NORTHROP GRUMMAN SYSTEMS CORPORATION
Federal contractor profile
Intelligence Summary
# Northrop Grumman Systems Corporation - Vendor Assessment
## Agency Concentration Risk
Northrop Grumman exhibits significant concentration risk with the Department of Defense commanding 70% ($52.7B) of total obligated value across 707 awards. This heavy reliance on a single agency creates vulnerability to budget fluctuations, policy shifts, or procurement strategy changes. NASA represents the secondary customer at 24.4% ($18.5B), providing modest diversification. The remaining eight agencies collectively account for only 5.6% ($4.3B), indicating limited portfolio balance.
## Contract Expiry Exposure
The vendor faces substantial near-term renewal pressure with $18.7B in contracts expiring within 18 months, representing 24.7% of total obligated value. This concentration of expiring awards necessitates aggressive rebid and renewal efforts to maintain revenue continuity.
## NAICS Diversification
Despite serving 10 NAICS codes, Northrop Grumman demonstrates narrow service concentration. The top two NAICS categories (541511 and 541512 - likely professional services) account for 411 awards, while aerospace manufacturing (336413) represents 122 awards. This limited diversification within defense-oriented sectors constrains revenue stability outside core competencies.
## Strategic Outlook
Northrop Grumman maintains a defensible but concentrated position. The DoD dependency presents both opportunity and risk. Strategic priorities should include: expanding non-defense agency relationships, accelerating contract renewals ahead of expiration, and diversifying NAICS offerings to reduce sector vulnerability. The NASA relationship provides valuable secondary revenue stability.
Generated May 31, 2026
Top Agencies
| Agency | Awards | Total Obligated |
|---|---|---|
| Department of Defense | 707 | $52.7B |
| National Aeronautics and Space Administration | 26 | $18.5B |
| Department of Health and Human Services | 178 | $2.0B |
| Social Security Administration | 2 | $740.6M |
| Department of Homeland Security | 31 | $589.6M |
| Department of the Treasury | 11 | $379.1M |
| General Services Administration | 16 | $329.3M |
| Department of Justice | 4 | $188.9M |
| Department of Transportation | 8 | $106.3M |
| Department of the Interior | 5 | $52.0M |
Top NAICS Codes
| NAICS Code | Description | Awards |
|---|---|---|
| 541511 | - | 264 |
| 541512 | - | 146 |
| 336413 | OTHER AIRCRAFT PARTS AND AUXILIARY EQUIPMENT MANUFACTURING | 122 |
| 541330 | ENGINEERING SERVICES | 80 |
| 541611 | - | 33 |
| 541715 | RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY) | 33 |
| 334511 | SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING | 25 |
| 541519 | OTHER COMPUTER RELATED SERVICES | 19 |
| 334220 | RADIO AND TELEVISION BROADCASTING AND WIRELESS COMMUNICATIONS EQUIPMENT MANUFACTURING | 17 |
| 541513 | - | 15 |
Expiring Contracts (211)
E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-2)
FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
IRBM TARGETS
INTEGRATED BATTLE COMMAND SYSTEM (IBCS) HARDWARE LOW RATE INITIAL PRODUCTION/FULL RATE PRODUCTION (LRIP/FRP).
GWS SOFTWARE DEVELOPMENT (GFC, IDT, GSS,
IGF::OT::IGF GUN MISSION MODULES (GMM)
TYPE 4 SUBSCALE TARGETS
TYPE 4 SUBSCALE TARGETS
SUSTAINMENT- CONTRACTOR LOGISTICS SUPPORT FOR JAPAN, REPUBLIC OF KOREA (ROK), AND NORTH ATLANTIC TREATY ORGANIZATION (NATO).
