J G M PROPERTY GROUP, INC. - DESIGN AND INSTALLATION OF A NEW WET AND DRY FIRE SUPPRESSION SYSTEM THROUGHOUT THE EDGAR ALLAN POE NHS COMPLEX (THREE INTERCONNECTED BUILDINGS) AS REQUIRED BY NFPA 13 AND DESIGN A NEW FIRE DETECTION SYSTEM TO MEET NATIONAL FIRE PROTECTION ASSOCIATIO
Key Details
Description
DESIGN AND INSTALLATION OF A NEW WET AND DRY FIRE SUPPRESSION SYSTEM THROUGHOUT THE EDGAR ALLAN POE NHS COMPLEX (THREE INTERCONNECTED BUILDINGS) AS REQUIRED BY NFPA 13 AND DESIGN A NEW FIRE DETECTION SYSTEM TO MEET NATIONAL FIRE PROTECTION ASSOCIATIO
Context & Analysis
On Jan 29, 2026, Department of the Interior obligated $727,759.05 to J G M PROPERTY GROUP, INC. for design and installation of a new wet and dry fire suppression system throughout the edgar allan poe nhs complex (three interconnected buildings) as required by nfpa 13 and design a new fire detection …. The award is classified under NAICS 236220 — COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION and issued as a firm fixed price contract. Competition extent: full and open competition after exclusion of sources with 2 offers received. The procurement used a WOMEN OWNED SMALL BUSINESS set-aside. Performance is located in PHILADELPHIA, PA. This award is one of several similar procurements from Department of the Interior under NAICS 236220 — related awards are listed below.
Contractor Information
Similar Awards
MANY FARMS HIGH SCHOOL CONSTRUCTION BUILD.
TEPA EC, LLC
$218.7M
CONSTRUCT HYDROLOGIC INSTRUMENTATION FACILITY IN TUSCALOOSA, AL
JCCBG
$89.9M
NAMA 216042 LINCOLN MEMORIAL REHABILITATION
CONSIGLI CONSTRUCTION CO., INC.
$56.2M
PEFO 267538 REHABILITATE PAINTED DESERT COMMUNITY COMPLEX
STRONGHOLD ENGINEERING INC
$38.1M
YOSE 154910B AHWAHNEE HOTEL SEISMIC UPGRADES- YOSEMITE NATIONAL PARK
PERINI MANAGEMENT SERVICES, INC.
$37.7M
Stay Updated
Get notified about new opportunities matching your interests.