This contract expires in 45 days (May 31, 2026).

Browse related active opportunities

FIRM FIXED PRICENO SET ASIDE USED.

UNIVERSITY OF KANSAS MEDICAL CENTER, THE - HOUSING FOR RODENTS AND BEHAVIOR TESTING AT THE UNIVERSITY OF KANSAS MEDICAL CENTER

PIID: 80NSSC26P0250Solicitation ID: 80NSSC25924080Q
Signed Date: Feb 17, 2026Effective Date: Feb 10, 2026End Date: Closes in 45 days

Key Details

Dollars Obligated
$47,790.5
Base & All Options
$47,790.5
Awarding Sub-Agency
National Aeronautics and Space Administration
Product Service Code
AJ11 - GENERAL SCIENCE AND TECHNOLOGY R&D SERVICES; GENERAL SCIENCE AND TECHNOLOGY; BASIC RESEARCH
Extent Competed
NOT COMPETED UNDER SAP
Number of Offers
1
Place of Performance
KANSAS CITY, KS, 661608500, CD-KS-03

Description

HOUSING FOR RODENTS AND BEHAVIOR TESTING AT THE UNIVERSITY OF KANSAS MEDICAL CENTER

Contractor Information

UEI: DT8EWSUNKHU1
CAGE Code: 99AV5
Location: KANSAS CITY, KS

Similar Awards

NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.

CALIFORNIA INSTITUTE OF TECHNOLOGY

$139.4M

TRANSITING EXOPLANET SURVEY SATELLITE (TESS) PROJECT. THIS CONTRACT IS FOR PERFORMANCE OF THE PHASE B BRIDGE PHASE OF THE TESS MISSION. EFFORTS INCLUDED, BUT LIMITED TO, ARE AS FOLLOWS: DEVELOP DOCUMENTATION, PLANS, AND SCHEDULES DEVELOP REQUIREMENTS IN PREPARATION FOR THE SYSTEMS REQUIREMENT REVIEW PERFORM THE TECHNICAL TRADE STUDIES OUTLINED IN THE CONCEPT STUDY REPORT, AND ANY OTHER TRADES IDENTIFIED DURING PHASE B BRIDGE PHASE PROVIDE OVERALL MANAGEMENT FOR THE PAYLOAD DEVELOPMENT PROVIDE TESS SYSTEMS ENGINEERING SUPPORT TO THE PROJECT IN COORDINATION WITH THE GSFC PROJECT SYSTEMS ENGINEER (PSE) MANAGE THE CONTRACTS OF VENDORS AND SUBCONTRACTORS AS NECESSARY DURING THE PHASE B BRIDGE PHASE ESTABLISH THE ELECTRONIC DATABASE OF TESS TECHNICAL REQUIREMENTS AND SPECIFICATIONS AS EACH DOCUMENT IS BASELINED. MAINTAIN COMPLETE TRACEABILITY AND CONFIGURATION CONTROL OF ALL TESS PROJECT REQUIREMENT DOCUMENTS. DELIVER DOCUMENTATION IN ACCORDANCE WITH CONTRACT REQUIREMENTS.

MASSACHUSETTS INSTITUTE OF TECHNOLOGY

$108.7M

SUPPORT FOR THE NASA SPACE GEODESY PROJECT (SGP) IN DEVELOPMENT AND MAINTENANCE OF NASA'S VERY LONG BASELINE INTERFEROMETRY (VLBI) STATIONS, THE PROCESSING OF VLBI DATA, AND SUPPORT FOR THE INTERNATIONAL VLBI SERVICE FOR GEODESY AND ASTROMETRY (IVS).

MASSACHUSETTS INSTITUTE OF TECHNOLOGY

$10.2M

VERY HIGH CYCLE FATIGUE AND SUPPLEMENTARY HIGH CYCLE FATIGUE TESTING OF ADDITIVE ALLOYS

UNIVERSITY OF TOLEDO

$349,814

DEVELOP AND TEST HLS GEOFM FOR LAND USE, CHANGE ATTRIBUTION AND BIOMASS PREDICTION

OREGON STATE UNIVERSITY

$249,972

Stay Updated

Get notified about new opportunities matching your interests.

Related