NORTHROP GRUMMAN SYSTEMS CORPORATION
Federal contractor profile
Intelligence Summary
# Vendor Assessment: Northrop Grumman Systems Corporation
## Overview
Northrop Grumman Systems Corporation demonstrates significant scale in federal contracting with 1,000 awards totaling $75.8B across 10 agencies and 10 NAICS codes. However, this portfolio reveals notable concentration vulnerabilities that warrant strategic attention.
## Agency Concentration Risk
The vendor exhibits high concentration risk with the Department of Defense representing 69% ($52.5B) of total obligated value across 703 awards. NASA contributes an additional 25% ($18.7B) through just 29 awards, meaning two agencies account for 94% of total contract value. The remaining eight agencies collectively represent only $3.4B (6%), indicating minimal diversification beyond defense and aerospace sectors.
## Contract Expiry Exposure
With $14.2B in contracts expiring within 18 months (approximately 19% of total portfolio), Northrop Grumman faces moderate near-term recompete pressure. This exposure level requires active pipeline management to maintain revenue stability.
## NAICS Diversification
The NAICS distribution shows limited diversification with heavy emphasis on technical services (541511, 541512) and aerospace manufacturing (336413). The top three NAICS codes encompass 538 awards, suggesting concentration in core competencies rather than broad market diversification.
## Strategic Outlook
Northrop Grumman maintains a dominant position in defense and aerospace but faces strategic vulnerability from agency over-concentration. Expansion into civilian agencies beyond HHS remains underdeveloped despite existing capabilities.
Generated September 6, 2026
Top Agencies
| Agency | Awards | Total Obligated |
|---|---|---|
| Department of Defense | 703 | $52.5B |
| National Aeronautics and Space Administration | 30 | $18.7B |
| Department of Health and Human Services | 176 | $2.1B |
| Social Security Administration | 2 | $740.6M |
| Department of Homeland Security | 31 | $589.6M |
| General Services Administration | 19 | $463.9M |
| Department of the Treasury | 11 | $379.1M |
| Department of Justice | 4 | $189.7M |
| Department of Transportation | 8 | $106.3M |
| Department of the Interior | 5 | $52.0M |
Top NAICS Codes
| NAICS Code | Description | Awards |
|---|---|---|
| 541511 | - | 267 |
| 541512 | - | 150 |
| 336413 | OTHER AIRCRAFT PARTS AND AUXILIARY EQUIPMENT MANUFACTURING | 120 |
| 541330 | ENGINEERING SERVICES | 83 |
| 541715 | RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY) | 39 |
| 541611 | ADMINISTRATIVE MANAGEMENT AND GENERAL MANAGEMENT CONSULTING SERVICES | 36 |
| 334511 | SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING | 25 |
| 541519 | OTHER COMPUTER RELATED SERVICES | 18 |
| 334220 | RADIO AND TELEVISION BROADCASTING AND WIRELESS COMMUNICATIONS EQUIPMENT MANUFACTURING | 16 |
| 541513 | - | 15 |
Expiring Contracts (184)
E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-2)
IRBM TARGETS
INTEGRATED BATTLE COMMAND SYSTEM (IBCS) HARDWARE LOW RATE INITIAL PRODUCTION/FULL RATE PRODUCTION (LRIP/FRP).
GWS SOFTWARE DEVELOPMENT (GFC, IDT, GSS,
CONTRACTOR LOGISTICS SUPPORT AND SERVICES (CLS VII) FOR THE RG-4 GLOBAL HAWK PLATFORM.
IGF::OT::IGF GUN MISSION MODULES (GMM)
TYPE 4 SUBSCALE TARGETS
TYPE 4 SUBSCALE TARGETS
INTELLIGENCE SYSTEMS INFRASTRUCTURE, TOOLS, AND ENHANCEMENTS (INSITE)
SUSTAINMENT- CONTRACTOR LOGISTICS SUPPORT FOR JAPAN, REPUBLIC OF KOREA (ROK), AND NORTH ATLANTIC TREATY ORGANIZATION (NATO).
