This contract expires in 74 days (Jun 30, 2026).
VERIZON BUSINESS NETWORK SERVICES LLC - THIS IS A FIRM FIXED PRICE (FFP) TASK ORDER FOR LOW LEVEL DESIGN (LLD) AND VERIZON PROOF OF CONCEPT LAB PLANNING. THIS TASK ORDER IS ORDERED IN ACCORDANCE WITH SECTION C.4.2, SUPPORT SERVICES (EXCLUDING ALL SUBSECTIONS AND C.4.1 J ATTACHMENTS).
Key Details
Description
THIS IS A FIRM FIXED PRICE (FFP) TASK ORDER FOR LOW LEVEL DESIGN (LLD) AND VERIZON PROOF OF CONCEPT LAB PLANNING. THIS TASK ORDER IS ORDERED IN ACCORDANCE WITH SECTION C.4.2, SUPPORT SERVICES (EXCLUDING ALL SUBSECTIONS AND C.4.1 J ATTACHMENTS).
Contractor Information
Similar Awards
SERVICES FOR SINGING RIVER ELECTRIC TO PROVIDE ENGINEERING SERVICES, MATERIALS, EQUIPMENT, LABOR, AND CONSTRUCTION TO PERMANENTLY RELOCATE IMPACTED UNDERGROUND ELECTRIC FACILITIES WITHIN THE LIMITS OF PROJECT MS NP GUIS 15(4).
SINGING RIVER ELECTRIC COOPERATIVE
$461,358.44
AGREEMENT TO PROVIDE ENGINEERING SERVICES, MATERIALS, EQUIPMENT, LABOR, AND CONSTRUCTION TO PERMANENTLY RELOCATE IMPACTED UNDERGROUND VERIZON FIBER OPTIC (FO) FACILITIES BETWEEN COLUMBIA PIKE AND ARMY NAVY DRIVE WHICH ARE IN DIRECT CONFLICT WITH THE
VERIZON VIRGINIA LLC
$316,019
O ACQUIRE LEASED SERVICES FROM AT&T FOR A SECONDARY INTERNET ACCESS POINT
AT&T ENTERPRISES, LLC
$231,710.16
INTERNET2 SERVICES.
UNIVERSITY CORPORATION FOR ADVANCED INTERNET DEVELOPMENT
$79,666
RELOCATION SERVICES FOR AFFECTED POWER CABLES AND FIBER OPTIC LINES ALONG COLUMBIA PIKE ARE PART OF THE ARLINGTON NATIONAL CEMETERY SOUTHERN EXPANSION, UNDER PROJECT VA ST ANC (1).
TRANSURBAN USA INC
$59,657
Stay Updated
Get notified about new opportunities matching your interests.