MC3 SOLUTIONS LLC - PROJECT NP NATR 5570-463P: THE PROJECT CONSISTS OF THE INSTALLATION OF ARCHITECTURAL STEEL POST AND MESH BARRIER SYSTEM ON THE NATCHEZ TRACE DOUBLE ARCH BRIDGE. THE WORK ON THE BRIDGE INCLUDES THE REMOVAL OF THE EXISTING TEMPORARY FENCE, REPAIR OF T
Key Details
Description
PROJECT NP NATR 5570-463P: THE PROJECT CONSISTS OF THE INSTALLATION OF ARCHITECTURAL STEEL POST AND MESH BARRIER SYSTEM ON THE NATCHEZ TRACE DOUBLE ARCH BRIDGE. THE WORK ON THE BRIDGE INCLUDES THE REMOVAL OF THE EXISTING TEMPORARY FENCE, REPAIR OF T
Context & Analysis
On Dec 9, 2025, Department of Transportation obligated $5,827,322.85 to MC3 SOLUTIONS LLC for project np natr 5570-463p: the project consists of the installation of architectural steel post and mesh barrier system on the natchez trace double arch bridge. the work on the bridge includes the rem…. The award is classified under NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION and issued as a firm fixed price contract. Competition extent: full and open competition after exclusion of sources with 5 offers received. The procurement used a SMALL BUSINESS SET ASIDE - TOTAL set-aside. Performance is located in FRANKLIN, TN. The contract is scheduled through Sep 24, 2027 — approximately 13 months remaining. This award is one of several similar procurements from Department of Transportation under NAICS 237310 — related awards are listed below.
Contractor Information
Similar Awards
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.9M
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.0M
NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL
FORT MYER CONSTRUCTION CORP
$173.1M
NP-COLO 1A21, B42, C18, D51 - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 10.3 MILES OF THE COLONIAL PARKWAY (PARKWAY) FROM MILEPOST (MP) 0.17 TO MP 1.61 AND MP 6.02 TO MP 14.88 WITHIN COLONIAL NATIONAL HISTORICAL PARK. THE WORK INCL
WAGMAN HEAVY CIVIL INC
$130.1M
NP-COLO 1A21, B42, C18, D51 - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 10.3 MILES OF THE COLONIAL PARKWAY (PARKWAY) FROM MILEPOST (MP) 0.17 TO MP 1.61 AND MP 6.02 TO MP 14.88 WITHIN COLONIAL NATIONAL HISTORICAL PARK. THE WORK INCL
WAGMAN HEAVY CIVIL INC
$130.1M
Stay Updated
Get notified about new opportunities matching your interests.