This contract expires in 123 days (Feb 23, 2027).
RIOMAR GROUP VENTURES, INC. - PROVIDE DESIGN-BUILD SERVICES AS REQUIRED TO STABILIZE THE PIER AT THE NATIONAL OCEANICA AND ATMOSPHERIC ADMINISTRATION (NOAA) STELLWAGEN BANK NATIONAL MARINE SANCTUARY (SBNMS) CENTER IN SCITUATE, MASSACHUSETTS. THE PIER WAS REPAIRED IN 2020 BUT IS N
Key Details
Description
PROVIDE DESIGN-BUILD SERVICES AS REQUIRED TO STABILIZE THE PIER AT THE NATIONAL OCEANICA AND ATMOSPHERIC ADMINISTRATION (NOAA) STELLWAGEN BANK NATIONAL MARINE SANCTUARY (SBNMS) CENTER IN SCITUATE, MASSACHUSETTS. THE PIER WAS REPAIRED IN 2020 BUT IS N
Context & Analysis
On Sep 25, 2026, Department of Commerce obligated $390,400 to RIOMAR GROUP VENTURES, INC. for provide design-build services as required to stabilize the pier at the national oceanica and atmospheric administration (noaa) stellwagen bank national marine sanctuary (sbnms) center in scituate, mas…. The award is classified under NAICS 237990 — OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION. Competition extent: not available for competition with 1 offer received. The procurement used a NO SET ASIDE USED. set-aside. Performance is located in SCITUATE, MA. The contract is scheduled through Feb 23, 2027 — approximately 4 months remaining. This award is one of several similar procurements from Department of Commerce under NAICS 237990 — related awards are listed below.
Contractor Information
Related Federal Investment
Similar Awards
DESIGN BUILD CONSTRUCTION AT PIER ROMEO IN NORTH CHARLESTON SC.
MANSON CONSTRUCTION CO
$69.9M
MANCHESTER PIER SHIMMING PROJECT
BALLARD MARINE CONSTRUCTION LLC
$367,350
OU19-25-NEW-244 / 1333ND25CNB190019 NOAA ANDERSON DITCH, NIST, BOULDER, CO
FAR SOLUTIONS LLC
$343,525
MECHANICAL UPGRADE FOR REFRIGERATORS/FREEZER
ADVANCED LOGISTIC PARTNERS INC
$165,700