This contract expires in 215 days (May 31, 2027).
RBA ENGINEERING INTERNATIONAL, PLLC - PROJECT NP ROCR 15(2) THIS PROJECT CONSISTS OF REPLACEMENT OF THE JOYCE ROAD BRIDGE OVER LUZON BRANCH INCLUDING MODIFICATIONS TO EXISTING WALLS TO ACCOMMODATE THE NEW BRIDGE, RIP RAP TO PROTECT THE EXISTING ABUTMENT IN PLACE, NEW APPROACH SLABS, MIL
Key Details
Description
PROJECT NP ROCR 15(2) THIS PROJECT CONSISTS OF REPLACEMENT OF THE JOYCE ROAD BRIDGE OVER LUZON BRANCH INCLUDING MODIFICATIONS TO EXISTING WALLS TO ACCOMMODATE THE NEW BRIDGE, RIP RAP TO PROTECT THE EXISTING ABUTMENT IN PLACE, NEW APPROACH SLABS, MIL
Context & Analysis
On Jul 19, 2024, Department of Transportation obligated $3,309,879.58 to RBA ENGINEERING INTERNATIONAL, PLLC for project np rocr 15(2) this project consists of replacement of the joyce road bridge over luzon branch including modifications to existing walls to accommodate the new bridge, rip rap to protect the ex…. The award is classified under NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Performance is located in WASHINGTON, DC. The contract is scheduled through May 31, 2027 — approximately 7 months remaining.
Contractor Information
Stay Updated
Get notified about new opportunities matching your interests.