This contract expires in 122 days (Jan 13, 2027).
RYMARC CONSTRUCTION INC - 8(A) SOLE SOURCE CONSTRUCTION CONTRACT CONTRACTOR FOR SUB-SURFACE PREPARATION WORK, CURB AND SIDEWALK CONSTRUCTION, PAVING AND FENCING/GATING OF THE LOT AT BUILDING 20404 AT KIRTLAND AFB.
Key Details
Description
8(A) SOLE SOURCE CONSTRUCTION CONTRACT CONTRACTOR FOR SUB-SURFACE PREPARATION WORK, CURB AND SIDEWALK CONSTRUCTION, PAVING AND FENCING/GATING OF THE LOT AT BUILDING 20404 AT KIRTLAND AFB.
Context & Analysis
On Sep 8, 2026, Department of the Interior obligated $738,130.62 to RYMARC CONSTRUCTION INC for 8(a) sole source construction contract contractor for sub-surface preparation work, curb and sidewalk construction, paving and fencing/gating of the lot at building 20404 at kirtland afb.. The award is classified under NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Performance is located in KIRTLAND AFB, NM. The contract is scheduled through Jan 13, 2027 — approximately 4 months remaining. This award is one of several similar procurements from Department of the Interior under NAICS 237310 — related awards are listed below.
Contractor Information
Similar Awards
GWMP 335115 BRIDGE PRESERVATION
RBA ENGINEERING INTERNATIONAL, PLLC
$15.5M
OZAR 223690 - PAVEMENT PRESERVATION FOR 3 MISSOURI NATIONAL PARKS - N122 GWCA 318349 OZAR 223690 WICR 226956. THIS PAVEMENT PRESERVATIONS PROJECT IS COMPOSED OF 3 PARKS IN MISSOURI. OZARK NATIONAL SCENIC RIVERWAY (OZAR), GEORGE WASHINGTON CARVER
DMS CONTRACTING INC
$15.3M
NERI 227185 N156 REND TRAIL BRIDGES AND
GUARDIAN CONSTRUCTION, INC.
$11.8M
REHABILITATE THE LINCOLN MEMORIAL BRIDGE - DESIGN BUILD PROGRAM OF REQUIREMENTS
JOHN CECIL CONSTRUCTION, LLC
$8.8M
GRAND TETON NATIONAL PARK (GRTE), TAGGART LAKE AREA RENEWAL - PMIS 314711