STEVE MANNING CONSTRUCTION INC - OR NPS CRLA 13(1), REHABILITATE EAST RIM DRIVE
Key Details
Description
OR NPS CRLA 13(1), REHABILITATE EAST RIM DRIVE
Context & Analysis
On Nov 12, 2025, Department of Transportation obligated $58,172,609.15 to STEVE MANNING CONSTRUCTION INC for or nps crla 13(1), rehabilitate east rim drive. The award is classified under NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION and issued as a firm fixed price contract. Competition extent: full and open competition with 3 offers received. The procurement used a NO SET ASIDE USED. set-aside. Performance is located in KLAMATH FALLS, OR. This award is one of several similar procurements from Department of Transportation under NAICS 237310 — related awards are listed below.
Market context
- Recompete outlook
- Ended Oct 1, 2026 (26 days ago). Recompete signal as of Oct 16, 2026: 51/100, combining time to the end date, the incumbent's history with this agency, whether the award was competed, and its size.
- Competition
- Competed, with 3 offers. 96% of 360 awards in this market (Department of Transportation awards in NAICS 237310 over the last 3 years) were competed; median 4 offers.
- Award size
- At $58.2M, this award is larger than 19 in 20 of the 393 priced Department of Transportation awards in NAICS 237310 over the last 3 years (median $3.9M).
- Incumbent at this agency
- STEVE MANNING CONSTRUCTION INC has 5 other awards from Department of Transportation, totalling $135.4M, 2024–2026.
- Largest vendors in this market
By obligations, Department of Transportation awards in NAICS 237310 over the last 3 years.
- GRANITE CONSTRUCTION COMPANY — 8 awards, $264.0M
- WAGMAN HEAVY CIVIL INC — 2 awards, $260.2M
- ESTES BROS. CONST. INC. — 16 awards, $185.0M
- KOKOSING CONSTRUCTION COMPANY, INC. — 3 awards, $143.3M
- ECLIPSE COMPANIES, LLC — 18 awards, $125.2M
Computed from USAspending award data on Oct 16, 2026.
Contractor Information
Similar Awards
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.9M
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.0M
NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL
FORT MYER CONSTRUCTION CORP
$175.1M
NP-COLO 1A21, B42, C18, D51 - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 10.3 MILES OF THE COLONIAL PARKWAY (PARKWAY) FROM MILEPOST (MP) 0.17 TO MP 1.61 AND MP 6.02 TO MP 14.88 WITHIN COLONIAL NATIONAL HISTORICAL PARK. THE WORK INCL
WAGMAN HEAVY CIVIL INC
$130.1M
PROJECT VA ST ANC(1): THE PROJECT CONSISTS OF THE REALIGNMENT OF COLUMBIA PIKE AND S. JOYCE STREET, REPLACEMENT OF SOUTHGATE ROAD WITH A NEW SEGMENT OF S. NASH STREET, THE EXPANSION OF FOXCROFT HEIGHTS PARK, AND THE MODIFICATION OF THE COLUMBIA PI
KOKOSING CONSTRUCTION COMPANY, INC.
$123.9M
Stay Updated
Get notified about new opportunities matching your interests.