This contract expires in 67 days (Dec 30, 2026).
SAYLOR CONSTRUCTION LLC - SURFACE BLADING WITH ROLLING, ROADSIDE VEG REMOVAL AND LOGOUT ON THE UMPQUA NF
Key Details
Description
SURFACE BLADING WITH ROLLING, ROADSIDE VEG REMOVAL AND LOGOUT ON THE UMPQUA NF
Context & Analysis
On Aug 17, 2026, Department of Agriculture obligated $184,964.5 to SAYLOR CONSTRUCTION LLC for surface blading with rolling, roadside veg removal and logout on the umpqua nf. The award is classified under NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Competition extent: competed under sap with 7 offers received. The procurement used a SMALL BUSINESS SET ASIDE - TOTAL set-aside. Performance is located in ROSEBURG, OR. The contract is scheduled through Dec 30, 2026 — approximately 2 months remaining. This award is one of several similar procurements from Department of Agriculture under NAICS 237310 — related awards are listed below.
Contractor Information
Similar Awards
MORATORIUM EXCEPTION" BLI DDVAK725 HURRICANE HELENE VCT DISASTER RECON DESIGN-BUILD HURRICANE HELENE IN VA
KIEWIT INFRASTRUCTURE SOUTH CO
$260.6M
MORATORIUM EXCEPTION" BLI DDVAK725 HURRICANE HELENE VCT DISASTER RECON DESIGN-BUILD HURRICANE HELENE IN VA
KIEWIT INFRASTRUCTURE SOUTH CO
$241.8M
THE GILA NATIONAL FOREST HAS A REQUIREMENT FOR THE REHABILITATION AND MAINTENANCE OF NATIONAL FOREST SYSTEM ROAD (NFSR) 141 FROM MILEPOST 0.69 TO MILEPOST 18.81. WORK INCLUDES BUT IS NOT LIMITED TO PULVERIZING THE ENTIRE EXISTING CHIP SEAL SURFACE T
SURFACE CONTRACTING, INC
$13.3M
THIS PROJECT IS FOR ROAD REPAIR CONSTRUCTION SERVICES ON THE MONONGAHELA NATIONAL FOREST, FOREST ROAD 86. WORK INCLUDES BUT IS NOT LIMITED TO BASE FAILURE REPAIR, PAVEMENT FAILURE REPAIR, AND RESURFACING.
GAVER INDUSTRIES, INC.
$8.2M
UNAKA ROAD REPAIRS FROM HURRICANE HELENE. REPLACEMENT OR REPAIR OF 22 MILES OF ROAD.
WILLIAMS CONSTRUCTION & CABINETRY, INC.
$7.5M
Stay Updated
Get notified about new opportunities matching your interests.