This contract expires in 173 days (Oct 11, 2026).
PARRAID LLC - PARRAID EXTENDED PRODUCT SUPPORT
Key Details
Description
PARRAID EXTENDED PRODUCT SUPPORT
Context & Analysis
On Dec 1, 2025, National Aeronautics and Space Administration obligated $10,368 to PARRAID LLC for parraid extended product support. The award is classified under NAICS 541330 — ENGINEERING SERVICES and issued as a firm fixed price contract. Competition extent: not competed under sap with 1 offer received. The procurement used a NO SET ASIDE USED. set-aside. Performance is located in HOLLYWOOD, MD. The contract is scheduled through Oct 11, 2026 — approximately 6 months remaining. This award is one of several similar procurements from National Aeronautics and Space Administration under NAICS 541330 — related awards are listed below.
Contractor Information
Similar Awards
TAS::80 0122::TAS DEVELOPMENT, MANUFACTURING AND SUPPORT TO WEATHER OBSERVING INSTRUMENT
L3HARRIS TECHNOLOGIES, INC.
$1.0B
GROUND SYSTEMS AND MISSION OPERATIONS (GSMO-3)
KBR WYLE SERVICES, LLC
$547.8M
IGF::OT::IGF GROUND SYSTEMS AND MISSION OPERATIONS 2 (GSMO-2). THE PURPOSE OF THIS PROCUREMENT IS TO ACQUIRE ENGINEERING SERVICES FOR GROUND SYSTEMS AND MISSION OPERATIONS SUPPORT TO MORE THAN 20 MISSIONS IN PHASES OF THE LIFECYCLE FROM PRE-PHASE A TO PHASE E. THE SCOPE ENCOMPASSES CONCEPT STUDIES, DEVELOPMENT (DEFINITION AND IMPLEMENTATION), INTEGRATION, TEST, VERIFICATION, OPERATIONS, SUSTAINMENT OF MISSION OPERATIONS SYSTEMS, SUBSYSTEMS, AND OPERATIONS PROCESSES AND PROCEDURES. SERVICES INVOLVE SYSTEMS ENGINEERING, FACILITY ENGINEERING, LAUNCH AND EARLY ORBIT SUPPORT, FLIGHT OPERATIONS, FLIGHT DYNAMICS SUPPORT, AND SUSTAINING ENGINEERING.
KBR WYLE SERVICES, LLC
$506.6M
TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS
LOCKHEED MARTIN CORPORATION
$486.1M
IGF::OT::IGF EXPENDABLE LAUNCH VEHICLE INTEGRATED SUPPORT 3 (ELVIS 3)
AI SOLUTIONS INC
$372.2M
Stay Updated
Get notified about new opportunities matching your interests.