TAWREEK DIMENSIONS ESTABLISHMENT (TDE) - THE CONTRACTOR SHALL PROVIDE ALL NEEDED PARTICULARS REQUIRED TO DESIGN FOR DEMOLITION OF FAILED CULVERT SYSTEM, RE-BUILDING AND INSTALL OF NEW CULVERT SYSTEM, AND ASSOCIATED PAVEMENT STRUCTURE ON TAXIWAY S2 AT PRINCE SULTAN AIR BASE (PSAB), KSA.
Key Details
Description
THE CONTRACTOR SHALL PROVIDE ALL NEEDED PARTICULARS REQUIRED TO DESIGN FOR DEMOLITION OF FAILED CULVERT SYSTEM, RE-BUILDING AND INSTALL OF NEW CULVERT SYSTEM, AND ASSOCIATED PAVEMENT STRUCTURE ON TAXIWAY S2 AT PRINCE SULTAN AIR BASE (PSAB), KSA.
Contractor Information
Similar Awards
FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JOINT BASE PEARL HARBOR HICKAM, HAWAII
DRAGADOS/HAWAIIAN DREDGING/ORION JV
$2.8B
FY23 MCON PROJECT P-209, DRY DOCK 3 REPLACEMENT, JOINT BASE PEARL HARBOR HICKAM, HAWAII
DRAGADOS/HAWAIIAN DREDGING/ORION JV
$2.8B
CONSTRUCTION OF THE NEW THIRD LOCK, NEW LOCK AT THE SOO, SAULT STE. MARIE, MICHIGAN.
KOKOSING ALBERICI TRAYLOR, LLC
$1.9B
P-381 MULTI-MISSION DRY DOCK #1, PORTSMOUTH NAVAL SHIPYARD, KITTERY, ME
381 CONSTRUCTORS
$1.8B
NEW RIVER CHAMBER AT MONTGOMERY LOCKS & DAM
TRUMBULL CORPORATION AND BRAYMAN CONSTRUCTION CORPORATION, A JOINT VENTURE
$804.4M
Stay Updated
Get notified about new opportunities matching your interests.