CORE CONSOLIDATED LLC - HONOLULU COMBINED ATC MEMBRANE ROOF REPLACEMENT.
Key Details
Description
HONOLULU COMBINED ATC MEMBRANE ROOF REPLACEMENT.
Context & Analysis
On Feb 23, 2026, Department of Transportation obligated $3,338,693.33 to CORE CONSOLIDATED LLC for honolulu combined atc membrane roof replacement.. The award is classified under NAICS 238160 — ROOFING CONTRACTORS and issued as a firm fixed price contract. Competition extent: competed under sap with 5 offers received. The procurement used a NO SET ASIDE USED. set-aside. Performance is located in HONOLULU, HI. This award is one of several similar procurements from Department of Transportation under NAICS 238160 — related awards are listed below.
Contractor Information
Similar Awards
THE PROVIDENCE (PVD) AIRPORT TRAFFIC CONTROL TOWER (ATCT) HAS A PROJECT JCN 1800508 FOR A TOTAL ROOF REPLACEMENT OF ATCT BUILDINGS (TOWER CAB, BASE-BUILDING, TECH-OPS, TELCO AND E&G) AND RE-CAULKING OF ATCT BUILDINGS (TOWER, BASE-BUILDING, TECH-O
EMMATY INC
$1.3M
THE PROVIDENCE (PVD) AIRPORT TRAFFIC CONTROL TOWER (ATCT) HAS A PROJECT JCN 1800508 FOR A TOTAL ROOF REPLACEMENT OF ATCT BUILDINGS (TOWER CAB, BASE-BUILDING, TECH-OPS, TELCO AND E&G) AND RE-CAULKING OF ATCT BUILDINGS (TOWER, BASE-BUILDING, TECH-O
EMMATY INC
$1.3M
THE PROVIDENCE (PVD) AIRPORT TRAFFIC CONTROL TOWER (ATCT) HAS A PROJECT JCN 1800508 FOR A TOTAL ROOF REPLACEMENT OF ATCT BUILDINGS (TOWER CAB, BASE-BUILDING, TECH-OPS, TELCO AND E&G) AND RE-CAULKING OF ATCT BUILDINGS (TOWER, BASE-BUILDING, TECH-O
EMMATY INC
$1.3M
ROOF REPLACEMENT AT ADW ATCT AND ORF ATCT
MORE CONSULTING CORP
$1.3M
ROOF REPLACEMENT AT THE OAKLAND AIR ROUTE TRAFFIC CONTROL CENTER IN FREMONT, CA.
ZNTH, INC.
$1.0M
Stay Updated
Get notified about new opportunities matching your interests.