This contract expires in 199 days (Mar 31, 2027).

Browse related active opportunities

COST NO FEENO SET ASIDE USED.

UNIVERSITY OF ARIZONA - OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO.

PIID: NNM10AA11C
Signed Date: Dec 3, 2025Effective Date: Mar 16, 2010End Date: Closes in 199 days
Award $
$132.3M
Vendor
UNIVERSITY OF ARIZONA
NAICS
541712
Signed Date
Dec 3, 2025

Key Details

Dollars Obligated
$132.3M
Base & All Options
Awarding Sub-Agency
National Aeronautics and Space Administration
Product Service Code
AR13 - SPACE R&D SERVICES; SPACE FLIGHT, RESEARCH AND SUPPORTING ACTIVITIES; EXPERIMENTAL DEVELOPMENT
Extent Competed
FULL AND OPEN COMPETITION
Number of Offers
999
Place of Performance
TUCSON, AZ, 857194824, CD-AZ-07

Description

OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO.

Context & Analysis

On Dec 3, 2025, National Aeronautics and Space Administration obligated $132,320,209.58 to UNIVERSITY OF ARIZONA for osiris - rex asteroid sample return mission. 1.1 osiris - rex deputy principal investigator, heather enos, osiris - rex business manager, dr. drake and dr. lauretta will have the overall responsibilit. The award is classified under NAICS 541712 — RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY) and issued as a cost no fee contract. Competition extent: full and open competition with 999 offers received. The procurement used a NO SET ASIDE USED. set-aside. Performance is located in TUCSON, AZ. The contract is scheduled through Mar 31, 2027 — approximately 7 months remaining. This award is one of several similar procurements from National Aeronautics and Space Administration under NAICS 541712 — related awards are listed below.

Contractor Information

UEI: ED44Y3W6P7B9
CAGE Code: 0LJH3
Location: TUCSON, AZ

Similar Awards

IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.

