This contract expires in 102 days (Feb 4, 2027).
SUPERIOR STRUCTURES LLC - 47PM0125C0026 - EAST GARAGE-EMERGENCY TEMPORARY SHORING - PROJECT TO INSTALL SHORING DUE TO SEVERE WATER DAMAGE TO EXPANSION JOINT. POP: 9/12/25 - 3/18/25 (187 CALENDAR DAYS). LOCATED: PERKINS BUILDING - 200 CONSTITUTION AVENUE, WASHINGTON DC 20210.
Key Details
Description
47PM0125C0026 - EAST GARAGE-EMERGENCY TEMPORARY SHORING - PROJECT TO INSTALL SHORING DUE TO SEVERE WATER DAMAGE TO EXPANSION JOINT. POP: 9/12/25 - 3/18/25 (187 CALENDAR DAYS). LOCATED: PERKINS BUILDING - 200 CONSTITUTION AVENUE, WASHINGTON DC 20210.
Context & Analysis
On Sep 25, 2025, General Services Administration obligated $985,325.69 to SUPERIOR STRUCTURES LLC for 47pm0125c0026 - east garage-emergency temporary shoring - project to install shoring due to severe water damage to expansion joint. pop: 9/12/25 - 3/18/25 (187 calendar days). located: perkins buildi…. The award is classified under NAICS 236220 — COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION. Performance is located in WASHINGTON, DC. The contract is scheduled through Feb 4, 2027 — approximately 3 months remaining. This award is one of several similar procurements from General Services Administration under NAICS 236220 — related awards are listed below.
Contractor Information
Similar Awards
IRA: PROVIDE LABOR, MATERIALS, SUPERVISION, AND EQUIPMENT TO CONSTRUCT THE NEW CISA HQ BUILDING. SERVICES INCLUDE, BUT ARE NOT LIMITED: CIVIL AND SITE WORK CONSISTING OF HEAVY EARTH WORK, ETC.EXCAVATION, STABILIZATION OF EXISTING SLOPE, FOUNDATIONS
CLARK CONSTRUCTION GROUP LLC
$616.2M
IRA: PROVIDE LABOR, MATERIALS, SUPERVISION, AND EQUIPMENT TO CONSTRUCT THE NEW CISA HQ BUILDING. SERVICES INCLUDE, BUT ARE NOT LIMITED: CIVIL AND SITE WORK CONSISTING OF HEAVY EARTH WORK, ETC.EXCAVATION, STABILIZATION OF EXISTING SLOPE, FOUNDATIONS
CLARK CONSTRUCTION GROUP LLC
$559.0M
DESIGN-BUILD SERVICES FOR THE RAUL HECTOR CASTRO LAND PORT OF ENTRY IN DOUGLAS, AZ
HENSEL PHELPS CONSTRUCTION CO.
$374.9M
DESIGN-BUILD SERVICES FOR THE EXPANSION & MODERNIZATION PROJECT AT THE SAN LUIS I LAND PORT OF ENTRY IN SAN LUIS, AZ
HENSEL PHELPS CONSTRUCTION CO.
$343.4M
DESIGN-BUILD SERVICES FOR THE EXPANSION & MODERNIZATION PROJECT AT THE SAN LUIS I LAND PORT OF ENTRY IN SAN LUIS, AZ
HENSEL PHELPS CONSTRUCTION CO.
$343.3M
Stay Updated
Get notified about new opportunities matching your interests.