P-3 AIRCRAFT MAINTENANCE AND LOGISTIC SUPPORT SERVICES
GMD BOOST VEHICLES
ARRAY AT COMMERCIAL TIMESCALE (ACT) IV
DEFENSE EXPERIMENTATION USING COMMERCIAL SPACE INTERNET CALL 003 MULTI-BAND, MULTI-ORBIT SATELLITE COMMUNICATIONS EXPERIMENTS
GROUND SUBSYSTEM SUPPORT CONTRACT (GSSC) 2.0 - GENERAL SUSTAINMENT TASK ORDER
E-2D AERIAL REFUELING RETROFIT KITS AND INSTALLATION
GREEN WAVE MISSION TASK ORDER
THE PURPOSE OF THIS DELIVERY ORDER IS TO INCORPORATE THE CY25 LAIRCM HARDWARE BASE-BUY DELIVERY ORDER AND RELATED FUNDS OBLIGATION.
THE PURPOSE OF THIS DELIVERY ORDER IS TO INCORPORATE THE CY25 LAIRCM HARDWARE BASE-BUY DELIVERY ORDER AND RELATED FUNDS OBLIGATION.
THIS EFFORT IS FOR WORK PERFORMED DURING PHASE B THROUGH F OF THE TRANSITING EXOPLANET SURVEY SATELLITE (TESS) MISSION. THE SPECIFIC REQUIREMENTS FOR EACH OF THESE PHASES ARE PRESENTED IN INDIVIDUAL SECTIONS BELOW. THE EFFORT ALSO INCLUDES TASKS TO: DESIGN, ANALYZE, VALIDATE, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, TEST, AND DELIVER THE TESS SPACECRAFT; INTEGRATE, TEST, AND OPERATE THE TESS OBSERVATORY; AND DEVELOP, TEST, OPERATE, AND SUSTAIN THE ASSOCIATED MISSION OPERATIONS CENTER (MOC). THE CONTRACTOR IS RESPONSIBLE FOR THE DEVELOPMENT OF THE SPACECRAFT AND CAMERA ACCOMMODATION STRUCTURE, INCLUDING THE SUNSHADE. THE TESS INSTRUMENT, CONSISTING OF THE CAMERA STRUCTURE ASSEMBLY, DATA HANDLING UNIT AND HARNESS, WILL BE PROVIDED AS GOVERNMENT FURNISHED EQUIPMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INTEGRATION ACTIVITIES BETWEEN THE INSTRUMENT AND THE SPACECRAFT WITH INSTRUMENT PERSONNEL SUPPORT. THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, MATERIALS, FACILITIES AND RESOURCES NECESSARY TO CONDUCT THESE ACTIVITIES.
THIS EFFORT IS FOR WORK PERFORMED DURING PHASE B THROUGH F OF THE TRANSITING EXOPLANET SURVEY SATELLITE (TESS) MISSION. THE SPECIFIC REQUIREMENTS FOR EACH OF THESE PHASES ARE PRESENTED IN INDIVIDUAL SECTIONS BELOW. THE EFFORT ALSO INCLUDES TASKS TO: DESIGN, ANALYZE, VALIDATE, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, TEST, AND DELIVER THE TESS SPACECRAFT; INTEGRATE, TEST, AND OPERATE THE TESS OBSERVATORY; AND DEVELOP, TEST, OPERATE, AND SUSTAIN THE ASSOCIATED MISSION OPERATIONS CENTER (MOC). THE CONTRACTOR IS RESPONSIBLE FOR THE DEVELOPMENT OF THE SPACECRAFT AND CAMERA ACCOMMODATION STRUCTURE, INCLUDING THE SUNSHADE. THE TESS INSTRUMENT, CONSISTING OF THE CAMERA STRUCTURE ASSEMBLY, DATA HANDLING UNIT AND HARNESS, WILL BE PROVIDED AS GOVERNMENT FURNISHED EQUIPMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INTEGRATION ACTIVITIES BETWEEN THE INSTRUMENT AND THE SPACECRAFT WITH INSTRUMENT PERSONNEL SUPPORT. THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, MATERIALS, FACILITIES AND RESOURCES NECESSARY TO CONDUCT THESE ACTIVITIES.