P-3 AIRCRAFT MAINTENANCE AND LOGISTIC SUPPORT SERVICES
GMD BOOST VEHICLES
DEFENSE EXPERIMENTATION USING COMMERCIAL SPACE INTERNET CALL 003 MULTI-BAND, MULTI-ORBIT SATELLITE COMMUNICATIONS EXPERIMENTS
GREEN WAVE MISSION TASK ORDER
THE PURPOSE OF THIS DELIVERY ORDER IS TO INCORPORATE THE CY25 LAIRCM HARDWARE BASE-BUY DELIVERY ORDER AND RELATED FUNDS OBLIGATION.
THE PURPOSE OF THIS DELIVERY ORDER IS TO INCORPORATE THE CY25 LAIRCM HARDWARE BASE-BUY DELIVERY ORDER AND RELATED FUNDS OBLIGATION.
JAPAN E-2C/E-2D CY21 ISS & TECH SUPPORT
PROVIDE AIRCRAFT AND GROUND CONTROL STATION (GCS) SPARE PARTS AND PROVIDE ENGINEERING, MAINTENANCE TECHNICIAN, LOGISTICS TECHNICIAN AND PILOT SUPPORT.
HELIOSWARM PROGRAM SUPPORT
GLOBAL COMMAND AND CONTROL SYSTEM JOINT SOFTWARE SUSTAINMENT AND MODERNIZATION. MISSION CRITICAL ENGINEERING, SOFTWARE DEVELOPMENT, AND CYBER-SECURITY INFORMATION ASSURANCE SUPPORT.
SEWIP BLOCK 3 DESIGN AGENT
LITENING CATP TARGETING PODS
LITENING CATP TARGETING PODS
IGF::CT::IGF SENSOR SUSTAINMENT CONTRACT
THE ADVANCED TECHNOLOGY SUPPORT PROGRAM (ATSP) CONTRACT ACQUIRED PROGRESSIVE MICROELECTRONIC CAPABILITY SOLUTIONS TO IMPROVE PERFORMANCE, IMPROVE RELIABILITY AND MAINTAINABILITY OF THE MICROELECTRONICS-BASED G/ATOR RSP REFRESH SYSTEM
DIGITAL INFRASTRUCTURE CONSORTIUM FOR ADVANCED BATTLE MANAGEMENT SYSTEM
LITENING ADVANCED TARGETING PODS
OPERATIONS & SUSTAINMENT SUPPORT
LINK 16 UH-1Y/AH-1Z A KITS, B KITS, FTDS AND SPARES
LINK 16 UH-1Y/AH-1Z- B KIT
DARPA RESEARCH PROJECT
WIDEBAND SATELLITE COMMUNICATIONS (SATCOM) TREND ANALYSIS AND ANOMALY RESOLUTION SUBSYSTEM (WSTARS) FOR WIDEBAND GLOBAL SATCOM 11 (WGS-11)
LABOR - TECHNICAL ASSISTANT
ARC UPGRADE III
DECISION SUPPORT SERVICES (DSS) PURSUANT TO 10 USC 2371B(F)
705 COMBAT TRAINING SQUADRON, KIRTLAND AFB NM - INFRASTRUCTURE, DEVELOPMENT AND ENGINEERING (IDE) SUPPORT SERVICES. CONTRACTOR MAINTAINS THE 705 CTS INFORMATION TECHNOLOGY REQUIREMENTS FOR THE BATTLESPACE.
MK44 MOD 4, 30MM, GUNS WITH SPARES/SPECIAL TOOLING
PAM,AIRCRAFT,MATERI
THE ADVANCED TECHNOLOGY SUPPORT PROGRAM (ATSP) CONTRACT ACQUIRED PROGRESSIVE MICROELECTRONIC CAPABILITY SOLUTIONS FOR THE B-2 DATA ENTRY PANEL
FULL SCALE FATIGUE TEST
FULL SCALE FATIGUE TEST
GROUND-BASED MIDCOURSE DEFENSE (GMD) BOOSTER SUSTAINMENT CONTRACT (BSC) TASK ORDER 0001
COMMON NETWORK PLANNING SYSTEMS SUSTAINMENT & ENHANCEMENT
JANUS PROJECT
ICE, CLOUD, AND LAND ELEVATION-2 (ICESAT-2) MISSION OPERATIONS CENTER (MOC) SUPPORT CENTER CONTRACT - PROVIDE HIGHLY SPECIALIZED ENGINEERING SERVICES FOR MISSION OPERATIONS SUPPORT TO MEET ICESAT-2 SCIENCE OBJECTIVES.
