MASSIVE KINETICS CONTRACTING, LLC - THE IRC NOAA BUILDING NEEDS AN ARC FLASH STUDY, WHICH HAS NEVER BEEN DONE SINCE THE BUILDING CONCEPTION. THIS IS A REQUIREMENT THAT IS NECESSARY TO PROVIDE A SAFE WORK ENVIRONMENT FOR THE PERSONNEL MAINTAINING ELECTRICAL EQUIPMENT. THIS REQUIREMENT S
Key Details
Description
THE IRC NOAA BUILDING NEEDS AN ARC FLASH STUDY, WHICH HAS NEVER BEEN DONE SINCE THE BUILDING CONCEPTION. THIS IS A REQUIREMENT THAT IS NECESSARY TO PROVIDE A SAFE WORK ENVIRONMENT FOR THE PERSONNEL MAINTAINING ELECTRICAL EQUIPMENT. THIS REQUIREMENT S
Contractor Information
Similar Awards
WCDAS EBI REPLACEMENT CONSTRUCTION
PROFESSIONALS HIR LLC
$2.2M
THE EXISTING EPG SYSTEMS LOCATED AT THE WFO LOS ANGELES/OXNARD (LOX) AND THE WFO SAN JOAQUIN VALLEY / HANFORD LOCATION (HNX) HAVE SURPASSED THEIR LIFE EXPECTANCY WITH AVAILABILITY OF PARTS AND REPAIRS BECOMING INCREASINGLY DIFFICULT TO MAINTAIN. AT E
CEBUANA CONSTRUCTION INC
$1.6M
WCDAS EBI REPLACEMENT CONSTRUCTION
PROFESSIONALS HIR LLC
$1.3M
OU19-25-NEW-184 CONSTRUCTION SERVICES FOR REPLACEMENT OF UNINTERRUPTABLE POWER SUPPLY SYSTEMS AT AML LABORATORY
NATIVE SONS, LTD.
$1.1M
SITE MEDIUM VOLTAGE PREVENTATIVE MAINTENANCE
INTERNATIONAL POWER SYSTEMS, INC
$914,674.24
Stay Updated
Get notified about new opportunities matching your interests.