This contract expires in 290 days (Jun 30, 2027).

Browse related active opportunities

NO SET ASIDE USED.

HORIBA INSTRUMENTS INCORPORATED - UPGRADE OF EXISTING S5-HT TEST STATION

PIID: 80GRC026C0015
Signed Date: Sep 4, 2026Effective Date: Sep 4, 2026End Date: Closes in 290 days
Award $
$672K
Vendor
HORIBA INSTRUMENTS INCORPORATED
NAICS
541330
Signed Date
Sep 4, 2026

Key Details

Dollars Obligated
$672,034
Base & All Options
$672,034
Awarding Sub-Agency
National Aeronautics and Space Administration
Product Service Code
K066 - MODIFICATION OF EQUIPMENT- INSTRUMENTS AND LABORATORY EQUIPMENT
Extent Competed
NOT COMPETED
Number of Offers
1
Place of Performance
ANN ARBOR, MI

Description

UPGRADE OF EXISTING S5-HT TEST STATION

Context & Analysis

On Sep 4, 2026, National Aeronautics and Space Administration obligated $672,034 to HORIBA INSTRUMENTS INCORPORATED for upgrade of existing s5-ht test station. The award is classified under NAICS 541330 — ENGINEERING SERVICES. Competition extent: not competed with 1 offer received. The procurement used a NO SET ASIDE USED. set-aside. Performance is located in ANN ARBOR, MI. The contract is scheduled through Jun 30, 2027 — approximately 10 months remaining. This award is one of several similar procurements from National Aeronautics and Space Administration under NAICS 541330 — related awards are listed below.

Contractor Information

UEI: ZMQHH8JJJUK8
Location: ANN ARBOR, MI

Similar Awards

TAS::80 0122::TAS DEVELOPMENT, MANUFACTURING AND SUPPORT TO WEATHER OBSERVING INSTRUMENT

L3HARRIS TECHNOLOGIES, INC.

$1.0B

GROUND SYSTEMS AND MISSION OPERATIONS (GSMO-3)

KBR WYLE SERVICES, LLC

$661.9M

GROUND SYSTEMS AND MISSION OPERATIONS (GSMO-3)

KBR WYLE SERVICES, LLC

$547.8M

IGF::OT::IGF GROUND SYSTEMS AND MISSION OPERATIONS 2 (GSMO-2). THE PURPOSE OF THIS PROCUREMENT IS TO ACQUIRE ENGINEERING SERVICES FOR GROUND SYSTEMS AND MISSION OPERATIONS SUPPORT TO MORE THAN 20 MISSIONS IN PHASES OF THE LIFECYCLE FROM PRE-PHASE A TO PHASE E. THE SCOPE ENCOMPASSES CONCEPT STUDIES, DEVELOPMENT (DEFINITION AND IMPLEMENTATION), INTEGRATION, TEST, VERIFICATION, OPERATIONS, SUSTAINMENT OF MISSION OPERATIONS SYSTEMS, SUBSYSTEMS, AND OPERATIONS PROCESSES AND PROCEDURES. SERVICES INVOLVE SYSTEMS ENGINEERING, FACILITY ENGINEERING, LAUNCH AND EARLY ORBIT SUPPORT, FLIGHT OPERATIONS, FLIGHT DYNAMICS SUPPORT, AND SUSTAINING ENGINEERING.

KBR WYLE SERVICES, LLC

$506.6M

TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS

LOCKHEED MARTIN CORPORATION

$486.6M

Stay Updated

Get notified about new opportunities matching your interests.

Related