This contract expires in 126 days (Aug 27, 2026).

Browse related active opportunities

FIRM FIXED PRICE

RS&H, INC. - A-E POST DESIGN SERVICES

PIID: 80JSC024FA121
Signed Date: Dec 16, 2025Effective Date: May 21, 2024End Date: Closes in 126 days

Key Details

Dollars Obligated
$689,195.9
Base & All Options
$232,246.05
Awarding Sub-Agency
National Aeronautics and Space Administration
Product Service Code
C1BZ - ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER AIRFIELD STRUCTURES
Extent Competed
FULL AND OPEN COMPETITION
Number of Offers
1
Place of Performance
HOUSTON, TX, 770583696, CD-TX-36

Description

A-E POST DESIGN SERVICES

Context & Analysis

On Dec 16, 2025, National Aeronautics and Space Administration obligated $689,195.9 to RS&H, INC. for a-e post design services. The award is classified under NAICS 541330 — ENGINEERING SERVICES and issued as a firm fixed price contract. Competition extent: full and open competition with 1 offer received. Performance is located in HOUSTON, TX. The contract is scheduled through Aug 27, 2026 — approximately 4 months remaining. This award is one of several similar procurements from National Aeronautics and Space Administration under NAICS 541330 — related awards are listed below.

Contractor Information

Contractor: RS&H, INC.
UEI: K1DZAEQHLZJ8
CAGE Code: 5D911
Location: MERRITT ISLAND, FL

Similar Awards

TAS::80 0122::TAS DEVELOPMENT, MANUFACTURING AND SUPPORT TO WEATHER OBSERVING INSTRUMENT

L3HARRIS TECHNOLOGIES, INC.

$1.0B

GROUND SYSTEMS AND MISSION OPERATIONS (GSMO-3)

KBR WYLE SERVICES, LLC

$547.8M

IGF::OT::IGF GROUND SYSTEMS AND MISSION OPERATIONS 2 (GSMO-2). THE PURPOSE OF THIS PROCUREMENT IS TO ACQUIRE ENGINEERING SERVICES FOR GROUND SYSTEMS AND MISSION OPERATIONS SUPPORT TO MORE THAN 20 MISSIONS IN PHASES OF THE LIFECYCLE FROM PRE-PHASE A TO PHASE E. THE SCOPE ENCOMPASSES CONCEPT STUDIES, DEVELOPMENT (DEFINITION AND IMPLEMENTATION), INTEGRATION, TEST, VERIFICATION, OPERATIONS, SUSTAINMENT OF MISSION OPERATIONS SYSTEMS, SUBSYSTEMS, AND OPERATIONS PROCESSES AND PROCEDURES. SERVICES INVOLVE SYSTEMS ENGINEERING, FACILITY ENGINEERING, LAUNCH AND EARLY ORBIT SUPPORT, FLIGHT OPERATIONS, FLIGHT DYNAMICS SUPPORT, AND SUSTAINING ENGINEERING.

KBR WYLE SERVICES, LLC

$506.6M

TAS::80 0110::TAS GEOSTATIONARY LIGHTNING MAPPER (GLM) INSTRUMENT THE FOR GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES (GOES) R. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER (TO THE DESIGNATED DESTINATION) AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR AN ENGINEERING DEVELOPMENT UNIT (EDU) AND 4 FLIGHT MODELS B) ONE GLM ENGINEERING DEVELOPMENT UNIT (EDU) C) ONE GLM PROTO-FLIGHT MODEL (PFM) DESIGNATED FLIGHT MODEL-1 (FM-1) D) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) E) TWO GLM EMULATORS (GLME) F) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) G) ONE GROUND PROCESSING DEMONSTRATION SYSTEM (GPDS) H) SPARES FOR THE FOUR FMS I) ALL ADDITIONAL GLM MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT J) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS

LOCKHEED MARTIN CORPORATION

$486.1M

IGF::OT::IGF EXPENDABLE LAUNCH VEHICLE INTEGRATED SUPPORT 3 (ELVIS 3)

AI SOLUTIONS INC

$372.2M

Stay Updated

Get notified about new opportunities matching your interests.

Related