JAPAN E-2C/E-2D CY21 ISS & TECH SUPPORT
PROVIDE AIRCRAFT AND GROUND CONTROL STATION (GCS) SPARE PARTS AND PROVIDE ENGINEERING, MAINTENANCE TECHNICIAN, LOGISTICS TECHNICIAN AND PILOT SUPPORT.
SEWIP BLOCK 3 DESIGN AGENT
LITENING CATP TARGETING PODS
LITENING CATP TARGETING PODS
ENGINEERING SERVICES RGS-A TASK ORDER 2
B1 RADAR SUSTAINING ENGINEERING SUPPORT
IGF::CT::IGF SENSOR SUSTAINMENT CONTRACT
THE ADVANCED TECHNOLOGY SUPPORT PROGRAM (ATSP) CONTRACT ACQUIRED PROGRESSIVE MICROELECTRONIC CAPABILITY SOLUTIONS TO IMPROVE PERFORMANCE, IMPROVE RELIABILITY AND MAINTAINABILITY OF THE MICROELECTRONICS-BASED G/ATOR RSP REFRESH SYSTEM
DIGITAL INFRASTRUCTURE CONSORTIUM FOR ADVANCED BATTLE MANAGEMENT SYSTEM
LITENING ADVANCED TARGETING PODS
IGF::OT::IGF NORTHRUP GRUMMAN MISSION SYSTEMS (NGMS)SUPPORT FOR RAPID DEPLOYMENT VOICE SWITCH IIA (RDVS IIA), ENHANCED TERMINAL VOICE SWITCH (ETVS) OR SMALL TOWER VOICE SWITCH (STVS).
OPERATIONS & SUSTAINMENT SUPPORT
ENGINEERING SERVICES RGS-A TASK ORDER 3
LINK 16 UH-1Y/AH-1Z A KITS, B KITS, FTDS AND SPARES
LINK 16 UH-1Y/AH-1Z- B KIT
DARPA RESEARCH PROJECT
THE ADVANCED TECHNOLOGY SUPPORT PROGRAM (ATSP) CONTRACT ACQUIRED PROGRESSIVE MICROELECTRONIC CAPABILITY SOLUTIONS TO ADD CAPABILITY, IMPROVE PERFORMANCE, RELIABILITY, MAINTAINABILITY OF A MICROELECTRONICS-BASED AIRCRAFT SYSTEM
ENGINEERING SERVICES IN SUPPORTS OF TRAINERS CLS SUSTAINMENT
ENGINEERING SERVICES IN SUPPORTS OF TRAINERS CLS SUSTAINMENT
LABOR - TECHNICAL ASSISTANT
COMBAT AIR FORCES DISTRIBUTED MISSION OPERATIONS (CAF DMO) ANNUAL ORDER 2025-2026
COMBAT AIR FORCES DISTRIBUTED MISSION OPERATIONS (CAF DMO) ANNUAL ORDER 2025-2026
MK44 MOD 4, 30MM, GUNS WITH SPARES/SPECIAL TOOLING
705 COMBAT TRAINING SQUADRON, KIRTLAND AFB NM - INFRASTRUCTURE, DEVELOPMENT AND ENGINEERING (IDE) SUPPORT SERVICES. CONTRACTOR MAINTAINS THE 705 CTS INFORMATION TECHNOLOGY REQUIREMENTS FOR THE BATTLESPACE.