THE CONTRACTOR WILL PROVIDE THE PRODUCTS AND SERVICES TO SUPPORT THE JAMES WEBB SPACE TELESCOPE PHASE E OPERATIONS AND SUSTAINMENT.
WCS KIT INSTALLATION
WCS KIT INSTALLATION
B1 LOA
THE CONTRACTOR WILL PROVIDE THE PRODUCTS AND SERVICES TO SUPPORT THE JAMES WEBB SPACE TELESCOPE PHASE E OPERATIONS AND SUSTAINMENT.
THE CONTRACTOR WILL PROVIDE THE PRODUCTS AND SERVICES TO SUPPORT THE JAMES WEBB SPACE TELESCOPE PHASE E OPERATIONS AND SUSTAINMENT.
ENGINEERING, LOGISTIC, AND REPAIR SUPPORT FOR AN/ALQ-218 AND AN/ALQ-240 SYSTEMS.
PAM,AIRCRAFT,MATERI
DARPA RESEARCH PROJECT
DARPA RESEARCH PROJECT
PAM,AIRCRAFT,MATERI
PAM,AIRCRAFT,MATERI
PAM,AIRCRAFT,MATERI
UNTETHERED GOAT
LOGISITICS SUPPORT IN SUPPORT OF THE JOINT THREAT EMITTER FOR THE KINGDOM OF SAUDI ARABIA.
B-2 PRESSURIZATION CONTROL VALVE PHASE III, OBSOLESCENCE SOLUTION RESOLUTION TESTING
PGU-28 A/B SEMI-ARMOR PIERCING HIGH EXPLOSIVE INCENDIARY (SAPHEI) BULK PACK (BP) PROCUREMENT ON THE FAMILY BUY 3 IDIQ
PAM,AIRCRAFT,MATERI
CMPC SW DEV
LAY IN MATERIAL
20MM M940 JOINT URGENT OPERATIONAL NEEDS STATEMENT (JUONS) MULTIPURPOSE TRACER-SELF DESTRUCT (MPT-SD) CARTRIDGES, DODIC: AC34, NSN: 1305-01-668-9908.
OPERATION AND MAINTENANCE (O&M) AND DEVELOPMENT, MODERNIZATION AND ENHANCEMENT (DME)SUPPORT FOR THE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT ENTERPRISE TALENT MANAGEMENT SYSTEM
B-2 MISSION PLANNING
MAINTENANCE FOR INTEGRATED BATTLE COMMAND SYSTEM (IBCS), AIR AND MISSILE DEFENSE WORKSTATION (AMDWS) BLOCK VII.
DARPA RESEARCH PROJECT
OPERATION AND MAINTENANCE (O&M) AND DEVELOPMENT, MODERNIZATION AND ENHANCEMENT (DME)SUPPORT FOR THE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT ENTERPRISE TALENT MANAGEMENT SYSTEM
CONGRESSIONAL INTEREST ITEM / MANUFACTURING TECHNOLOGY FOR HYPERSONIC AIRBREATHING CRUISE MISSILE
791 DELAWARE AND 782 MISSISSIPPI SSTG NO. 1 AND NO. 2 MATERIAL
SHIP REPAIR
30MM MK 44 MOD 3 GUNS WITH ASSOCIATED SPARE PARTS AND SPECIAL TOOLING
THIS CONTRACT SUPPORTS THE DISTRIBUTED COMMON GROUND SYSTEM NETWORK WEAPON SYSTEM AND ALL SUPPORTING ACTIVITIES.
PROCUREMENT OF ELECTRONIC WARFARE EQUIPMENT.
UNMANNED UNDERSEA VEHICLE FAMILY OF SYSTEMS SERVICES
ENGINEERING SERVICES TO DEVELOP ADVANCED ALGORITHMS AND SOFTWARE SOLUTIONS TO ADD CAPABILITY AND IMPROVE PERFORMANCE OF THE MICROELECTRONICS-BASED PLANNING SYSTEMS
THIS CONTRACT PROVIDES CONTINUED SERVES FOR THE AIR AND MISSILE DEFENSE PLANNING AND CONTROL SYSTEM - TACTICAL SUPPORT SYSTEM.
