This contract expires in 260 days (May 31, 2027).
RBA ENGINEERING INTERNATIONAL, PLLC - PROJECT NP ROCR 15(2) THIS PROJECT CONSISTS OF REPLACEMENT OF THE JOYCE ROAD BRIDGE OVER LUZON BRANCH INCLUDING MODIFICATIONS TO EXISTING WALLS TO ACCOMMODATE THE NEW BRIDGE, RIP RAP TO PROTECT THE EXISTING ABUTMENT IN PLACE, NEW APPROACH SLABS, MIL
Key Details
Description
PROJECT NP ROCR 15(2) THIS PROJECT CONSISTS OF REPLACEMENT OF THE JOYCE ROAD BRIDGE OVER LUZON BRANCH INCLUDING MODIFICATIONS TO EXISTING WALLS TO ACCOMMODATE THE NEW BRIDGE, RIP RAP TO PROTECT THE EXISTING ABUTMENT IN PLACE, NEW APPROACH SLABS, MIL
Context & Analysis
On Jul 19, 2024, Department of Transportation obligated $3,309,879.58 to RBA ENGINEERING INTERNATIONAL, PLLC for project np rocr 15(2) this project consists of replacement of the joyce road bridge over luzon branch including modifications to existing walls to accommodate the new bridge, rip rap to protect the ex…. The award is classified under NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Performance is located in WASHINGTON, DC. The contract is scheduled through May 31, 2027 — approximately 9 months remaining. This award is one of several similar procurements from Department of Transportation under NAICS 237310 — related awards are listed below.
Contractor Information
Similar Awards
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.9M
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.0M
NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL
FORT MYER CONSTRUCTION CORP
$173.1M
NP-COLO 1A21, B42, C18, D51 - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 10.3 MILES OF THE COLONIAL PARKWAY (PARKWAY) FROM MILEPOST (MP) 0.17 TO MP 1.61 AND MP 6.02 TO MP 14.88 WITHIN COLONIAL NATIONAL HISTORICAL PARK. THE WORK INCL
WAGMAN HEAVY CIVIL INC
$130.1M
NP-COLO 1A21, B42, C18, D51 - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 10.3 MILES OF THE COLONIAL PARKWAY (PARKWAY) FROM MILEPOST (MP) 0.17 TO MP 1.61 AND MP 6.02 TO MP 14.88 WITHIN COLONIAL NATIONAL HISTORICAL PARK. THE WORK INCL
WAGMAN HEAVY CIVIL INC
$130.1M
Stay Updated
Get notified about new opportunities matching your interests.