This contract expires in 244 days (Dec 17, 2026).
LORR CONSTRUCTION, INC. - THE FORT RANDALL DAM SPILLWAY BRIDGE ABUTMENT REPAIR AND BEARING REPLACEMENT CONSISTS OF REMOVING AND REPLACING DAMAGED CONCRETE ON THE ABUTMENT, AND REPLACE BRIDGE BEARINGS AT THE ABUTMENT.
Key Details
Description
THE FORT RANDALL DAM SPILLWAY BRIDGE ABUTMENT REPAIR AND BEARING REPLACEMENT CONSISTS OF REMOVING AND REPLACING DAMAGED CONCRETE ON THE ABUTMENT, AND REPLACE BRIDGE BEARINGS AT THE ABUTMENT.
Contractor Information
Similar Awards
CONSTRUCTION OF PHYSICAL SECURITY/SAFETY IMPROVEMENTS IN THE NEW YORK, NY AREA (MANHATTAN AND BROOKLYN BOROUGHS) ON AND AROUND LONG SPAN BRIDGES.
KIEWIT INFRASTRUCTURE CO.
$443.7M
JBE054 RUNWAY EXTENSION, JBER, ALASKA
KIEWIT INFRASTRUCTURE WEST CO.
$377.3M
REPAIR TAXIWAY PAVEMENTS, NAS OCEANA
THE LANE CONSTRUCTION CORPORATION
$207.8M
DESIGN-BUILD CONSTRUCTION OF A NEW WEIR OPENING AT THE SITE OF THE MCCLELLAN-KERR ARKANSAS NAVIGATION SYSTEM, THREE RIVES, PRE-CONSTRUCTION, ENGINEERING AND DESIGN (PED), DESHA AND ARKANSAS COUNTIES, AR (HISTORIC CLOSURE STRUCTURE - 145), TICHNOR, AR
BFBC LLC
$182.2M
THE PURPOSE OF THIS CONTRACT WILL BE TO PROVIDE DESIGN-BUILD CONSTRUCTION SERVICES FOR THE APPROXIMATE 20-MILE PRIMARY BARRIER REPLACEMENT PROJECT ON THE BARRY M. GOLDWATER RANGE BMGR IN THE U.S. BORDER PATROLS YUMA SECTOR IN ARIZONA.
BFBC LLC
$181.6M
Stay Updated
Get notified about new opportunities matching your interests.