PAM,AIRCRAFT,MATERI
DECISION SUPPORT SERVICES (DSS) PURSUANT TO 10 USC 2371B(F)
ENGINEERING/TECHNICAL REPRESENTATIVE SERVICES IN SUPPORT OF GROUND MINUTEMAN AUTOMATIC TEST SYSTEM (GMATS)
JANUS PROJECT
ICE, CLOUD, AND LAND ELEVATION-2 (ICESAT-2) MISSION OPERATIONS CENTER (MOC) SUPPORT CENTER CONTRACT - PROVIDE HIGHLY SPECIALIZED ENGINEERING SERVICES FOR MISSION OPERATIONS SUPPORT TO MEET ICESAT-2 SCIENCE OBJECTIVES.
DECISION SUPPORT SERVICES (DSS) PURSUANT TO 10 USC 2371B(F)
WCS KIT INSTALLATION
B1 LOA
SE- SYSTEM CONFIGURATION SETS - TERM NEW TASK ORDER SEPM 4_NG
THE CONTRACTOR WILL PROVIDE THE PRODUCTS AND SERVICES TO SUPPORT THE JAMES WEBB SPACE TELESCOPE PHASE E OPERATIONS AND SUSTAINMENT.
THE CONTRACTOR WILL PROVIDE THE PRODUCTS AND SERVICES TO SUPPORT THE JAMES WEBB SPACE TELESCOPE PHASE E OPERATIONS AND SUSTAINMENT.
FY22 CDP NRE (DLPU/DON)
XM1198
ENGINEERING, LOGISTIC, AND REPAIR SUPPORT FOR AN/ALQ-218 AND AN/ALQ-240 SYSTEMS.
PAM,AIRCRAFT,MATERI
GROUND SUBSYSTEMS SUPPORT CONTRACT (GSSC) 2.0 - AIRBORNE LAUNCH CONTROL SYSTEM (ALCS) SUSTAINMENT
GROUND SUBSYSTEMS SUPPORT CONTRACT (GSSC) 2.0 - AIRBORNE LAUNCH CONTROL SYSTEM (ALCS) SUSTAINMENT
PAM,AIRCRAFT,MATERI
PAM,AIRCRAFT,MATERI
JITTC-N FY 25/25 OY TASK ORDER
JITTC-N FY 25/25 OY TASK ORDER
PAM,AIRCRAFT,MATERI
SUSTAINMENT ENGINEERING MAINTENANCE SURVEY AND INSTALL IONOSPHERIC GROUND SENSORS
LOGISITICS SUPPORT IN SUPPORT OF THE JOINT THREAT EMITTER FOR THE KINGDOM OF SAUDI ARABIA.
B-2 PRESSURIZATION CONTROL VALVE PHASE III, OBSOLESCENCE SOLUTION RESOLUTION TESTING
PAM,AIRCRAFT,MATERI
CMPC SW DEV
LAY IN MATERIAL
20MM M940 JOINT URGENT OPERATIONAL NEEDS STATEMENT (JUONS) MULTIPURPOSE TRACER-SELF DESTRUCT (MPT-SD) CARTRIDGES, DODIC: AC34, NSN: 1305-01-668-9908.
ADDING FUNDING FOR OPTION YEAR FOUR FOR ETVS-STVS REPAIR CONTRACT 6973GH-20-D-00051. PERIOD OF PERFORMANCE:07/08/2024 TO 07/07/2025.
B-2 MISSION PLANNING
LONG TERM DISPLAY - CDR-TRR
LONG TERM DISPLAY - CDR-TRR
OPERATION AND MAINTENANCE (O&M) AND DEVELOPMENT, MODERNIZATION AND ENHANCEMENT (DME)SUPPORT FOR THE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT ENTERPRISE TALENT MANAGEMENT SYSTEM
DARPA RESEARCH PROJECT
OPERATION AND MAINTENANCE (O&M) AND DEVELOPMENT, MODERNIZATION AND ENHANCEMENT (DME)SUPPORT FOR THE DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT ENTERPRISE TALENT MANAGEMENT SYSTEM
F15SPECIALIZED ENGINEERING AND TECHNICAL SERVICES AND MAINTENANCE TESTABILITY ANALYSIS PROGRAM. DUE TO FPDS SYSTEM CONSTRAINTS, THE PRINCIPAL NAICS IS LISTED INCORRECTLY AS 541611.THE NAICS ASSOCIATED WITH THE TASK ORDER SHOULD BE LISTED AS 541330.
