COST PLUS FIXED FEENO SET ASIDE USED.

MAXAR SPACE ROBOTICS LLC - SAMPLR: SAMPLE ACQUISITION, MORPHOLOGY FILTERING, AND PROBING OF LUNAR REGOLITH SELECTED UNDER THE NASA RESEARCH OPPORTUNITIES IN SPACE AND EARTH SCIENCES (ROSES) LUNAR SURFACE INSTRUMENT AND TECHNOLOGY PAYLOADS (LSITP) (AO) NNH18ZDA001N

PIID: 80MSFC20C0026Solicitation ID: NNH18ZDA001N
Signed Date: Dec 22, 2025Effective Date: Jan 10, 2020End Date: Closed on Mar 31, 2026

Key Details

Dollars Obligated
$7.4M
Base & All Options
$238,750
Awarding Sub-Agency
National Aeronautics and Space Administration
Product Service Code
AZ12 - R&D- OTHER RESEARCH AND DEVELOPMENT (APPLIED RESEARCH/EXPLORATORY DEVELOPMENT)
Extent Competed
FULL AND OPEN COMPETITION
Number of Offers
1
Place of Performance
PASADENA, CA, 911032466, CD-CA-30

Description

SAMPLR: SAMPLE ACQUISITION, MORPHOLOGY FILTERING, AND PROBING OF LUNAR REGOLITH SELECTED UNDER THE NASA RESEARCH OPPORTUNITIES IN SPACE AND EARTH SCIENCES (ROSES) LUNAR SURFACE INSTRUMENT AND TECHNOLOGY PAYLOADS (LSITP) (AO) NNH18ZDA001N

Contractor Information

UEI: QKERJFSNK136
CAGE Code: 5YZ96
Location: PASADENA, CA

Similar Awards

TAS::80 0122::TAS DEVELOPMENT, MANUFACTURING AND SUPPORT TO WEATHER OBSERVING INSTRUMENT

L3HARRIS TECHNOLOGIES, INC.

$1.0B

GROUND SYSTEMS AND MISSION OPERATIONS (GSMO-3)

KBR WYLE SERVICES, LLC

$547.8M

IGF::OT::IGF GROUND SYSTEMS AND MISSION OPERATIONS 2 (GSMO-2). THE PURPOSE OF THIS PROCUREMENT IS TO ACQUIRE ENGINEERING SERVICES FOR GROUND SYSTEMS AND MISSION OPERATIONS SUPPORT TO MORE THAN 20 MISSIONS IN PHASES OF THE LIFECYCLE FROM PRE-PHASE A TO PHASE E. THE SCOPE ENCOMPASSES CONCEPT STUDIES, DEVELOPMENT (DEFINITION AND IMPLEMENTATION), INTEGRATION, TEST, VERIFICATION, OPERATIONS, SUSTAINMENT OF MISSION OPERATIONS SYSTEMS, SUBSYSTEMS, AND OPERATIONS PROCESSES AND PROCEDURES. SERVICES INVOLVE SYSTEMS ENGINEERING, FACILITY ENGINEERING, LAUNCH AND EARLY ORBIT SUPPORT, FLIGHT OPERATIONS, FLIGHT DYNAMICS SUPPORT, AND SUSTAINING ENGINEERING.

KBR WYLE SERVICES, LLC

$506.6M

TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS

LOCKHEED MARTIN CORPORATION

$486.1M

IGF::OT::IGF EXPENDABLE LAUNCH VEHICLE INTEGRATED SUPPORT 3 (ELVIS 3)

AI SOLUTIONS INC

$372.2M

Stay Updated

Get notified about new opportunities matching your interests.

Related