This contract expires in 209 days (May 24, 2027).
TERRA SITE CONSTRUCTORS LLC - PA ERFO NP DEWA 2021-1(1) THE PROJECT CONSISTS OF REMOVING EXISTING ASPHALT PAVEMENT, CONVERT EXISTING GRAVEL BASE COURSE TO GRAVEL TRAIL, AND ROADWAY EXCAVATION TO PLACE 4 INCH OF TOPSOIL TO PLANT NATIVE VEGETATION. THE WORK INCLUDES ROADWAY EXC
Key Details
Description
PA ERFO NP DEWA 2021-1(1) THE PROJECT CONSISTS OF REMOVING EXISTING ASPHALT PAVEMENT, CONVERT EXISTING GRAVEL BASE COURSE TO GRAVEL TRAIL, AND ROADWAY EXCAVATION TO PLACE 4 INCH OF TOPSOIL TO PLANT NATIVE VEGETATION. THE WORK INCLUDES ROADWAY EXC
Context & Analysis
On Aug 28, 2026, Department of Transportation obligated $656,275.08 to TERRA SITE CONSTRUCTORS LLC for pa erfo np dewa 2021-1(1) the project consists of removing existing asphalt pavement, convert existing gravel base course to gravel trail, and roadway excavation to place 4 inch of topsoil to plant n…. The award is classified under NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. Competition extent: full and open competition after exclusion of sources with 4 offers received. Performance is located in PORTLAND, PA. The contract is scheduled through May 24, 2027 — approximately 7 months remaining. This award is one of several similar procurements from Department of Transportation under NAICS 237310 — related awards are listed below.
Contractor Information
Similar Awards
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.9M
THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F
GRANITE CONSTRUCTION COMPANY
$214.0M
NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL
FORT MYER CONSTRUCTION CORP
$175.1M
NP-COLO 1A21, B42, C18, D51 - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 10.3 MILES OF THE COLONIAL PARKWAY (PARKWAY) FROM MILEPOST (MP) 0.17 TO MP 1.61 AND MP 6.02 TO MP 14.88 WITHIN COLONIAL NATIONAL HISTORICAL PARK. THE WORK INCL
WAGMAN HEAVY CIVIL INC
$130.1M
PROJECT VA ST ANC(1): THE PROJECT CONSISTS OF THE REALIGNMENT OF COLUMBIA PIKE AND S. JOYCE STREET, REPLACEMENT OF SOUTHGATE ROAD WITH A NEW SEGMENT OF S. NASH STREET, THE EXPANSION OF FOXCROFT HEIGHTS PARK, AND THE MODIFICATION OF THE COLUMBIA PI
KOKOSING CONSTRUCTION COMPANY, INC.
$123.9M