This contract expires in 291 days (Jun 30, 2027).
JPI CONSTRUCTION LLC - THE WORK INCLUDES EMBANKMENT RECONSTRUCTION, GABION WALLS, DRAINAGE SYSTEMS INSTALLATION, AND SOLDIER PILE RETAINING WALL WITH CONCRETE LAGGING, MILLING AND OVERLAY, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS, REMOVAL AND REPLACEMENT OF GUARDRAILS, S
Key Details
Description
THE WORK INCLUDES EMBANKMENT RECONSTRUCTION, GABION WALLS, DRAINAGE SYSTEMS INSTALLATION, AND SOLDIER PILE RETAINING WALL WITH CONCRETE LAGGING, MILLING AND OVERLAY, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS, REMOVAL AND REPLACEMENT OF GUARDRAILS, S
Context & Analysis
On Jul 21, 2023, Department of Transportation obligated $6,146,565 to JPI CONSTRUCTION LLC for the work includes embankment reconstruction, gabion walls, drainage systems installation, and soldier pile retaining wall with concrete lagging, milling and overlay, pavement reconstruction, pavement …. The award is classified under NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Performance is located in MAUNABO, PR. The contract is scheduled through Jun 30, 2027 — approximately 10 months remaining. This award is one of several similar procurements from Department of Transportation under NAICS 237310 — related awards are listed below.
Contractor Information
Related Federal Investment
Similar Awards
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.9M
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.0M
NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL
FORT MYER CONSTRUCTION CORP
$173.1M
NP-COLO 1A21, B42, C18, D51 - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 10.3 MILES OF THE COLONIAL PARKWAY (PARKWAY) FROM MILEPOST (MP) 0.17 TO MP 1.61 AND MP 6.02 TO MP 14.88 WITHIN COLONIAL NATIONAL HISTORICAL PARK. THE WORK INCL
WAGMAN HEAVY CIVIL INC
$130.1M
NP-COLO 1A21, B42, C18, D51 - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 10.3 MILES OF THE COLONIAL PARKWAY (PARKWAY) FROM MILEPOST (MP) 0.17 TO MP 1.61 AND MP 6.02 TO MP 14.88 WITHIN COLONIAL NATIONAL HISTORICAL PARK. THE WORK INCL
WAGMAN HEAVY CIVIL INC
$130.1M