This contract expires in 195 days (Oct 29, 2026).
S.E.A. CONSTRUCTION LLC - CONSTRUCTION SERVICE: WA NP OLYM 115(1), REPAIR STORM DAMAGE ON MORA ROAD. THIS PROJECT IS LOCATED APPROXIMATELY 15 MILES W OF FORKS (CITY). THIS WORK CONSISTS OF: BANK STABILIZATION, RIPRAP, ENGINEERED LOG JAMS.
Key Details
Description
CONSTRUCTION SERVICE: WA NP OLYM 115(1), REPAIR STORM DAMAGE ON MORA ROAD. THIS PROJECT IS LOCATED APPROXIMATELY 15 MILES W OF FORKS (CITY). THIS WORK CONSISTS OF: BANK STABILIZATION, RIPRAP, ENGINEERED LOG JAMS.
Contractor Information
Similar Awards
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.0M
NP-COLO 1A21, B42, C18, D51 - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 10.3 MILES OF THE COLONIAL PARKWAY (PARKWAY) FROM MILEPOST (MP) 0.17 TO MP 1.61 AND MP 6.02 TO MP 14.88 WITHIN COLONIAL NATIONAL HISTORICAL PARK. THE WORK INCL
WAGMAN HEAVY CIVIL INC
$130.1M
NP-COLO 1A21, B42, C18, D51 - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 10.3 MILES OF THE COLONIAL PARKWAY (PARKWAY) FROM MILEPOST (MP) 0.17 TO MP 1.61 AND MP 6.02 TO MP 14.88 WITHIN COLONIAL NATIONAL HISTORICAL PARK. THE WORK INCL
WAGMAN HEAVY CIVIL INC
$130.1M
PROJECT NP-BLRI 2B13, 2H17, ETC: THE PROJECT CONSISTS OF THE RECONSTRUCTION AND REHABILITATION OF THE BLUE RIDGE PARKWAY IN NORTH CAROLINA FROM MILEPOST 229.6 TO MP 305.1, INCLUDING OVERLOOKS, PARKING AREAS AND RAMPS. WORK ALSO INCLUDES DRAINAGE ASS
MAYMEAD INC
$107.4M
PROJECT PR ER PRMNT RPR (10) THE PROJECT CONSISTS OF REPAIRING DAMAGE CAUSED BY HURRICANES IRMA AND MARIA ON PR-10 BETWEEN KMS 41.6 AND 47.5. THE WORK INCLUDES EMBANKMENT RECONSTRUCTION, REINFORCED SOIL SLOPE SYSTEMS CONSTRUCTION, DRAINAGE SYSTEM
LPC CONTRACTORS INC
$80.7M
Stay Updated
Get notified about new opportunities matching your interests.