This contract expires in 182 days (Dec 5, 2026).
SES CONSTRUCTION AND FUEL SERVICES LLC - REPLACE ROOF AND ROOFTOP HEATING, VENTILATING AND AIR CONDITIONING (HVAC) EQUIPMENT ON THE BOOSTER FABRICATION FACILITY (BFF) COMPLEX MANUFACTURING AND ADMINISTRATION BUILDING.
Key Details
Description
REPLACE ROOF AND ROOFTOP HEATING, VENTILATING AND AIR CONDITIONING (HVAC) EQUIPMENT ON THE BOOSTER FABRICATION FACILITY (BFF) COMPLEX MANUFACTURING AND ADMINISTRATION BUILDING.
Context & Analysis
On Nov 26, 2025, National Aeronautics and Space Administration obligated $12,974,088 to SES CONSTRUCTION AND FUEL SERVICES LLC for replace roof and rooftop heating, ventilating and air conditioning (hvac) equipment on the booster fabrication facility (bff) complex manufacturing and administration building.. The award is classified under NAICS 236210 — INDUSTRIAL BUILDING CONSTRUCTION and issued as a firm fixed price contract. Competition extent: full and open competition after exclusion of sources with 4 offers received. Performance is located in ORLANDO, FL. The contract is scheduled through Dec 5, 2026 — approximately 6 months remaining. This award is one of several similar procurements from National Aeronautics and Space Administration under NAICS 236210 — related awards are listed below.
Contractor Information
Similar Awards
DESIGN AND CONSTRUCTION OF THE NASA SPACE LAUNCH SYSTEM (SLS) MOBILE LAUNCHER 2 (ML2).
BECHTEL NATIONAL, INC.
$1.5B
FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
PRECISION MECHANICAL INC
$73.0M
FABRICATION AND CONSTRUCTION OF LIQUID HYDROGEN (LH2) SYSTEM AT LAUNCH COMPLEX 39B, KENNEDY SPACE CENTER, FL
PRECISION MECHANICAL INC
$73.0M
ENVIRONMENTAL CONTROL SYSTEM (ECS) IN HIGH BAY THREE (HB-3) OF THE VEHICLE ASSEMBLY BUILDING (VAB).
HEALTHEON, INC
$39.4M
DEMOLITION OF BUILDING 1100 CENTER SECTION AND WEST WING AT STENNIS SPACE CENTER, MS
ADVON CORPORATION
$32.5M
Stay Updated
Get notified about new opportunities matching your interests.