This contract expires in 47 days (Oct 30, 2026).
STEWART JOEY - FY26-004154 ROAD REPAIRS DUE TO HELENE ROADS 125C, 149, 149A, AND 190A THIS TASK ORDER INCORPORATES THE MANDATORY CONTRACT CLAUSE FAR 52.222 90, ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS, AS REQUIRED BY EXECUTIVE ORDER 14398.
Key Details
Description
FY26-004154 ROAD REPAIRS DUE TO HELENE ROADS 125C, 149, 149A, AND 190A THIS TASK ORDER INCORPORATES THE MANDATORY CONTRACT CLAUSE FAR 52.222 90, ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS, AS REQUIRED BY EXECUTIVE ORDER 14398.
Context & Analysis
On May 20, 2026, Department of Agriculture obligated $447,582 to STEWART JOEY for fy26-004154 road repairs due to helene roads 125c, 149, 149a, and 190a this task order incorporates the mandatory contract clause far 52.222 90, addressing dei discrimination by federal contractors, a…. The award is classified under NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Performance is located in BUDE, MS. The contract is scheduled through Oct 30, 2026 — approximately 2 months remaining. This award is one of several similar procurements from Department of Agriculture under NAICS 237310 — related awards are listed below.
Contractor Information
Similar Awards
MORATORIUM EXCEPTION" BLI DDVAK725 HURRICANE HELENE VCT DISASTER RECON DESIGN-BUILD HURRICANE HELENE IN VA
KIEWIT INFRASTRUCTURE SOUTH CO
$260.6M
MORATORIUM EXCEPTION" BLI DDVAK725 HURRICANE HELENE VCT DISASTER RECON DESIGN-BUILD HURRICANE HELENE IN VA
KIEWIT INFRASTRUCTURE SOUTH CO
$241.8M
MORATORIUM EXCEPTION" BLI DDVAK725 HURRICANE HELENE VCT DISASTER RECON DESIGN-BUILD HURRICANE HELENE IN VA
KIEWIT INFRASTRUCTURE SOUTH CO
$240.6M
THE GILA NATIONAL FOREST HAS A REQUIREMENT FOR THE REHABILITATION AND MAINTENANCE OF NATIONAL FOREST SYSTEM ROAD (NFSR) 141 FROM MILEPOST 0.69 TO MILEPOST 18.81. WORK INCLUDES BUT IS NOT LIMITED TO PULVERIZING THE ENTIRE EXISTING CHIP SEAL SURFACE T
SURFACE CONTRACTING, INC
$13.3M
THIS PROJECT IS FOR ROAD REPAIR CONSTRUCTION SERVICES ON THE MONONGAHELA NATIONAL FOREST, FOREST ROAD 86. WORK INCLUDES BUT IS NOT LIMITED TO BASE FAILURE REPAIR, PAVEMENT FAILURE REPAIR, AND RESURFACING.
GAVER INDUSTRIES, INC.
$8.2M