This contract expires in 326 days (Aug 4, 2027).
JACOBS ENGINEERING GROUP INC. - PROVIDE DESIGN PACKAGES FOR THE REPLACEMENT OF THE EXISTING N238 BOILER AND N242 CHILLER UNITS AND INCLUDE ASBESTOS AND/OR LEAD PAINT ABATEMENT REQUIREMENTS.
Key Details
Description
PROVIDE DESIGN PACKAGES FOR THE REPLACEMENT OF THE EXISTING N238 BOILER AND N242 CHILLER UNITS AND INCLUDE ASBESTOS AND/OR LEAD PAINT ABATEMENT REQUIREMENTS.
Context & Analysis
On Aug 5, 2026, National Aeronautics and Space Administration obligated $299,960.6 to JACOBS ENGINEERING GROUP INC. for provide design packages for the replacement of the existing n238 boiler and n242 chiller units and include asbestos and/or lead paint abatement requirements.. The award is classified under NAICS 541310 — ARCHITECTURAL SERVICES. Competition extent: full and open competition with 5 offers received. Performance is located in MOUNTAIN VIEW, CA. The contract is scheduled through Aug 4, 2027 — approximately 11 months remaining. This award is one of several similar procurements from National Aeronautics and Space Administration under NAICS 541310 — related awards are listed below.
Contractor Information
Similar Awards
IGF::OT::IGF PROVIDE A&E SERVICES TO THE NASA AMES RESEARCH FACILITIES ENGINEERING BRANCH THAT INCLUDE FACILITY MASTER PLANNING, FACILITY ARCHITECTURAL ENGINEERING DESIGN, CONSTRUCTION MANAGEMENT, ENERGY AND WATER CONSERVATION PROGRAM MANAGEMENT, FACILITY SPACE UTILIZATION ASSESSMENTS, REAL PROPERTY MANAGEMENT, FEASIBILITY STUDIES AND ENGINEERING SERVICES.
AECOM TECHNICAL SERVICES, INC.
$104.5M
POST DESIGN SWITCHGEAR RING BUS SERVICES
HDR ARCHITECTURE INC
$1.1M
POST DESIGN SWITCHGEAR RING BUS SERVICES
HDR ARCHITECTURE INC
$909,492.93
POST DESIGN SWITCHGEAR RING BUS SERVICES
HDR ARCHITECTURE INC
$909,492.93
THIS TASK ORDER CONSISTS OF PROVIDING A-E SERVICES FOR PROJECT CONTROL NUMBER: DR1609, DESIGN OF A NEW STORMWATER DRAINAGE SYSTEM
JACOBS ENGINEERING GROUP INC.
$849,748.77
Stay Updated
Get notified about new opportunities matching your interests.