FMS VOLCANO PROCUREMENT
THE ADVANCED TECHNOLOGY SUPPORT PROGRAM (ATSP) CONTRACT ACQUIRES PROGRESSIVE MICROELECTRONIC CAPABILITY SOLUTIONS FOR AIRCRAFT.
CONTINUE THE INTEGRATION OF ESTONIA, LATVIA, & LITHUANIA INTO THE NORTH ATLANTIC TREATY ORGANIZATION (NATO) ARCHITECTURE FOR INTEGRATED AIR & MISSILE DEFENSE (IAMD) BY PROVIDING SERVICES TO SUPPORT DEPLOYED FAAD & AMDWS SOFTWARE IN THE BALTIC STATES.
CONTINUE THE INTEGRATION OF ESTONIA, LATVIA, & LITHUANIA INTO THE NORTH ATLANTIC TREATY ORGANIZATION (NATO) ARCHITECTURE FOR INTEGRATED AIR & MISSILE DEFENSE (IAMD) BY PROVIDING SERVICES TO SUPPORT DEPLOYED FAAD & AMDWS SOFTWARE IN THE BALTIC STATES.
NORTHROP GRUMMAN FOR SPOC MFP CSO
THE ADVANCED TECHNOLOGY SUPPORT PROGRAM (ATSP) CONTRACT ACQUIRED PROGRESSIVE CAPABILITY SOLUTIONS TO TEST AND PRODUCE ADVANCED MICROELECTRONIC AND SOFTWARE SOLUTION TO ADD CAPABILITY TO THE MICROELECTRONICS-BASED DIRECTED REQUIREMENT INTEGRATION KITS
INERTIAL MEASURING
INERTIAL MEASUREMENT UNIT
8510455772!DUCT ASSEMBLY,BLEED
8510455772!DUCT ASSEMBLY,BLEED
SSTG MATERIAL
PAM,AIRCRAFT,MATERI
PAM,AIRCRAFT,MATERI
CDS / SPARES HARDWARE/SERVICES/TEST SUPPORT
CDS / SPARES HARDWARE/SERVICES/TEST SUPPORT
DOOR,ACCESS,AIRCRAF
IGF::OT::IGF INTEGRATED DIRECTED ENERGY ENGINEERING&DEVELOPMENT (INDEED)
8511682573!VALVE,FLOW CONTROL
CET 25-565, RAD-BONES
B-2 PRODUCT SUPPORT SERVICES.
8511075257!DUCT ASSEMBLY,BLEED
STABLE: SYSTEMS TECHNOLOGIES FOR ARCHITECTURE BASELINE
8509573742!ENGINEERING
8510511919!VALVE,SOLENOID
COUNTER AIR SCIENCE AND TECHNOLOGY 2
FMS CDS TAIWAN ORDER
FMS CDS TAIWAN ORDER
FMS CDS TAIWAN ORDER
ORGANIZATIONAL MESSAGING SERVICE PRODUCT ENGINEERING SUPPORT AND SOFTWARE FUNCTIONAL CHANGES SUPPORTS ENHANCED COMMUNICATION GATEWAY MESSAGING SYSTEM SOFTWARE CONFIGURATION, OPERATIONS, AND MAINTENANCE.
COMMERCIAL SERVICE FOR THE SW DEVELOPMENT AND SUSTAINMENT OF THE BALLISTIC MISSILE AND ANALYSIS SERVICES PROGRAM (BMAS).
WW98 INITIATING PROPELLANT
F-16 AESA RADAR REPAIR COST SHARE FOR ADDERS
PAM,AIRCRAFT,MATERI
8510511359!VANE ASSY,NOZZLE
PAM,AIRCRAFT,MATERI
PAM,AIRCRAFT,MATERI
PAM,AIRCRAFT,MATERI
PAM,AIRCRAFT,MATERI
PAM,AIRCRAFT,MATERI
COMPUTER,DIGITAL,MI
PAM,AIRCRAFT,MATERI
AFMC
F-35 CONNECTION.
