This contract expires in 337 days (Sep 20, 2027).
HYDRA ENGINEERING & CONSTRUCTION, LLC - THIS IS A DESIGN BUILD CONTRACT FOR TRAIL BRIDGES ACROSS THE SAM HOUSTON NATIONAL FOREST. 1.1 THIS PROJECT INCLUDES ALL LABOR, MATERIALS, EQUIPMENT, SUPPLIES, TRAVEL, SUPERVISION, AND INCIDENTALS NECESSARY FOR THE FULL DESIGN AND CONSTRUCTION OF (18
Key Details
Description
THIS IS A DESIGN BUILD CONTRACT FOR TRAIL BRIDGES ACROSS THE SAM HOUSTON NATIONAL FOREST. 1.1 THIS PROJECT INCLUDES ALL LABOR, MATERIALS, EQUIPMENT, SUPPLIES, TRAVEL, SUPERVISION, AND INCIDENTALS NECESSARY FOR THE FULL DESIGN AND CONSTRUCTION OF (18
Context & Analysis
On Aug 8, 2026, Department of Agriculture obligated $3,680,000 to HYDRA ENGINEERING & CONSTRUCTION, LLC for this is a design build contract for trail bridges across the sam houston national forest. 1.1 this project includes all labor, materials, equipment, supplies, travel, supervision, and incidentals nece…. The award is classified under NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Competition extent: full and open competition after exclusion of sources with 8 offers received. The procurement used a SMALL BUSINESS SET ASIDE - TOTAL set-aside. Performance is located in LUFKIN, TX. The contract is scheduled through Sep 20, 2027 — approximately 11 months remaining. This award is one of several similar procurements from Department of Agriculture under NAICS 237310 — related awards are listed below.
Contractor Information
Similar Awards
MORATORIUM EXCEPTION" BLI DDVAK725 HURRICANE HELENE VCT DISASTER RECON DESIGN-BUILD HURRICANE HELENE IN VA
KIEWIT INFRASTRUCTURE SOUTH CO
$260.6M
MORATORIUM EXCEPTION" BLI DDVAK725 HURRICANE HELENE VCT DISASTER RECON DESIGN-BUILD HURRICANE HELENE IN VA
KIEWIT INFRASTRUCTURE SOUTH CO
$241.8M
THE GILA NATIONAL FOREST HAS A REQUIREMENT FOR THE REHABILITATION AND MAINTENANCE OF NATIONAL FOREST SYSTEM ROAD (NFSR) 141 FROM MILEPOST 0.69 TO MILEPOST 18.81. WORK INCLUDES BUT IS NOT LIMITED TO PULVERIZING THE ENTIRE EXISTING CHIP SEAL SURFACE T
SURFACE CONTRACTING, INC
$13.3M
THIS PROJECT IS FOR ROAD REPAIR CONSTRUCTION SERVICES ON THE MONONGAHELA NATIONAL FOREST, FOREST ROAD 86. WORK INCLUDES BUT IS NOT LIMITED TO BASE FAILURE REPAIR, PAVEMENT FAILURE REPAIR, AND RESURFACING.
GAVER INDUSTRIES, INC.
$8.2M
UNAKA ROAD REPAIRS FROM HURRICANE HELENE. REPLACEMENT OR REPAIR OF 22 MILES OF ROAD.
WILLIAMS CONSTRUCTION & CABINETRY, INC.
$7.5M
Stay Updated
Get notified about new opportunities matching your interests.