This contract expires in 221 days (Nov 24, 2026).
WAYSS & FREYTAG INGENIEURBAU AG - REPAIR PAVEMENT AT BOLLING DRIVE NEAR GAS STATION AT SPANGDAHLEM AB, IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW) DATED JULY 2025 AND CONTRACTOR PROPOSAL DATED 1 SEPTEMBER 2025.
Key Details
Description
REPAIR PAVEMENT AT BOLLING DRIVE NEAR GAS STATION AT SPANGDAHLEM AB, IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW) DATED JULY 2025 AND CONTRACTOR PROPOSAL DATED 1 SEPTEMBER 2025.
Contractor Information
Similar Awards
CONSTRUCTION OF PHYSICAL SECURITY/SAFETY IMPROVEMENTS IN THE NEW YORK, NY AREA (MANHATTAN AND BROOKLYN BOROUGHS) ON AND AROUND LONG SPAN BRIDGES.
KIEWIT INFRASTRUCTURE CO.
$443.7M
JBE054 RUNWAY EXTENSION, JBER, ALASKA
KIEWIT INFRASTRUCTURE WEST CO.
$377.3M
REPAIR TAXIWAY PAVEMENTS, NAS OCEANA
THE LANE CONSTRUCTION CORPORATION
$207.8M
DESIGN-BUILD CONSTRUCTION OF A NEW WEIR OPENING AT THE SITE OF THE MCCLELLAN-KERR ARKANSAS NAVIGATION SYSTEM, THREE RIVES, PRE-CONSTRUCTION, ENGINEERING AND DESIGN (PED), DESHA AND ARKANSAS COUNTIES, AR (HISTORIC CLOSURE STRUCTURE - 145), TICHNOR, AR
BFBC LLC
$182.2M
THE PURPOSE OF THIS CONTRACT WILL BE TO PROVIDE DESIGN-BUILD CONSTRUCTION SERVICES FOR THE APPROXIMATE 20-MILE PRIMARY BARRIER REPLACEMENT PROJECT ON THE BARRY M. GOLDWATER RANGE BMGR IN THE U.S. BORDER PATROLS YUMA SECTOR IN ARIZONA.
BFBC LLC
$181.6M
Stay Updated
Get notified about new opportunities matching your interests.