CIVIL BUILT LLC - BASE ITEM WORK INCLUDES SELECTIVE CLEARING (ROADSIDE BRUSH CUTTING), ROAD RECONDITIONING, CLEANING DITCHES, INSTALLING AND MAINTAINING DRAIN DIPS AND WATER BARS, MINOR ROAD REPAIR, PLACING RIPRAP, AND INSTALLING A ROCK BARRIER IN COMPLIANCE WITH TERM
Key Details
Description
BASE ITEM WORK INCLUDES SELECTIVE CLEARING (ROADSIDE BRUSH CUTTING), ROAD RECONDITIONING, CLEANING DITCHES, INSTALLING AND MAINTAINING DRAIN DIPS AND WATER BARS, MINOR ROAD REPAIR, PLACING RIPRAP, AND INSTALLING A ROCK BARRIER IN COMPLIANCE WITH TERM
Context & Analysis
On Feb 24, 2026, Department of Agriculture obligated $83,060 to CIVIL BUILT LLC for base item work includes selective clearing (roadside brush cutting), road reconditioning, cleaning ditches, installing and maintaining drain dips and water bars, minor road repair, placing riprap, and…. The award is classified under NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION and issued as a firm fixed price contract. Competition extent: competed under sap with 1 offer received. The procurement used a SMALL BUSINESS SET ASIDE - TOTAL set-aside. Performance is located in COEUR D ALENE, ID. This award is one of several similar procurements from Department of Agriculture under NAICS 237310 — related awards are listed below.
Contractor Information
Similar Awards
MORATORIUM EXCEPTION" BLI DDVAK725 HURRICANE HELENE VCT DISASTER RECON DESIGN-BUILD HURRICANE HELENE IN VA
KIEWIT INFRASTRUCTURE SOUTH CO
$260.6M
MORATORIUM EXCEPTION" BLI DDVAK725 HURRICANE HELENE VCT DISASTER RECON DESIGN-BUILD HURRICANE HELENE IN VA
KIEWIT INFRASTRUCTURE SOUTH CO
$241.8M
THE GILA NATIONAL FOREST HAS A REQUIREMENT FOR THE REHABILITATION AND MAINTENANCE OF NATIONAL FOREST SYSTEM ROAD (NFSR) 141 FROM MILEPOST 0.69 TO MILEPOST 18.81. WORK INCLUDES BUT IS NOT LIMITED TO PULVERIZING THE ENTIRE EXISTING CHIP SEAL SURFACE T
SURFACE CONTRACTING, INC
$13.3M
THIS PROJECT IS FOR ROAD REPAIR CONSTRUCTION SERVICES ON THE MONONGAHELA NATIONAL FOREST, FOREST ROAD 86. WORK INCLUDES BUT IS NOT LIMITED TO BASE FAILURE REPAIR, PAVEMENT FAILURE REPAIR, AND RESURFACING.
GAVER INDUSTRIES, INC.
$8.2M
UNAKA ROAD REPAIRS FROM HURRICANE HELENE. REPLACEMENT OR REPAIR OF 22 MILES OF ROAD.
WILLIAMS CONSTRUCTION & CABINETRY, INC.
$7.5M
Stay Updated
Get notified about new opportunities matching your interests.