CMIP LLC - TRANSPORTATION TECHNOLOGY CENTER (TTC) OPS SECOND FLOOR STOREFRONT DOORS PROJECT: INSTALL A FRAMED GLASS WALL WITH SIDELIGHTS AND FLOOR TO CEILING DOUBLE DOORS TO MATCH EXISTING FINISH (ADA ACCESS).

PIID: 693JJ624P000019
Signed Date: Sep 24, 2024Effective Date: Sep 30, 2024End Date: Closed on Apr 15, 2025
Award $
$32K
Vendor
CMIP LLC
NAICS
236220
Signed Date
Sep 24, 2024

Key Details

Dollars Obligated
$32,037.99
Awarding Sub-Agency
Federal Railroad Administration
Product Service Code
Z2AA - REPAIR OR ALTERATION OF OFFICE BUILDINGS
Place of Performance
SILVER SPRING, MD

Description

TRANSPORTATION TECHNOLOGY CENTER (TTC) OPS SECOND FLOOR STOREFRONT DOORS PROJECT: INSTALL A FRAMED GLASS WALL WITH SIDELIGHTS AND FLOOR TO CEILING DOUBLE DOORS TO MATCH EXISTING FINISH (ADA ACCESS).

Context & Analysis

On Sep 24, 2024, Department of Transportation obligated $32,037.99 to CMIP LLC for transportation technology center (ttc) ops second floor storefront doors project: install a framed glass wall with sidelights and floor to ceiling double doors to match existing finish (ada access).. The award is classified under NAICS 236220 — COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION. Performance is located in SILVER SPRING, MD. This award is one of several similar procurements from Department of Transportation under NAICS 236220 — related awards are listed below.

Contractor Information

Contractor: CMIP LLC
UEI: E4UCGJ1NLLQ8
Location: LANCASTER, CA

Stay Updated