F-35 CONNECTION.
PAM,AIRCRAFT,MATERI
PROCESSOR,GATEWAY
PAM,AIRCRAFT,MATERI
THE CURRENT REQUIREMENT IS FOR A NEW TASK ORDER REQUIRING ENGINEERING AND TECHNICAL SERVICES IN SUPPORT ECDIS SOFTWARE DEVELOPMENT IN SUPPORT OF VARIOUS CRITICAL US NAVY PROGRAMS.
PAM,AIRCRAFT,MATERI
PAM,AIRCRAFT,MATERI
T-38 2025 ENGINEERING SERVICES - FEM
SENSOR,ELECTO-OPTIC
SUPPORT, STRUCTURAL
FAMS IGATE SOFTWARE AND SERVICE
LOW BAND DEDICATED RECEIVER (LBDR) SOFTWARE/FIRMWARE SUPPORT
8510705205!FORMER,AIRCRAFT
T-38 2025 ENGINEERING SERVICES - RM&S
8510701937!VALVE,SOLENOID
HOLDING SLIN FOR CLIN 0001
8509043901!PANEL ASSEMBLY,AUXI
BULLNOSE KEYBOARD,A
CONTROL DISPLAY
AILERON-RUDDERVATOR
PROCESSOR RADAR
POWER CONTROL ASSEM
INTEG PHOTO ASSET
AIRBORNE ELECTRONIC ATTACK (AEA) GROWLER BLOCK 2 (GB2) JAMMER MANAGEMENT EMULATOR (JME) SOFTWARE SUPPORT
CIRCUIT CARD ASSEMB
CIRCUIT CARD ASSEMB
VIDEO PROCESSOR MOD
COMMON MUNITIONS BUILT-IN-TEST REPROGRAMMING EQUIPMENT (CMBRE) CONTRACTOR LOGISTICS SUPPORT (CLS) AND PRODUCTION CONTRACT.
8511758384!ELECTRONIC COMPONEN
MODIFICATION KIT,AI
FA701424C0031 - DAF MPP NORTHROP GRUMMAN & CLICK BOND
8508245921!LEADING EDGE,AIRCRA
8511761350!BEAM,AIRCRAFT
8511762148!BEAM,AIRCRAFT
T-38 2025 ENGINEERING SERVICES - IATP
ADVANCED PROGRAMMABLE SIGNAL PROCESSOR LINE REPLACEABLE UNIT REPAIR
ANTENNA ASSEMBLY
ANTENNA ASSEMBLY
SMART NEXT MAINTENANCE
FAILSAFE CONTROL CC
DRAWER ASSEMBLY,AIR
COMPUTER SUBASSEMBL
SYNTHESIZER,ELECTRI
8511730576!TRANSMITTER,RUDDER
POWER CONTROL ASSEM
HYDRAULIC ACTUATOR,
HYDRAULIC ACTUATOR,
THE OBJECTIVE OF THIS EFFORT IS TO ENHANCE, BUILD UPON, AND MAINTAIN THE ATMOSPHERIC MODELING AND SIMULATION CAPABILITIES DEVELOPED IN PREVIOUS CONTRACT ITERATIONS.
BULLNOSE KEYBOARD,A
PAM
PAM
TO PROVIDE REMOTE OR ONSITE TECHNICAL AND ENGINEERING SERVICES IN SUPPORT OF THE LCS NAVIGATION/INTEGRATED BRIDGE SYSTEM AS DIRECTED BY THE SHIP CONTROLS SURFACE COMBATANTS BRANCH (CODE 522) OF THE NAVAL SURFACE WARFARE CENTER, PHILADELPHIA DIVISION.
