MISSOURI RIVER CONTRACTORS, LLC - WY NP GRTE 13(1), REPAIR NORTH PARK ROAD AT MILEPOST 15.8. WORK INCLUDES ASPHALT SURFACE REPAIR, DEEP PATCH, ROADWAY EXCAVATION, GEOTECHNICAL STABILIZATION AND UNDERDRAIN SYSTEM.
Key Details
Description
WY NP GRTE 13(1), REPAIR NORTH PARK ROAD AT MILEPOST 15.8. WORK INCLUDES ASPHALT SURFACE REPAIR, DEEP PATCH, ROADWAY EXCAVATION, GEOTECHNICAL STABILIZATION AND UNDERDRAIN SYSTEM.
Context & Analysis
On May 19, 2026, Department of Transportation obligated $1,631,895 to MISSOURI RIVER CONTRACTORS, LLC for wy np grte 13(1), repair north park road at milepost 15.8. work includes asphalt surface repair, deep patch, roadway excavation, geotechnical stabilization and underdrain system.. The award is classified under NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION and issued as a j contract. Competition extent: full and open competition with 4 offers received. Performance is located in MORAN, WY. This award is one of several similar procurements from Department of Transportation under NAICS 237310 — related awards are listed below.
Contractor Information
Similar Awards
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.9M
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.0M
NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL
FORT MYER CONSTRUCTION CORP
$175.1M
NP-COLO 1A21, B42, C18, D51 - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 10.3 MILES OF THE COLONIAL PARKWAY (PARKWAY) FROM MILEPOST (MP) 0.17 TO MP 1.61 AND MP 6.02 TO MP 14.88 WITHIN COLONIAL NATIONAL HISTORICAL PARK. THE WORK INCL
WAGMAN HEAVY CIVIL INC
$130.1M
PROJECT VA ST ANC(1): THE PROJECT CONSISTS OF THE REALIGNMENT OF COLUMBIA PIKE AND S. JOYCE STREET, REPLACEMENT OF SOUTHGATE ROAD WITH A NEW SEGMENT OF S. NASH STREET, THE EXPANSION OF FOXCROFT HEIGHTS PARK, AND THE MODIFICATION OF THE COLUMBIA PI
KOKOSING CONSTRUCTION COMPANY, INC.
$123.9M
Stay Updated
Get notified about new opportunities matching your interests.