This contract expires in 85 days (Aug 30, 2026).
HUNTINGTON INGALLS INCORPORATED - DETAIL DESIGN AND CONSTRUCTION (DD&C) FOR LHA 8 (INITIAL EFFORT LIMITED TO PLANNING, ADVANCED ENGINEERING AND PROCUREMENT OF LONG LEAD TIME MATERIAL)
Key Details
Description
DETAIL DESIGN AND CONSTRUCTION (DD&C) FOR LHA 8 (INITIAL EFFORT LIMITED TO PLANNING, ADVANCED ENGINEERING AND PROCUREMENT OF LONG LEAD TIME MATERIAL)
Context & Analysis
On Nov 12, 2025, Department of Defense obligated $3,314,417,897.4 to HUNTINGTON INGALLS INCORPORATED for detail design and construction (dd&c) for lha 8 (initial effort limited to planning, advanced engineering and procurement of long lead time material). The award is classified under NAICS 336611 — SHIP BUILDING AND REPAIRING and issued as a fixed price incentive contract. Competition extent: full and open competition after exclusion of sources with 2 offers received. The procurement used a NO SET ASIDE USED. set-aside. Performance is located in PASCAGOULA, MS. The contract is scheduled through Aug 30, 2026 — approximately 3 months remaining. This award is one of several similar procurements from Department of Defense under NAICS 336611 — related awards are listed below.
Contractor Information
Similar Awards
SSN 802 AND 803 LONG LEAD TIME MATERIAL
ELECTRIC BOAT CORPORATION
$34.7B
SSN 802 AND 803 LONG LEAD TIME MATERIAL
ELECTRIC BOAT CORPORATION
$34.7B
SSN 802 AND 803 LONG LEAD TIME MATERIAL
ELECTRIC BOAT CORPORATION
$34.7B
SSN 792 LONG LEAD TIME MATERIAL
ELECTRIC BOAT CORPORATION
$19.9B
SSN 792 LONG LEAD TIME MATERIAL
ELECTRIC BOAT CORPORATION
$19.9B