This contract expires in 215 days (May 28, 2027).
CMP COMMERCIAL CONSTRUCTION INC - BIL-FUNDED. REPLACE UNDERGROUND SITE UTILITIES AND PARKING LOT REFURBISHMENT AT KANSAS CITY AIR ROUTE TRAFFIC CONTROL CENTER (ZKC).
Key Details
Description
BIL-FUNDED. REPLACE UNDERGROUND SITE UTILITIES AND PARKING LOT REFURBISHMENT AT KANSAS CITY AIR ROUTE TRAFFIC CONTROL CENTER (ZKC).
Context & Analysis
On Jan 13, 2026, Department of Transportation obligated $12,768,344.86 to CMP COMMERCIAL CONSTRUCTION INC for bil-funded. replace underground site utilities and parking lot refurbishment at kansas city air route traffic control center (zkc).. The award is classified under NAICS 237110 — WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION and issued as a firm fixed price contract. Competition extent: full and open competition after exclusion of sources with 1 offer received. The procurement used a NO SET ASIDE USED. set-aside. Performance is located in OLATHE, KS. The contract is scheduled through May 28, 2027 — approximately 7 months remaining. This award is one of several similar procurements from Department of Transportation under NAICS 237110 — related awards are listed below.
Market context
- Recompete outlook
- Ends May 28, 2027, in 7 months. Recompete signal as of Oct 23, 2026: 62/100, combining time to the end date, the incumbent's history with this agency, whether the award was competed, and its size.
- Incumbent at this agency
- CMP COMMERCIAL CONSTRUCTION INC has 7 other awards from Department of Transportation, totalling $5.3M, 2017–2026.
- Largest vendors in this market
By obligations, Department of Transportation awards in NAICS 237110 over the last 3 years.
- WIIPICA QRI JV LLC — 2 awards, $24.4M
- AHTNA INFRASTRUCTURE & TECHNOLOGIES LLC — 1 award, $11.1M
- VALOR CONSTRUCTION MANAGEMENT, LLC — 1 award, $1.5M
- CORNERSTONE CONSTRUCTION SERVICES, LLC — 1 award, $483K
- THE PLUMBING SHOP, INC — 1 award, $108K
Computed from USAspending award data on Oct 23, 2026.
Contractor Information
Similar Awards
BIL FUNDED WASHINGTON UNDERGROUND UTILITY PROJECT, AT THE ARTCC, LEESBURG, VA
WIIPICA QRI JV LLC
$12.2M
IIJA-FUNDED UNDERGROUND UTILITIES REPLACEMENT AND PARKING LOT REFURBISHMENT PROJECT AT FAA'S DENVER AIR ROUTE TRAFFIC CONTROL CENTER (ARTCC) LOCATED IN LONGMONT, COLORADO.
AHTNA INFRASTRUCTURE & TECHNOLOGIES LLC
$11.1M
ZMA IMPROVE SITE DRAINAGE, MIAMI AIR ROUTE TRAFFIC CONTROL CENTER, MIAMI, FL REPAIR AND MAINTENANCE OF EXISTING STORM DRAINAGE
VALOR CONSTRUCTION MANAGEMENT, LLC
$1.5M
REPLACE THE EXISTING FACILITY BACKFLOW PREVENTER AND REPLACE WITH ABOVE GROUND PREVENTER IN A HEATED ENCLOSURE. REPLACE THE FACILITIES MAIN WATER SHUTOFF VALVE.
CORNERSTONE CONSTRUCTION SERVICES, LLC
$483,000
ZJX ARTCC OUTFALL PUMP REPLACEMENT, AIR ROUTE TRAFFIC CONTROL CENTER, HILLIARD FL, SOW AND IGCE ATTACHED, NTE 82,100.00
THE PLUMBING SHOP, INC
$107,586.54
Stay Updated
Get notified about new opportunities matching your interests.