AEROJET ROCKETDYNE OF DE, INC

$3.2B

IGF::OT::IGF HUMAN HEALTH AND PERFORMANCE CONTRACT

KBR WYLE SERVICES, LLC

$1.6B

IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS

NORTHROP GRUMMAN SYSTEMS CORPORATION

$1.6B

IGF::OT::IGF NEXTSTEP NRA AWARD. THIS NEXTSTEP CONTRACT BUILDS UPON THE SUCCESS OF COMMERCIAL ORBITAL TRANSPORTATION SERVICES SPACE ACT AGREEMENT DEVELOPMENT PROGRAM AND AN EXISTING INTERNATIONAL SPACE STATION (ISS) COMMERCIAL RESUPPLY SERVICES (CRS) CONTRACT. ORBITAL HAS SUCCESSFULLY TRANSITIONED FROM COTS TO THE CRS PROGRAM, FLYING THREE VERY SUCCESSFUL PRESSURIZED CARGO RESUPPLY MISSIONS TO THE ISS, USING THE CYGNUS SPACECRAFT. ORBITAL ALSO SUCCESSFULLY DEVELOPED SPACECRAFT FOR SOLAR SYSTEM EXPLORATION TO INCLUDE THE CURRENTLY OPERATIONAL DAWN MISSION. THIS MISSION WAS LAUNCHED IN SEPTEMBER 2007, COMPLETED ITS RENDEZVOUS MISSION AT VESTA IN JULY 2012 AND IS EN ROUTE TO CERES IN EARLY 2015. WITH SPACE AGENCY BUDGETS CONTINUING TO BE TIGHT, EXPLORATION PLANS NEED TO EMPHASIZE EVOLUTION OF EXISTING SYSTEMS, WHERE COST AND SCHEDULE IS BETTER CONTROLLED, AND DEVELOPMENT RISK REDUCED. SPECIFICALLY, ELEMENTS OF THE CURRENT ISS, INCLUDING CYGNUS, CAN BE EVOLVED TO SUPPORT MORE DISTANT SPACE DESTINATIONS. TO SUPPORT THESE ENDEAVORS, ORBITAL CONTRIBUTES TO THE DEVELOPMENT AND PRODUCT IMPROVEMENT OF CYGNUS AND TO NEXTSTEP ACTIVITIES AND HAVE INVESTED IN THE COTS CRS PUBLIC-PRIVATE PARTNERSHIP ENDEAVOR. ORBITAL'S EXPLORATION AUGMENTATION MODULE (BAM) ARCHITECTURE USES A MODULAR, BUILDING BLOCK APPROACH THAT LEVERAGES THE CYGNUS SPACECRAFT TO EXPAND CISLUNAR AND LONG DURATION DEEP SPACE TRANSIT HABITATION CAPABILITIES AND TECHNOLOGIES CRITICAL TO NASAS LONG-TERM EXPLORATION GOALS. ORBITALS ARCHITECTURE CONCEPT BLENDS IN-PRODUCTION HARDWARE WITH ADAPTATION, EVOLUTION, PLANNING, AND FORWARD THINKING. CYGNUS WILL SERVE AS A MODULAR HABITAT AND TEST PLATFORM FOR QUALIFYING TECHNOLOGIES IN A DISTANT RETROGRADE ORBIT (DRO) OR IN A LOW EARTH ORBIT (LEO), EITHER WHILE ATTACHED TO THE ISS OR AS A FREE-FLYER. USING THE EXISTING, OPERATIONAL CYGNUS TO PERFORM THESE MISSIONS HAS THE ADVANTAGE OF DECREASING OVERALL DEVELOPMENT TIME AND COSTS, AND FREEING UP RESOURCES THAT WOULD BE SPENT ON DEVELOPING A SPACECRAFT TO FOCUS ON CULTIVATING MISSION ENABLING TECHNOLOGIES. THE GOAL IS TO HAVE A CYGNUS DERIVED EAM DEPLOYED IN CISLUNAR SPACE BEFORE 2020. THIS SPACECRAFT WILL BE THE FIRST BUILDING BLOCK IN SUPPORTING BOTH COMMERCIAL MARKETS AND GOVERNMENT OBJECTIVES. THE PROPOSED EFFORT FOR THIS NEXTSTEP BAA PHASE I, INVOLVES DEFINING AN EAM ARCHITECTURE AND CONCEPT OF OPERATIONS (CONOPS) THAT ADDRESSES COMMERCIAL MARKETS AND NASA EXPLORATION OBJECTIVES, TECHNOLOGY MATURATION PLANNING AND INFRASTRUCTURE DEVELOPMENT, AND TO IDENTIFY TECHNOLOGIES THAT CAN BE IMPLEMENTED AND DEMONSTRATED IN THE ISSILEO ENVIRONMENT WITHIN THE NEXT THREE YEARS. TO MATURE HABITATION TECHNOLOGIES, THE CONTRACTOR WILL IDENTIFY STATE OF THE ART (SOA) TECHNOLOGIES ACROSS NASA TECHNOLOGY AREAS (TAS) DEFINED IN THE NASA TECHNOLOGY ROADMAP. FOCUS WILL BE ON MATURATION OF THE FOLLOWING TECHNOLOGIES ENVIRONMENTAL CONTROL AND LIFE SUPPORT SYSTEMS ENVIRONMENTAL MONITORING SAFETY AND EMERGENCY RESPONSE AND HABITATION THERMAL CONTROL SYSTEMS AUTONOMOUS HABITATION SYSTEMS NAVIGATION SYSTEMS MANAGEMENT DOCKING AND CAPTURE MECHANISMS AND DEPLOYABLE HABITATION ELEMENTS

NORTHROP GRUMMAN SYSTEMS CORPORATION

$1.4B

IGF::CT::IGFMSOC FPDS-NG MISSION SYSTEMS OPERATIONS CONTRACT (MSOC)

KBR WYLE SERVICES, LLC

$1.0B

Stay Updated

Get notified about new opportunities matching your interests.

Related