This contract expires in 30 days (May 17, 2026).
PRIME COAT II LLC - THE SELECTED CONTRACTOR SHALL PROVIDE ALL MATERIALS, LABOR, AND EQUIPMENT TO REPAIR SHU SHOWERS AT THE METROPOLITAN CORRECTIONAL CENTER (MCC), LOCATED IN CHICAGO, ILLINOIS, IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK AND DRAWINGS.
Key Details
Description
THE SELECTED CONTRACTOR SHALL PROVIDE ALL MATERIALS, LABOR, AND EQUIPMENT TO REPAIR SHU SHOWERS AT THE METROPOLITAN CORRECTIONAL CENTER (MCC), LOCATED IN CHICAGO, ILLINOIS, IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK AND DRAWINGS.
Contractor Information
Similar Awards
ACADEMIC ZONE DESIGN-BUILD PROJECT, REDSTONE ARSENAL, ALABAMA
BRASFIELD & GORRIE LLC
$518.0M
DESIGN BUILD FCI LEAVENWORTH
CLARK CONSTRUCTION GROUP LLC
$464.0M
DESIGN AND CONSTRUCTION OF THE TECHNOLOGY BUILDINGS 2 & 3 WITH PARKING GARAGES
BRASFIELD & GORRIE LLC
$406.5M
A: PROJECT TITLE: PRACTICAL PROBLEM VENUE (PPV) B: SET ASIDE: NONE/FULL AND OPEN C: MAGNITUDE OF CONSTRUCTION: ESTIMATED BETWEEN 100,000,001 AND $250,000,000.
BRASFIELD & GORRIE LLC
$147.6M
JEFFERSON DORM RENOVATION PROJECT.
BL HARBERT INTERNATIONAL LLC
$92.4M
Stay Updated
Get notified about new opportunities matching your interests.