This contract expires in 328 days (Apr 30, 2027).
NEW TECH SOLUTIONS, INC. - COPYSTORM APPLICATION INSPECTS THE SALESFORCE METADATA, RECREATES THE TABLE STRUCTURE AND THEN LOADS THE DATA. EVERY TIME COPYSTORM RUNS CHANGES MADE TO THE SALESFORCE STRUCTURE ARE REFLECTED IN THE DATABASE AS WELL AS ANY ADDED OR MODIFIED RECORDS.
Key Details
Description
COPYSTORM APPLICATION INSPECTS THE SALESFORCE METADATA, RECREATES THE TABLE STRUCTURE AND THEN LOADS THE DATA. EVERY TIME COPYSTORM RUNS CHANGES MADE TO THE SALESFORCE STRUCTURE ARE REFLECTED IN THE DATABASE AS WELL AS ANY ADDED OR MODIFIED RECORDS.
Context & Analysis
Department of Homeland Security obligated $609,675.04 to NEW TECH SOLUTIONS, INC. for copystorm application inspects the salesforce metadata, recreates the table structure and then loads the data. every time copystorm runs changes made to the salesforce structure are reflected in the d…. Performance is located in DC. The contract is scheduled through Apr 30, 2027 — approximately 11 months remaining. This award is one of several similar procurements from Department of Homeland Security — related awards are listed below.
Contractor Information
Related Federal Investment
Similar Awards
THE UNITED STATES COAST GUARD HAS A REQUIREMENT TO PROCURE UP TO TWENTY-SIX (26) FAST RESPONSE CUTTERS (FRCS) ON A FIRM FIXED PRICE (FFP) BASIS WITH AN ECONOMIC PRICE ADJUSTMENT (EPA). PHASE II OF THE FRC PROGRAM WILL COMPLETE THE FLEET FOR A TOTAL OF 58 CUTTERS.
BOLLINGER SHIPYARDS LOCKPORT, L.L.C.
$2.0B
DESIGN AND CONSTRUCT NEW VERTICAL BARRIER AND POWER DISTRIBUTION, LIGHTING, CAMERAS, EQUIPMENT SHELTERS AND LINEAR GROUND DETECTION SYSTEM (LGDS) IN HILDAGO COUNTY, NM.
FISHER SAND & GRAVEL CO
$1.8B
YUM-2 VERTICAL BORDER AND WATERBORNE BARRIER CONSTRUCTION
FISHER SAND & GRAVEL CO
$1.7B
CONSTRUCT VERTICAL BORDER BARRIER
FISHER SAND & GRAVEL CO
$1.6B
BULK STEEL FOR SOUTHWEST BORDER BARRIER CONSTRUCTION PROJECTS
AMI METALS, INC
$1.5B
Stay Updated
Get notified about new opportunities matching your interests.