F15SPECIALIZED ENGINEERING AND TECHNICAL SERVICES AND MAINTENANCE TESTABILITY ANALYSIS PROGRAM. DUE TO FPDS SYSTEM CONSTRAINTS, THE PRINCIPAL NAICS IS LISTED INCORRECTLY AS 541611.THE NAICS ASSOCIATED WITH THE TASK ORDER SHOULD BE LISTED AS 541330.
CONGRESSIONAL INTEREST ITEM / MANUFACTURING TECHNOLOGY FOR HYPERSONIC AIRBREATHING CRUISE MISSILE
SHIP REPAIR
SHIP REPAIR
30MM MK 44 MOD 3 GUNS WITH ASSOCIATED SPARE PARTS AND SPECIAL TOOLING
DARPA RESEARCH PROGRAM
DEVELOPMENT AND TESTING OF LSPR 1.6.5 SOFTWARE FOR MULTIPLE FMS COUNTRIES
ENGINEERING SERVICES TO DEVELOP ADVANCED ALGORITHMS AND SOFTWARE SOLUTIONS TO ADD CAPABILITY AND IMPROVE PERFORMANCE OF THE MICROELECTRONICS-BASED PLANNING SYSTEMS
FMS VOLCANO PROCUREMENT
30MM GUNS AND ASSOCIATED SPARE PARTS/TOOLING
THE ADVANCED TECHNOLOGY SUPPORT PROGRAM (ATSP) CONTRACT ACQUIRES PROGRESSIVE MICROELECTRONIC CAPABILITY SOLUTIONS FOR AIRCRAFT.
RESEARCH AND DEVELOPMENT
TSOA DEVELOPMENT
ULTRA-WIDE BANDGAP SEMICONDUCTORS (UWBGS)
CONTINUE THE INTEGRATION OF ESTONIA, LATVIA, & LITHUANIA INTO THE NORTH ATLANTIC TREATY ORGANIZATION (NATO) ARCHITECTURE FOR INTEGRATED AIR & MISSILE DEFENSE (IAMD) BY PROVIDING SERVICES TO SUPPORT DEPLOYED FAAD & AMDWS SOFTWARE IN THE BALTIC STATES.
NORTHROP GRUMMAN FOR SPOC MFP CSO
THE ADVANCED TECHNOLOGY SUPPORT PROGRAM (ATSP) CONTRACT ACQUIRED PROGRESSIVE CAPABILITY SOLUTIONS TO TEST AND PRODUCE ADVANCED MICROELECTRONIC AND SOFTWARE SOLUTION TO ADD CAPABILITY TO THE MICROELECTRONICS-BASED DIRECTED REQUIREMENT INTEGRATION KITS
COMBAT AIR FORCES DISTRIBUTED MISSION OPERATIONS (CAF DMO) OTHER EXERCISE SUPPORT (OES) AND CROSS DOMAIN SOLUTION (CDS) ORDER 2025-2026
INERTIAL MEASURING
INERTIAL MEASUREMENT UNIT
SSTG MATERIAL
PAM,AIRCRAFT,MATERI
PAM,AIRCRAFT,MATERI
CDS / SPARES HARDWARE/SERVICES/TEST SUPPORT
CDS / SPARES HARDWARE/SERVICES/TEST SUPPORT
PID: N61340-24-RFPREQ-136100G-0004
SOFTWARE MAINTENANCE SUPPORT AND SOFTWARE TECHNICAL AND DEVELOPMENT SUPPORT
8511682573!VALVE,FLOW CONTROL
CET 25-565, RAD-BONES
8511075257!DUCT ASSEMBLY,BLEED
ADMINISTRATION OF CONTINUED PERFORMANCE DUE TO TRANSFER FROM GENERAL SERVICES ADMINISTRATION TO UNITED STATES SPACE FORCE. ALL FUTURE WORK WILL BE DONE UNDER FA8815-25-F-B002
8509573742!ENGINEERING
8510511919!VALVE,SOLENOID
COUNTER AIR SCIENCE AND TECHNOLOGY 2
FMS CDS TAIWAN ORDER
FMS CDS TAIWAN ORDER
FMS CDS TAIWAN ORDER
ORION AGING AND SURVEILLANCE
F-16 AESA RADAR REPAIR COST SHARE FOR ADDERS
REPAIRS, SPARES REPAIRS, SPARES-- AND ENGINEERING SERVICES OF VARIOUS PLATFORMS AND ENGINEERING SERVICES OF VARIOUS PLATFORMS AND SYSTEMS.
