This contract expires in 32 days (May 19, 2026).
FRONTLINE KING GEORGE JV LLC - THE CONTRACTOR SHALL PROVIDE ALL DESIGN, LABOR, TOOLS, EQUIPMENT, AND MATERIALS TO PREPARE THE SITES FOR OFFSET, FOIL, AND SCREEN PRESSES FOR THE THE WESTERN CURRENCY FACILITY (WCF) IN FORT WORTH, TX.
Key Details
Description
THE CONTRACTOR SHALL PROVIDE ALL DESIGN, LABOR, TOOLS, EQUIPMENT, AND MATERIALS TO PREPARE THE SITES FOR OFFSET, FOIL, AND SCREEN PRESSES FOR THE THE WESTERN CURRENCY FACILITY (WCF) IN FORT WORTH, TX.
Contractor Information
Similar Awards
PROVIDE ALL EXPERTISE, LABOR, TOOLS, MATERIALS, EQUIPMENT, AND SUPERVISION NECESSARY TO REPLACE EXISTING AIR HANDLERS (AHU) THROUGHOUT THE FACILITY.
FRONTLINE KING GEORGE JV LLC
$4.9M
MT COOLING TOWERS
CONSTRUCTURE INC
$4.0M
DESIGN AND CONSTRUCT A PALLET RACKING SYSTEM.
VALCORP ENTERPRISES LLC
$3.1M
INTAGLIO PRESS 14 AND 24 SITE PREPARATION.
CCS KING GEORGE 3 LLC
$2.9M
THIS PROJECT IS TO REPLACE THE OLD EXISTING POWER DISTRIBUTION UNITS PDUS AND REMOVE UNNEEDED CABLE-WHIPS INSTALL NEW PDUS AND RPPS COMPLETE WITH SEISMIC STANDS AND ASSOCIATED RAISED FLOOR SYSTEM MODIFICATIONS AND GROUNDING INSTALL NECESSARY UNDER-FL
H2 CONSTRUCTION INC
$2.5M