRTC
Context & Analysis
On May 6, 2026, Department of Agriculture obligated $158,139.01 to CIRCLE V HARVESTING CO. for road maintenance activities in support of rock creek irtc. The award is classified under NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Performance is located in TRES PIEDRAS, NM. The contract is scheduled through Sep 30, 2026 — approximately 1 month remaining. This award is one of several similar procurements from Department of Agriculture under NAICS 237310 — related awards are listed below.
Contractor Information
Similar Awards
MORATORIUM EXCEPTION" BLI DDVAK725 HURRICANE HELENE VCT DISASTER RECON DESIGN-BUILD HURRICANE HELENE IN VA
KIEWIT INFRASTRUCTURE SOUTH CO
$260.6M
MORATORIUM EXCEPTION" BLI DDVAK725 HURRICANE HELENE VCT DISASTER RECON DESIGN-BUILD HURRICANE HELENE IN VA
KIEWIT INFRASTRUCTURE SOUTH CO
$241.8M
MORATORIUM EXCEPTION" BLI DDVAK725 HURRICANE HELENE VCT DISASTER RECON DESIGN-BUILD HURRICANE HELENE IN VA
KIEWIT INFRASTRUCTURE SOUTH CO
$240.6M
THE GILA NATIONAL FOREST HAS A REQUIREMENT FOR THE REHABILITATION AND MAINTENANCE OF NATIONAL FOREST SYSTEM ROAD (NFSR) 141 FROM MILEPOST 0.69 TO MILEPOST 18.81. WORK INCLUDES BUT IS NOT LIMITED TO PULVERIZING THE ENTIRE EXISTING CHIP SEAL SURFACE T
SURFACE CONTRACTING, INC
$13.3M
THIS PROJECT IS FOR ROAD REPAIR CONSTRUCTION SERVICES ON THE MONONGAHELA NATIONAL FOREST, FOREST ROAD 86. WORK INCLUDES BUT IS NOT LIMITED TO BASE FAILURE REPAIR, PAVEMENT FAILURE REPAIR, AND RESURFACING.
GAVER INDUSTRIES, INC.
$8.2M
Stay Updated
Get notified about new opportunities matching your interests.