PAM,AIRCRAFT,MATERI
8510511359!VANE ASSY,NOZZLE
PAM,AIRCRAFT,MATERI
423RD SUPPLY CHAIN MANAGEMENT SQUADRON (SCMS) TECHNICAL ORDER (TO) UPDATE ENGINEERING ASSIGNMENT (EA)
PAM,AIRCRAFT,MATERI
PAM,AIRCRAFT,MATERI
PAM,AIRCRAFT,MATERI
PAM,AIRCRAFT,MATERI
COMPUTER,DIGITAL,MI
PAM,AIRCRAFT,MATERI
F-35 CONNECTION.
F-35 CONNECTION.
PAM,AIRCRAFT,MATERI
PROCESSOR,GATEWAY
8507737664!REPAIR KIT,LONGERON
PAM,AIRCRAFT,MATERI
PAM,AIRCRAFT,MATERI
PAM,AIRCRAFT,MATERI
T-38 2025 ENGINEERING SERVICES - FEM
SENSOR,ELECTO-OPTIC
SUPPORT, STRUCTURAL
LOW BAND DEDICATED RECEIVER (LBDR) SOFTWARE/FIRMWARE SUPPORT
AIRBORNE ELECTRONIC ATTACK (AEA) ENGINEERING SERVICES JOINT ELECTRONIC ATTACK AND COMPATIBILITY OFFICE (JEACO)
COMBAT AIR FORCES DISTRIBUTED MISSION OPERATIONS 3.0 2025 NEW SITE WORK
8510705205!FORMER,AIRCRAFT
T-38 2025 ENGINEERING SERVICES - RM&S
8510701937!VALVE,SOLENOID
8509043901!PANEL ASSEMBLY,AUXI
MICROBENET IT SUPPORT
BULLNOSE KEYBOARD,A
CONTROL DISPLAY
AILERON-RUDDERVATOR
PROCESSOR RADAR
POWER CONTROL ASSEM
INTEG PHOTO ASSET
AIRBORNE ELECTRONIC ATTACK (AEA) GROWLER BLOCK 2 (GB2) JAMMER MANAGEMENT EMULATOR (JME) SOFTWARE SUPPORT
PDM A080
CIRCUIT CARD ASSEMB
CIRCUIT CARD ASSEMB
COMBAT AIR FORCES DISTRIBUTED MISSION OPERATIONS 3.0 CHAT SERVER FUNCTIONALITY
VIDEO PROCESSOR MOD
COMMON MUNITIONS BUILT-IN-TEST REPROGRAMMING EQUIPMENT (CMBRE) CONTRACTOR LOGISTICS SUPPORT (CLS) AND PRODUCTION CONTRACT.
8511758384!ELECTRONIC COMPONEN
MODIFICATION KIT,AI
ADAPTIVE MAINTENANCE SUPPORT SERVICES ON A TIME AND MATERIALS BASIS FOR THE VEGA ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM SOFTWARE.
