This contract expires in 481 days (Sep 30, 2027).

Browse related active opportunities

COST PLUS FIXED FEENO SET ASIDE USED.

PERATON INC. - OPERATIONS AND MANAGEMENT OF THE NASA BALLOON FACILITY

PIID: 80GSFC22CA019Solicitation ID: 80GSFC20R0031
Signed Date: Dec 10, 2025Effective Date: Jun 1, 2022End Date: Closes in 481 days
Award $
$148.0M
Vendor
PERATON INC.
NAICS
541330
Signed Date
Dec 10, 2025

Key Details

Dollars Obligated
$148.0M
Base & All Options
Awarding Sub-Agency
National Aeronautics and Space Administration
Product Service Code
M1HA - OPERATION OF GOVERNMENT-OWNED CONTRACTOR-OPERATED (GOCO) R&D FACILITIES
Extent Competed
FULL AND OPEN COMPETITION
Number of Offers
6
Place of Performance
PALESTINE, TX, 758032169, CD-TX-06

Description

OPERATIONS AND MANAGEMENT OF THE NASA BALLOON FACILITY

Context & Analysis

On Dec 10, 2025, National Aeronautics and Space Administration obligated $148,000,803.02 to PERATON INC. for operations and management of the nasa balloon facility. The award is classified under NAICS 541330 — ENGINEERING SERVICES and issued as a cost plus fixed fee contract. Competition extent: full and open competition with 6 offers received. The procurement used a NO SET ASIDE USED. set-aside. Performance is located in PALESTINE, TX. The contract is scheduled through Sep 30, 2027 — approximately 16 months remaining. This award is one of several similar procurements from National Aeronautics and Space Administration under NAICS 541330 — related awards are listed below.

Contractor Information

Contractor: PERATON INC.
UEI: ZBPQEJVECCT4
CAGE Code: 0HD54
Location: HERNDON, VA

Similar Awards

TAS::80 0122::TAS DEVELOPMENT, MANUFACTURING AND SUPPORT TO WEATHER OBSERVING INSTRUMENT

L3HARRIS TECHNOLOGIES, INC.

$1.0B

GROUND SYSTEMS AND MISSION OPERATIONS (GSMO-3)

KBR WYLE SERVICES, LLC

$547.8M

IGF::OT::IGF GROUND SYSTEMS AND MISSION OPERATIONS 2 (GSMO-2). THE PURPOSE OF THIS PROCUREMENT IS TO ACQUIRE ENGINEERING SERVICES FOR GROUND SYSTEMS AND MISSION OPERATIONS SUPPORT TO MORE THAN 20 MISSIONS IN PHASES OF THE LIFECYCLE FROM PRE-PHASE A TO PHASE E. THE SCOPE ENCOMPASSES CONCEPT STUDIES, DEVELOPMENT (DEFINITION AND IMPLEMENTATION), INTEGRATION, TEST, VERIFICATION, OPERATIONS, SUSTAINMENT OF MISSION OPERATIONS SYSTEMS, SUBSYSTEMS, AND OPERATIONS PROCESSES AND PROCEDURES. SERVICES INVOLVE SYSTEMS ENGINEERING, FACILITY ENGINEERING, LAUNCH AND EARLY ORBIT SUPPORT, FLIGHT OPERATIONS, FLIGHT DYNAMICS SUPPORT, AND SUSTAINING ENGINEERING.

KBR WYLE SERVICES, LLC

$506.6M

TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS

LOCKHEED MARTIN CORPORATION

$486.1M

IGF::OT::IGF EXPENDABLE LAUNCH VEHICLE INTEGRATED SUPPORT 3 (ELVIS 3)

AI SOLUTIONS INC

$372.2M

Stay Updated

Get notified about new opportunities matching your interests.

Related