This contract expires in 280 days (Jan 22, 2027).

Browse related active opportunities

FIRM FIXED PRICENO SET ASIDE USED.

HORIBA INSTRUMENTS INCORPORATED - HORIBA FUELCON UPGRADE FOR METHANE/OXYGEN SOFC TEST CAPABILITY

PIID: 80NSSC26P0169Solicitation ID: 80NSSC26909571Q
Signed Date: Jan 22, 2026Effective Date: Jan 22, 2026End Date: Closes in 280 days

Key Details

Dollars Obligated
$349,481
Base & All Options
$349,481
Awarding Sub-Agency
National Aeronautics and Space Administration
Product Service Code
K066 - MODIFICATION OF EQUIPMENT- INSTRUMENTS AND LABORATORY EQUIPMENT
Extent Competed
NOT COMPETED UNDER SAP
Number of Offers
1
Place of Performance
ANN ARBOR, MI, 481087941, CD-MI-06

Description

HORIBA FUELCON UPGRADE FOR METHANE/OXYGEN SOFC TEST CAPABILITY

Contractor Information

UEI: ZMQHH8JJJUK8
CAGE Code: 3FPR3
Location: ANN ARBOR, MI

Similar Awards

TAS::80 0122::TAS DEVELOPMENT, MANUFACTURING AND SUPPORT TO WEATHER OBSERVING INSTRUMENT

L3HARRIS TECHNOLOGIES, INC.

$1.0B

GROUND SYSTEMS AND MISSION OPERATIONS (GSMO-3)

KBR WYLE SERVICES, LLC

$547.8M

IGF::OT::IGF GROUND SYSTEMS AND MISSION OPERATIONS 2 (GSMO-2). THE PURPOSE OF THIS PROCUREMENT IS TO ACQUIRE ENGINEERING SERVICES FOR GROUND SYSTEMS AND MISSION OPERATIONS SUPPORT TO MORE THAN 20 MISSIONS IN PHASES OF THE LIFECYCLE FROM PRE-PHASE A TO PHASE E. THE SCOPE ENCOMPASSES CONCEPT STUDIES, DEVELOPMENT (DEFINITION AND IMPLEMENTATION), INTEGRATION, TEST, VERIFICATION, OPERATIONS, SUSTAINMENT OF MISSION OPERATIONS SYSTEMS, SUBSYSTEMS, AND OPERATIONS PROCESSES AND PROCEDURES. SERVICES INVOLVE SYSTEMS ENGINEERING, FACILITY ENGINEERING, LAUNCH AND EARLY ORBIT SUPPORT, FLIGHT OPERATIONS, FLIGHT DYNAMICS SUPPORT, AND SUSTAINING ENGINEERING.

KBR WYLE SERVICES, LLC

$506.6M

TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS

LOCKHEED MARTIN CORPORATION

$486.1M

IGF::OT::IGF EXPENDABLE LAUNCH VEHICLE INTEGRATED SUPPORT 3 (ELVIS 3)

AI SOLUTIONS INC

$372.2M

Stay Updated

Get notified about new opportunities matching your interests.

Related