FA701424C0031 - DAF MPP NORTHROP GRUMMAN & CLICK BOND
8508245921!LEADING EDGE,AIRCRA
FAMS IGATE SOFTWARE AND SERVICE
T-38 2025 ENGINEERING SERVICES - IATP
ADVANCED PROGRAMMABLE SIGNAL PROCESSOR LINE REPLACEABLE UNIT REPAIR
HOLDING SLIN IN SUPPORT OF CLIN 0001
ANTENNA ASSEMBLY
ANTENNA ASSEMBLY
SMART NEXT MAINTENANCE
FAILSAFE CONTROL CC
DRAWER ASSEMBLY,AIR
COMPUTER SUBASSEMBL
SYNTHESIZER,ELECTRI
8511730576!TRANSMITTER,RUDDER
POWER CONTROL ASSEM
POWER CONTROL ASSEM
HYDRAULIC ACTUATOR,
HYDRAULIC ACTUATOR,
EAF SYNTHESIZER,ELECTRI
MJU-62 AND MJU-73 NSNS: 1377-01-658-5870 AND 1377-01-645-7400
THE OBJECTIVE OF THIS EFFORT IS TO ENHANCE, BUILD UPON, AND MAINTAIN THE ATMOSPHERIC MODELING AND SIMULATION CAPABILITIES DEVELOPED IN PREVIOUS CONTRACT ITERATIONS.
BULLNOSE KEYBOARD,A
ENGINEERING AND TECHNICAL SERVICES
PAM
PAM
ANTENNA ASSEMBLY
INERTIAL NAVIGATION
NRP,KVM SWITCH,PROG
SP,AIRCRAFT,MATERIA
TIMER,SEQUENTIAL
8510342888!FIREWALL,FUSELAGE
F-16 RADAR REPAIR
SUPPORT FOR REMOTE AND ONSITE TECHNICAL AND ENGINEERING SERVICES IN SUPPORT OF THE LHD 1- AND LHA 6-CLASS VOYAGE DATA RECORDER (VDR) INSTALLATION AND PRODUCT IMPROVEMENT.
SUPPORT FOR REMOTE AND ONSITE TECHNICAL AND ENGINEERING SERVICES IN SUPPORT OF THE LHD 1- AND LHA 6-CLASS VOYAGE DATA RECORDER (VDR) INSTALLATION AND PRODUCT IMPROVEMENT.
8511725931!SEMICONDUCTOR DEVIC
DIG VIDEO PROC ASSY
COLLIMATOR HOUSING-
THE LHD 1 ANALOG HELM WHEEL ASSEMBLY IS OBSOLETE. THE PURPOSE OF THIS EFFORT IS FOR NORTHROP GRUMMAN MISSION SYSTEMS (NGMS), REPLACE KNOWN DIMINISHING MANUFACTURING SOURCE (DMS) COMPONENTS ON THE HELM WHEEL ASSEMBLY.
TO# 19AQMM23P0570 FOR I-GATE SOFTWARE MAINTENANCE SUPPORT BY NORTHROP GRUMMAN POC: KENNETH PARKER, PARKERK@STATE.GOV JOHN PILLART, PILLARTJD@STATE.GOV
DISPLAY UNIT,FLIGHT
MODIFICATION KIT,AI
SELECTOR,ANTENNA
JOINT THREAT EMITTER FOR THE KINGDOM OF SAUDI ARABIA.
FULL MATRIX TEST ON THE SR-129 ROCKET MOTOR
All Awards
200506!000026!5700!FA8214!OO-ALC/PKME/LMKE !F4261098C0001 !A!N! !Y! !P01502!20041213!20050701!001563738!004179453!016435559!N!NORTHROP GRUMMAN SPACE & MISSI!888 S 2000 E !CLEARFIELD !UT!84015!13850!011!49!CLEARFIELD !DAVIS !UTAH !-000001960000!N!N!000000000000!L014!TECH REP SVCS/GUIDED MISSILES !A2 !MISSILE AND SPACE SYSTEMS !302 !MINUTEMAN III GRP !541330!E! !3! ! !C! ! !20200930!B! ! !A! !A!N!L!2!002!B! !Z!Y!Z! ! !N!C!N! ! ! !A!A!A!A!000!A!C!N! ! ! ! ! ! !0001! !
