This contract expires in 400 days (Oct 15, 2027).
MARCUM & SONS LLC - 0614 (UMA) 54 ROAD FLOOD REPAIR CONSTRUCTION PHASE 2
Key Details
Description
0614 (UMA) 54 ROAD FLOOD REPAIR CONSTRUCTION PHASE 2
Context & Analysis
On Sep 30, 2025, Department of Agriculture obligated $1,102,306.08 to MARCUM & SONS LLC for 0614 (uma) 54 road flood repair construction phase 2. The award is classified under NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Performance is located in PENDLETON, OR. The contract is scheduled through Oct 15, 2027 — approximately 13 months remaining. This award is one of several similar procurements from Department of Agriculture under NAICS 237310 — related awards are listed below.
Contractor Information
Similar Awards
MORATORIUM EXCEPTION" BLI DDVAK725 HURRICANE HELENE VCT DISASTER RECON DESIGN-BUILD HURRICANE HELENE IN VA
KIEWIT INFRASTRUCTURE SOUTH CO
$260.6M
MORATORIUM EXCEPTION" BLI DDVAK725 HURRICANE HELENE VCT DISASTER RECON DESIGN-BUILD HURRICANE HELENE IN VA
KIEWIT INFRASTRUCTURE SOUTH CO
$241.8M
MORATORIUM EXCEPTION" BLI DDVAK725 HURRICANE HELENE VCT DISASTER RECON DESIGN-BUILD HURRICANE HELENE IN VA
KIEWIT INFRASTRUCTURE SOUTH CO
$240.6M
THE GILA NATIONAL FOREST HAS A REQUIREMENT FOR THE REHABILITATION AND MAINTENANCE OF NATIONAL FOREST SYSTEM ROAD (NFSR) 141 FROM MILEPOST 0.69 TO MILEPOST 18.81. WORK INCLUDES BUT IS NOT LIMITED TO PULVERIZING THE ENTIRE EXISTING CHIP SEAL SURFACE T
SURFACE CONTRACTING, INC
$13.3M
THIS PROJECT IS FOR ROAD REPAIR CONSTRUCTION SERVICES ON THE MONONGAHELA NATIONAL FOREST, FOREST ROAD 86. WORK INCLUDES BUT IS NOT LIMITED TO BASE FAILURE REPAIR, PAVEMENT FAILURE REPAIR, AND RESURFACING.
GAVER INDUSTRIES, INC.
$8.2M
Stay Updated
Get notified about new opportunities matching your interests.