MANSON CONSTRUCTION CO - THE WORK INCLUDES ANNUAL MAINTENANCE DREDGING OF THE OAKLAND INNER AND OUTER HARBOR CHANNEL TO -50-FT (MLLW) PLUS 1-FT OF PAID OVER-DEPTH AND TRANSPORTING OF THE DREDGED MATERIAL PER THE REQUIREMENTS IN SPECIFICATION SECTION 00 10 00
Key Details
Description
THE WORK INCLUDES ANNUAL MAINTENANCE DREDGING OF THE OAKLAND INNER AND OUTER HARBOR CHANNEL TO -50-FT (MLLW) PLUS 1-FT OF PAID OVER-DEPTH AND TRANSPORTING OF THE DREDGED MATERIAL PER THE REQUIREMENTS IN SPECIFICATION SECTION 00 10 00
Context & Analysis
On Dec 5, 2025, Department of Defense obligated $25,424,971.06 to MANSON CONSTRUCTION CO for the work includes annual maintenance dredging of the oakland inner and outer harbor channel to -50-ft (mllw) plus 1-ft of paid over-depth and transporting of the dredged material per the requirements …. The award is classified under NAICS 237990 — OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION. Performance is located in SAN FRANCISCO, CA. This award is one of several similar procurements from Department of Defense under NAICS 237990 — related awards are listed below.
Contractor Information
Similar Awards
FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JOINT BASE PEARL HARBOR HICKAM, HAWAII
DRAGADOS/HAWAIIAN DREDGING/ORION JV
$3.1B
FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JOINT BASE PEARL HARBOR HICKAM, HAWAII
DRAGADOS/HAWAIIAN DREDGING/ORION JV
$2.8B
FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JOINT BASE PEARL HARBOR HICKAM, HAWAII
DRAGADOS/HAWAIIAN DREDGING/ORION JV
$2.8B
CENTRAL EVERGLADES PLANNING PROJECT (CEPP) CONTRACT 11B, EVERGLADES AGRICULTURAL AREA (EAA) A-2 RESERVOIR EMBANKMENT AND STRUCTURES, PALM BEACH COUNTY, FLORIDA
THALLE CONSTRUCTION CO INC
$2.5B
CONSTRUCTION OF THE NEW THIRD LOCK, NEW LOCK AT THE SOO, SAULT STE. MARIE, MICHIGAN.
KOKOSING ALBERICI TRAYLOR, LLC
$1.9B
Stay Updated
Get notified about new opportunities matching your interests.