E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7)
E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-2)
FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
IGF::OT::IGF ISS COMMERCIAL RESUPPLY SERVICES 2
IGF::OT::IGF ISS COMMERCIAL RESUPPLY SERVICES 2
MQ-4C TRITON LRIP LOT 5 LONG LEAD ITEMS TO SUPPORT U.S. NAVY AND COOPERATIVE PARTNER AUSTRALIA.
IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS
IRBM TARGETS
F-16 ACTIVE ELECTRONICALLY SCANNED ARRAY JOINT EMERGENT OPERATIONAL NEED
F-16 ACTIVE ELECTRONICALLY SCANNED ARRAY JOINT EMERGENT OPERATIONAL NEED
IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS
GCSS-ARMY (F/T)
SPACE LAUNCH SYSTEM (SLS) BOOSTER PRODUCTION AND OPERATIONS CONTRACT (BPOC)
SPACE LAUNCH SYSTEM (SLS) BOOSTER PRODUCTION AND OPERATIONS CONTRACT (BPOC)
INTEGRATED BATTLE COMMAND SYSTEM (IBCS) HARDWARE LOW RATE INITIAL PRODUCTION/FULL RATE PRODUCTION (LRIP/FRP).
CONTRACTOR IS TO PROVIDE THE EXPERTISE, TECHNICAL KNOWLEDGE, IT SUPPORT PERSONNEL, AND OTHER RELATED RESOURCES NECESSARY FOR SYSTEMS ANALYSIS AND TESTING
E130J ENGINEERING AND MANUFACTURING DEVELOPMENT (EMD)
THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, FACILITIES, EQUIPMENT, MATERIAL, AND SERVICES NECESSARY TO DESIGN, DEVELOP, MANUFACTURE, INTEGRATE, TEST, AND DELIVER THE HARDWARE, DOCUMENTATION, AND SERVICES SPECIFIED HEREIN. THE CONTRACTOR SHALL ALSO PROVIDE SUPPORT, AS REQUIRED, FOR PRE-DELIVERY MISSION INTEGRATION ACTIVITIES, SUCH AS NPP MISSION OPERATIONS REVIEW AND JPSS DELTA-PDR. DOCUMENTATION AND OTHER TASKS SHOULD BE IN ACCORDANCE WITH THE REQUIREMENTS OF THIS SOW AND THE APPLICABLE DOCUMENTATION REFERENCED IN SECTION 2.3 HEREIN. COMPLIANCE WITH THE REQUIREMENTS STATED HEREIN, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
JOINT POLAR SATELLITE SYSTEM-2 SPACECRAFT. GD-300HP CORE SPACECRAFT INCLUDING ALL ASSOCIATED HARDWARE, SOFTWARE, SOURCE CODE, MAINTENANCE SYSTEM AND DOCUMENTATION FOR THE JPSS-2 SPACECRAFT MISSION.
GWS SOFTWARE DEVELOPMENT (GFC, IDT, GSS,
CONTRACTOR LOGISTICS SUPPORT AND SERVICES (CLS VII) FOR THE RG-4 GLOBAL HAWK PLATFORM.
IGF::OT::IGF GUN MISSION MODULES (GMM)
MISSION COMMAND TRAINING PROGRAM (MCTP)
MISSION COMMAND TRAINING PROGRAM (MCTP)
Contract Vehicles
Where NORTHROP GRUMMAN SYSTEMS CORPORATION wins as a prime โ aggregated by the IDIQ contract vehicle each task order flows through.