This contract expires in 192 days (Oct 26, 2026).
JJH EARTHWORKS LLC - CONSTRUCTION SERVICES FOR PROJECT WA ERFO FS MTBKR605 2020-1(1), MT. BAKER-SNOQUALMIE REPAIRS 2020, PHASE 1 & WA ERFO FS MTBKR605 2022-1(1), MT. BAKER-SNOQUALMIE ERFO REPAIRS 2022
Key Details
Description
CONSTRUCTION SERVICES FOR PROJECT WA ERFO FS MTBKR605 2020-1(1), MT. BAKER-SNOQUALMIE REPAIRS 2020, PHASE 1 & WA ERFO FS MTBKR605 2022-1(1), MT. BAKER-SNOQUALMIE ERFO REPAIRS 2022
Contractor Information
Similar Awards
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.0M
NP-COLO 1A21, B42, C18, D51 - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 10.3 MILES OF THE COLONIAL PARKWAY (PARKWAY) FROM MILEPOST (MP) 0.17 TO MP 1.61 AND MP 6.02 TO MP 14.88 WITHIN COLONIAL NATIONAL HISTORICAL PARK. THE WORK INCL
WAGMAN HEAVY CIVIL INC
$130.1M
NP-COLO 1A21, B42, C18, D51 - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 10.3 MILES OF THE COLONIAL PARKWAY (PARKWAY) FROM MILEPOST (MP) 0.17 TO MP 1.61 AND MP 6.02 TO MP 14.88 WITHIN COLONIAL NATIONAL HISTORICAL PARK. THE WORK INCL
WAGMAN HEAVY CIVIL INC
$130.1M
PROJECT NP-BLRI 2B13, 2H17, ETC: THE PROJECT CONSISTS OF THE RECONSTRUCTION AND REHABILITATION OF THE BLUE RIDGE PARKWAY IN NORTH CAROLINA FROM MILEPOST 229.6 TO MP 305.1, INCLUDING OVERLOOKS, PARKING AREAS AND RAMPS. WORK ALSO INCLUDES DRAINAGE ASS
MAYMEAD INC
$107.4M
PROJECT PR ER PRMNT RPR (10) THE PROJECT CONSISTS OF REPAIRING DAMAGE CAUSED BY HURRICANES IRMA AND MARIA ON PR-10 BETWEEN KMS 41.6 AND 47.5. THE WORK INCLUDES EMBANKMENT RECONSTRUCTION, REINFORCED SOIL SLOPE SYSTEMS CONSTRUCTION, DRAINAGE SYSTEM
LPC CONTRACTORS INC
$80.7M
Stay Updated
Get notified about new opportunities matching your interests.