FIRM FIXED PRICENO SET ASIDE USED.

OUTPOST TECHNOLOGIES, INC. - DELIVERY FOR ONE-HALF INCH STAINLESS STEEL QUICK DISCONNECT DESIGN AND ONE-FOURTH INCH TITANIUM QD DESIGN AND HARDWARE. MATURE QD DESIGNS BASED OFF

PIID: 80JSC024CA001Solicitation ID: 80JSC023QD
Signed Date: Feb 9, 2026Effective Date: Dec 4, 2023End Date: Closed on Mar 31, 2026

Key Details

Dollars Obligated
$1.2M
Base & All Options
$84,121.4
Awarding Sub-Agency
National Aeronautics and Space Administration
Product Service Code
AR12 - SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; APPLIED RESEARCH
Extent Competed
NOT COMPETED
Number of Offers
1
Place of Performance
HUNTSVILLE, AL, 358161826, CD-AL-05

Description

DELIVERY FOR ONE-HALF INCH STAINLESS STEEL QUICK DISCONNECT DESIGN AND ONE-FOURTH INCH TITANIUM QD DESIGN AND HARDWARE. MATURE QD DESIGNS BASED OFF

Context & Analysis

On Feb 9, 2026, National Aeronautics and Space Administration obligated $1,165,374.76 to OUTPOST TECHNOLOGIES, INC. for delivery for one-half inch stainless steel quick disconnect design and one-fourth inch titanium qd design and hardware. mature qd designs based off. The award is classified under NAICS 541330 — ENGINEERING SERVICES and issued as a firm fixed price contract. Competition extent: not competed with 1 offer received. The procurement used a NO SET ASIDE USED. set-aside. Performance is located in HUNTSVILLE, AL. This award is one of several similar procurements from National Aeronautics and Space Administration under NAICS 541330 — related awards are listed below.

Contractor Information

UEI: VLL4N165PT51
CAGE Code: 7Y9K3
Location: HUNTSVILLE, AL

Similar Awards

TAS::80 0122::TAS DEVELOPMENT, MANUFACTURING AND SUPPORT TO WEATHER OBSERVING INSTRUMENT

L3HARRIS TECHNOLOGIES, INC.

$1.0B

GROUND SYSTEMS AND MISSION OPERATIONS (GSMO-3)

KBR WYLE SERVICES, LLC

$547.8M

IGF::OT::IGF GROUND SYSTEMS AND MISSION OPERATIONS 2 (GSMO-2). THE PURPOSE OF THIS PROCUREMENT IS TO ACQUIRE ENGINEERING SERVICES FOR GROUND SYSTEMS AND MISSION OPERATIONS SUPPORT TO MORE THAN 20 MISSIONS IN PHASES OF THE LIFECYCLE FROM PRE-PHASE A TO PHASE E. THE SCOPE ENCOMPASSES CONCEPT STUDIES, DEVELOPMENT (DEFINITION AND IMPLEMENTATION), INTEGRATION, TEST, VERIFICATION, OPERATIONS, SUSTAINMENT OF MISSION OPERATIONS SYSTEMS, SUBSYSTEMS, AND OPERATIONS PROCESSES AND PROCEDURES. SERVICES INVOLVE SYSTEMS ENGINEERING, FACILITY ENGINEERING, LAUNCH AND EARLY ORBIT SUPPORT, FLIGHT OPERATIONS, FLIGHT DYNAMICS SUPPORT, AND SUSTAINING ENGINEERING.

KBR WYLE SERVICES, LLC

$506.6M

TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS

LOCKHEED MARTIN CORPORATION

$486.1M

IGF::OT::IGF EXPENDABLE LAUNCH VEHICLE INTEGRATED SUPPORT 3 (ELVIS 3)

AI SOLUTIONS INC

$372.2M

Stay Updated

Get notified about new opportunities matching your interests.

Related