NRP,KVM SWITCH,PROG
SP,AIRCRAFT,MATERIA
TIMER,SEQUENTIAL
8510342888!FIREWALL,FUSELAGE
F-16 RADAR REPAIR
CONTROL ASSEMBLY
8511725931!SEMICONDUCTOR DEVIC
DIG VIDEO PROC ASSY
COLLIMATOR HOUSING-
All Awards
200506!000026!5700!FA8214!OO-ALC/PKME/LMKE !F4261098C0001 !A!N! !Y! !P01502!20041213!20050701!001563738!004179453!016435559!N!NORTHROP GRUMMAN SPACE & MISSI!888 S 2000 E !CLEARFIELD !UT!84015!13850!011!49!CLEARFIELD !DAVIS !UTAH !-000001960000!N!N!000000000000!L014!TECH REP SVCS/GUIDED MISSILES !A2 !MISSILE AND SPACE SYSTEMS !302 !MINUTEMAN III GRP !541330!E! !3! ! !C! ! !20200930!B! ! !A! !A!N!L!2!002!B! !Z!Y!Z! ! !N!C!N! ! ! !A!A!A!A!000!A!C!N! ! ! ! ! ! !0001! !
E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7)
E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-2)
FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
IGF::OT::IGF ISS COMMERCIAL RESUPPLY SERVICES 2
IGF::OT::IGF ISS COMMERCIAL RESUPPLY SERVICES 2
MQ-4C TRITON LRIP LOT 5 LONG LEAD ITEMS TO SUPPORT U.S. NAVY AND COOPERATIVE PARTNER AUSTRALIA.
IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS
IRBM TARGETS
F-16 ACTIVE ELECTRONICALLY SCANNED ARRAY JOINT EMERGENT OPERATIONAL NEED
F-16 ACTIVE ELECTRONICALLY SCANNED ARRAY JOINT EMERGENT OPERATIONAL NEED
IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS
GCSS-ARMY (F/T)
SPACE LAUNCH SYSTEM (SLS) BOOSTER PRODUCTION AND OPERATIONS CONTRACT (BPOC)
SPACE LAUNCH SYSTEM (SLS) BOOSTER PRODUCTION AND OPERATIONS CONTRACT (BPOC)
INTEGRATED BATTLE COMMAND SYSTEM (IBCS) HARDWARE LOW RATE INITIAL PRODUCTION/FULL RATE PRODUCTION (LRIP/FRP).
CONTRACTOR IS TO PROVIDE THE EXPERTISE, TECHNICAL KNOWLEDGE, IT SUPPORT PERSONNEL, AND OTHER RELATED RESOURCES NECESSARY FOR SYSTEMS ANALYSIS AND TESTING
E130J ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, FACILITIES, EQUIPMENT, MATERIAL, AND SERVICES NECESSARY TO DESIGN, DEVELOP, MANUFACTURE, INTEGRATE, TEST, AND DELIVER THE HARDWARE, DOCUMENTATION, AND SERVICES SPECIFIED HEREIN. THE CONTRACTOR SHALL ALSO PROVIDE SUPPORT, AS REQUIRED, FOR PRE-DELIVERY MISSION INTEGRATION ACTIVITIES, SUCH AS NPP MISSION OPERATIONS REVIEW AND JPSS DELTA-PDR. DOCUMENTATION AND OTHER TASKS SHOULD BE IN ACCORDANCE WITH THE REQUIREMENTS OF THIS SOW AND THE APPLICABLE DOCUMENTATION REFERENCED IN SECTION 2.3 HEREIN. COMPLIANCE WITH THE REQUIREMENTS STATED HEREIN, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
JOINT POLAR SATELLITE SYSTEM-2 SPACECRAFT. GD-300HP CORE SPACECRAFT INCLUDING ALL ASSOCIATED HARDWARE, SOFTWARE, SOURCE CODE, MAINTENANCE SYSTEM AND DOCUMENTATION FOR THE JPSS-2 SPACECRAFT MISSION.
GWS SOFTWARE DEVELOPMENT (GFC, IDT, GSS,
CONTRACTOR LOGISTICS SUPPORT AND SERVICES (CLS VII) FOR THE RG-4 GLOBAL HAWK PLATFORM.
IGF::OT::IGF GUN MISSION MODULES (GMM)
MISSION COMMAND TRAINING PROGRAM (MCTP)
TYPE 4 SUBSCALE TARGETS
Contract Vehicles
Where NORTHROP GRUMMAN SYSTEMS CORPORATION wins as a prime โ aggregated by the IDIQ contract vehicle each task order flows through.